HARDTOP GAZEBO WITH NETTING If you have any questions about the outdoor gazebo, please feel free to contact us. Customer Service Email: Service@alaulm.com 1216Gazebo24 IMPORTANT PLEASE READ BEFORE YOU COMMENCE ASSEMBLY Follow the guidelines in this user guide to ensure correct assembly and care for this product.
SPECIFICATIONS 42.9 inch 122.0 inch 81.5 inch 135.4 inch 90.6 inch 122.0 inch 81.5 inch 183.5 inch 42.9 inch 90.6 inch 192.4 inch 01 144.
Catalog Specifications......................................................................................................... 01 Notice And Warning ........................................................................................... 03 Exploded Views ........................................................................................................ 05 First Part .............................................................................................................. 06 Second Part .......
NOTICE Note: The gazebo needs to be installed in cooperation with five people. The following tools are not included and needed for assembly: Pistol Drill Screw Driver Tape Measure 2 m Adjustable Ladder Hammer 5 people Warning 1. A 5 personal assembly is required for this gazebo. 2. Please take appropriate actions as heavy rain, wind and snow can damage the gazebo. If necessary please disassemble and store it for later use. 3.
PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE. Dear Customer, Thank you for shopping with us! When you receive the product, please make sure that all the parts are intact. Then please browse the entire installation manual before assembling. If any problem occurs unsatisfactorily as follows: A.The outer box is damaged B.The product is damaged / bent / cracked while you open the box C.The parts / accessories / assembly tools are missing D.The product is hard to assemble E.
EXPLODED VIEWS First Part Second Part Third Part Fourth Part Fifth Part 05
06 Y3 S Y3 P2 P1 R7 R6 P4 P5 S S P6 P6 S R3 S P6 P6 S S P5 P4 R6 R7 P1 P2 Y3 S Y3 FIRST PART
X1 07 K M1 K L1 P X3 M3 L3 L3 M4 X4 K1 D4 K1 X4 M4 L3 L3 M3 X3 P L1 K M1 K X1 SECOND PART
08 Q2 S S S S S S S Q1 S S Q9 Q9 S S Q9 Q9 S S Q9 Q9 S S Q9 Q9 S S Q6 Q5 R4 R4 S Q4 Q3 S S Q7 Q6 Q4 R5 Q1 Q4 Q1 S Q5 S Q2 R5 Q3 Q5 R4 R4 Q6 S Q6 Q3 Q4 S Q7 R5 S Q7 Q7 Q5 Q3 R5 Q2 Q1 S S S S S S S Q2 THIRD PART
09 Y3 M8 M7 Y3 G2 G2 L6 L6 G1 J1 L5 L5 M7 G1 M8 L6 L6 L5 D D1 D L5 J1 J1 M10 L8 L8 D3 D3 L8 L8 M10 J1 J1 L5 D D1 D L5 L6 L6 G1 M8 L5 L5 G1 M7 L6 J1 L6 G2 G2 Y3 M7 M8 Y3 FOURTH PART
10 C B Y5 A Y4 H2 T2 H1 E4 Y6 Y8 E5 T3 E3 T2 H1 C B Y6 Y8 A Y5 Y4 H2 T3 E7 T4 E6 Y8 Y6 Y6 Y8 E6 T3 T4 H2 C B E7 A Y5 Y4 H1 T2 E3 Y8 Y6 T3 Y6 Y8 E5 C B H1 E4 T2 A Y4 Y5 H2 FIFTH PART
Parts List (Box A) A R4 R5 R7 R6 Column Cover plate on big top diagonal beam Large top diagonal beam under cover Small top diagonal beam cover 1 4 PCS 4 PCS 4 PCS 2 PCS T2 T3 Short side mosquito net tube Long side mosquito net tube 4 PCS 4 PCS Small top diagonal beam cover 2 2 PCS Parts List (Box B) E4 E7 D3 E3 Big Top Frame Long Tube Short side beam 1 Short side beam 2 Long side center beam 2 PCS 2 PCS 2 PCS 2 PCS M8 T4 Big Top Downtube 2 Long side center mosquito net t
Parts List (Box C) D1 D E5 D4 E6 Connector for the upper part of the big top diagonal beam Large top frame short tube Small Top Connector Long side beam 1 Long side beam 2 4 PCS 2 PCS 1 PC 2 PCS 2 PCS H1 L3 L1 H2 Diagonal brace 1 Diagonal brace 2 Small top short side girder 4 PCS 4 PCS 2 PCS L6 M1 L8 L5 Small top long side beam Small beams on the upper edge of the big top 4 PCS 8 PCS M3 M4 Small beams on the lower edge of the big top Small beam in the center of the long s
Parts List (Box D) J1 C B G1 G2 Spike cover Floorboards Center crossbar Upper part of the big top diagonal beam 4 PCS 4 PCS 6 PCS 4 PCS K1 K S P Lower part of the big top diagonal beam 4 PCS Y4 Small top sloping beam Small top center beam Hook up Layer Connector under inclined beam 4 PCS 2 PCS 2 PCS 40 PCS 4 PCS Y5 Y6 Beam corner stopper Beam center stopper 4 PCS 6 PCS 13
Parts List (Box E) Q6 Q5 Large diagonal cover Large diagonal cover piece on the left side piece on the right of the big top side of the big top 4 PCS Q9 Q7 Big top short side center flap Big Top Long Side Center Cover Piece 4 PCS 8 PCS 4 PCS Parts List (Box F) P2 P1 P4 P6 P5 Small top short side left flap Small top short side right flap Small Top Long Side Flap 1 Small Top Long Side Flap 2 Small top long side center flap piece 2 PCS 2 PCS 2 PCS 2 PCS 4 PCS Q1 Q2 Small cover piece
Hardware List(Box F) AA CC BB Cross big flat he ad self-tapping M4*16 20 PCS EE Flat washer M6 Cross Outer Hexagon Bolt M6*35 Hexagon nut M6 Flat head hexagon socket head bolts M6*45 4 PCS 8 PCS 4 PCS 32 PCS GG FF DD HH KK JJ Cross Outer Hexagon Bolt M6*20 Cross Outer Hexagon Bolt M6*15 Mosquito net ring Cross Outer Hexagon Bolt M6*55 Cross Outer Hexagon Bolt M6*45 360 PCS 72 PCS 128 PCS 4 PCS 2 PCS QQ PP Z2 Z1 UU Round head nail Φ8*180 Cross Outer Hexagon Bolt M6*40 Ope
STEP 1 Step 1:Attach the column(A) to the floorboards(C) with screws(FF). Then slip the spike cover(B) into the column(A).
STEP 2 Step 2:Insert the beam inserts(Y8) into short side beam 1 (E3) and short side beam 2(E4) with the holes aligned and fasten with screws(FF). NOTE:Look at the picture to determine the location of the screw holes.
STEP 3 Step 3:Insert the beam insert (Y8) into the long side center beam (E7) and the two long side beams (E5 and E6), aligning the holes, noting the orientation, and tighten with screws (FF). NOTE:Look at the picture to determine the location of the screw holes.
STEP 4 T2 4x Step 4:Install the short side mosquito net tube(T2) on the short side beam(E3 and E4), slide the mosquito net ring(HH) into the slots of the mosquito net tube(T2) from the side, each mosquito net tube(T2) has 14 mosquito net rings(HH). Fix the beam center stopper(Y6) to the joint of the two short side beam(E3 and E4) and fix the center beam lower connector(Y2) to the short side beam(E3 and E4). NOTE:A side mosquito net tube(T2) with two slots and 7 mosquito net rings(HH) in each slot.
STEP 5 T3 4x Step 5:Install the long side mosquito net tube(T3) on the long side beam(E5 and E6) with screws(FF), Install the long side center mosquito net tube(T4) on the long side center beam(E7) with screws (FF),slide the mosquito net ring(HH) into the slots of the mosquito net tube(T3) from the side, each mosquito net tube(T3) has 18 mosquito net rings(HH).
STEP 6 Step 6:Use screws(EE) to connect and fix the connected short side beam(E3 and E4) and column(A), and then use screws(GG) to connect the diagonal brace(H1 and H2) with the short side beam(E3 and E4) and column(A).Use screws (FF) to connect the columns(A) and the connector under inclined beam(Y4) . NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 7 Step 7:Use screws(EE) to connect and fix the connected long side beam(E5 and E6) and column(A), and then use screws(GG) to connect the diagonal brace(H1 and H2) with the long side beam(E5 and E6) and column(A). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 8 Step 8:Fasten the beam corner stopper(Y5) to the corners of the side beam(E3,E4,E5 and E6) with screws(AA). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 9 Step 9:Connect the large top frame short tube(D1) and the big top frame long tube(D3) with the connector for the upper part of the big top diagonal beam(D) pieces and then lock them with screws(FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 10 Step 10:Connect the top frame(D1 and D3) to the base frame with center crossbar(J1), place the center crossbar (J1) on top of the center beam lower connector(Y2) and fix it with the screws(GG). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 11 Step 11:Insert the lower part of the big top diagonal beam (G2) into the upper part of the big top diagonal beam(G1) and secure with screws(GG). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 12 Step 12:Adjust the diagonal beam in the right direction, connect the top frame to the bottom section and secure with screws(CC and JJ). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 13 Step 13:Screw the small top sloping beam(K) and the small top connector(D4) to the top frame, and then install it with screws(GG). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 14 Step 14:Screw the small top center beam(K1) and the small top connector(D4) to the top frame, and then install it with screws(GG). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 15 Step 15:Attach the large top frame side mosquito net cover plate(X1,X3 and X4) in place between the big top and the small top with screws(FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 16 Step 16:Attach the small top side girder(L1 and L3) to the small top with screws(FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 17 Step 17:Attach the small top side down stop tube(M1,M3 and M4) to the small top with screws(FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 18 Step 18:Attach the small top cover piece(P1,P2,P4,P5 and P6) to the small top frame with the screws(FF) in the position shown in the illustration. NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
Step 19:Attach the layer(S) to the small top cover piece(P1, STEP 19 P2,P4,P5 and P6) with the screws(FF) in the position shown in the illustration. NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
Step 20:Attach the roof plate(R3) and hook up(P) to the STEP 20 small top connector(D4) with screws(KK), attach the small top diagonal beam cover(R6 and R7) to the four ridges of the small top with screws(QQ), then attach the inclined beam stopper(Y3) to the four edge corners of the small top with screws(FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 21 Step 21:Secure the small beams on the edge of the big top (L5,L6 and L8) to the large top frame with screws (FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 22 Step 22:Secure the big top downtube(M7,M8 and M10) to the large top frame with screws (FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 23 Step 23:Secure the left and right side large top cover tabs to the big top frame with screws(FF) in the locations shown in the mounting illustrations. NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
Step 24:Secure the front and rear side large top cover tabs STEP 24 to the big top frame with screws(FF) in the locations shown in the mounting illustrations. NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 25 Step 25:Attach the layer(S) to the large top cover piece with the screws(FF) in the position shown in the illustration, then attach the inclined beam stopper(Y3) to the four edge corners of the large top with screws(FF). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 26 Step 26:Secure the bottom half of the large top diagonal beam cover plate(R5) to the diagonal beam with screws (QQ), then insert the top half of the large top diagonal beam cover plate(R4) over the bottom half of the large top diagonal beam cover plate(R5) by aligning it with the holes in the small uprights,and then secured with screws(QQ). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
STEP 27 Step 27:Hang the mosquito net(U2) on the mosquito net ring(HH) on the inside of the mosquito net tube(T2,T3 and T4).Attach the four corners of the sticky tape to the post. NOTE:Mosquito net with 9 hanging loops on the long side and 7 loops on the short side.
STEP 28 Step 28:Hang the surrounding cloth(V2) on the mosquito net ring(HH) on the outside of the mosquito net tube(T2,T3 and T4).Attach the four corners of the sticky tape to the post. NOTE:Mosquito net with 9 hanging loops on the long side and 7 loops on the short side.
STEP 29 Step 29:Secure the post to the ground with ground nails (PP) and expansion screws(UU). NOTE:Review the pictures to determine the location of the screw holes and the orientation of the parts.
www.alaulm.