Introduction to Store Install Processes Guide G-1-2001-2A 5/27/2008
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2A.doc Table of Contents CHAPTER 1 - INTRODUCTION:.............................................................................. 1-1 Reminder:......................................................................................................................... 1-1 Store Safety: ....................................................................................................................
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2A.doc Revision Record Document Title: Introduction to Store Install Processes Guide Revision # Revision 2 4/28/2008 Page No.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Chapter 1 - Introduction: This guide establishes Goliath Solutions Standard Operations Procedures (SOP) for the installation of new sites using the GOLIATH System. The sites will be installed by a contracted Cable Installation Vendor (CIV). The target audience for this manual is the CIV and the Goliath Solutions Help Desk (Help Desk).
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Store Safety: During the installation process safety for store employees, customers and the installation team must be your top priority. The installation is taking place in a live store environment. Be aware of potential safety hazards and how to minimize them. Primary areas of safety concerns are Ladder Safety, Aerial Lift Safety and Work Area Safety.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Keep the area around the top and bottom of ladder clear. Use only non-conductive side rails around live electrical equipment. Do not use the top step for standing/stepping. Do not stand on cross bracing. Always face the ladder when ascending or descending.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc The employer should provide employees: Required manuals to operators and maintenance mechanics. Be sure operators and mechanics are trained by a qualified person experienced with the model of aerial lift.* Using an Aerial Lift Always close lift platform chains or doors. Stand on the floor of the bucket or lift platform. Do not climb on or lean over guardrails.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Training OSHA says a qualified person must train all users. The training must include: Any electrical, fall, and falling-object hazards. Procedures for dealing with hazards. How to operate the lift correctly (including maximum intended load and load capacity). The user must show he/she knows how to use the lift. Manufacturer requirements.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Ramset Safety: When installing a store with a concrete ceiling a Powder Actuated Ramset or an equivalent tool will be needed to install J hooks into the concrete ceiling. If a Ramset or equivalent tool is used during the installation, the following safety procedures are required: The installer must be licensed to use the product. Licensing takes about 20 minutes online at the web site www.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Chapter 2 - Installation Roles and Responsibilities: Goliath Solutions Help Desk: The Goliath Solutions Help Desk (Help Desk) is the primary GOLIATH contact point for the CIT during the installation process. The Help Desk is open from 6AM - midnight CT (or upon final Crew check-out), M-F to provide remote support.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Installation of the GOLIATH equipment according to the standards specified in this manual while following Best Cabling Practices as specified by the Cable Installation Industry. Installation of the GOLIATH Test Tags (4). Testing of the equipment with the Help Desk. Notifying the Help Desk immediately of any problems on-site during the installation process.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Chapter 3 - Standard Goliath Equipment Terms in the Installation Process: CMU (Communications Management Unit): The CMU handles the network connectivity for the GOLIATH system. This device has an RJ-45 port that connects to the store’s network communications infrastructure.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Main Electrical Unit (MEU): The MEU is the brain or the local hub of the local GOLIATH system. It collects all system data within the retail outlet. The MEU is normally mounted on a post near the center of the store. Depending upon the size of the store and the Retailer’s requirements one or more MEU’s may be required. An MEU will support up to 4 Transmitters and 16 Receivers.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Transmitters (Tx/ATA): These antennae amplify and “broadcast” the radio waves MEU I that will ultimately be reflected back to the receive antennae from the RFID tags. The number of transmitters will vary depending on the size of the store.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc CMU/MEU Power Supply: The power supply will be plugged into an uninterrupted power source and provide power for the CMU or MEU. CMU/MEU Power Cables: Three different power cables can be used with the CMU and MEU. The are: 1) A 110 foot low voltage power cable. This cable is used to extend the distance from the MEU or the CMU to the power source.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Chapter 4 - Store Installation Procedures: Overview of the Installation Process: The store installation process involves the installation of the transmitters (Tx/ATA), receivers (Rx/ARA), coaxial cables and the MEU into the ceiling of a Retail Store. The process will also include the installation of the CMU at the communications LAN cabinet in the store if MEU III is being installed.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Check-In: The Store Check-In process involves the following tasks: Introduce yourself and your installation team to the highest available level of Store Management. Give an overview of the installation process. Locate the Installation Kit shipped to the store. Call the Help Desk to check-in. Pre-installation Survey: The Pre-installation Survey Process has two purposes.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Installation: Installation Prep: Unpack the Installation Kit and review its contents: Verify you have received the correct equipment for the installation. Once contents have been verified, begin labeling the cables for installation. Record serial numbers for MEU and CMU. CMU Installation: This step will only be performed if the site is using a CMU and a MEU III.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Tx/ATA Installation: The antenna locations will be verified during the Pre-installation Survey performed by the Lead Technician. The location of the Tx/ATA should be placed directly over the flooring with a clean line of sight to the floor, not over any fixtures or tables. A minimum of 4 transmitters will be installed in the store.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Rx/ARA Installation: The antenna locations will be verified during the Pre-installation Survey performed by the Lead Technician. The location of the Rx/ARA should be placed directly over the flooring, not over any fixtures or tables. The number of receivers is determined by the store’s requirements; normally a minimum of 14 receivers will be installed in the store.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc MEU Permanent Location: An MEU I will be installed initially at its permanent location. An MEU III can be moved to its permanent location after the Help Desk has tested it with the CMU. The MEU will normally be mounted on a post near the center of the store or suspended from a roof girder. The MEU is attached to the post using one or more 36 inch cable ties.
Introduction to Store Install Processes Guide G-1-2001-2 Introduction to Store Install Process Guide-2.doc Installation Completion: After the completion of the installation of the GOLIATH hardware in the store the following tasks still must be completed: Verify that all cables are securely connected to the MEU at their corresponding ports. After all the antennas are connected to the MEU, connect the power to the MEU and verify that the Green power indicator is on.