Installation Guide

RN2480 Band 14 Regulatory Information
GDB-3561 Iss-0.2
Page 1 of 1
General Dynamics Broadband
FCC Regulatory Information
This device complies with Part 15 of the FCC Rules. Operation is subject to the following two
conditions: (1) this device may not cause harmful interference, and (2) this device must
accept any interference received, including interference that may cause undesired operation.
No changes shall be made to the equipment without the manufacturer’s permission as this
may void the user’s authority to operate the equipment.
The FCC Grant of Certification can be found using the FCC ID Search feature and entering
the FCC ID marked on the eNodeB. http://transition.fcc.gov/oet/ea/fccid/
RF Exposure
Antenna installations for the General Dynamics Broadband RN2480 LTE eNode B shall be
performed in accordance with the manufacturer’s recommendations and all national laws
and regulations. To ensure correct antenna installation, the installer shall evaluate
compliance with applicable national laws and regulations regarding exposure to
electromagnetic fields and define the required exclusion zones for RF workers and the
General Public.
Any changes to the antenna installation or radio transmission equipment require a re-
evaluation of the exposures to electromagnetic fields.
Pursuant to 47 CFR Part 1, Subpart 1, subject to the provisions of section 1.1307, all
installations must be evaluated for requirements contained in Table 1, “Limits for maximum
permissible exposure,” in section 1.1310.
Band 14
The Band 14 eNode B has been assessed for compliance with FCC requirements for
antennas with gains upto 18dBi, the minimum exclusion distance required to meet the Un-
Controlled/General Public limit of 0.505mW/cm
2
is 11.2m.

Summary of content (1 pages)