User's Manual

Fleetwood Group Inc. FCC ID: FBRIQK1000-9SS Page 1 of 3
File Name: IQK1000_Manual User Manual Date: 4/22/2003
Reply IQ User Manual
System Setup
1. Unpack the Reply IQB500 base unit and set it on a table or available surface in the
vicinity of where the Reply IQK1000 Response Keypads will be used.
2. Plug the AC power module into the Reply IQ base DC input jack.
3. Plug the AC line cord from the power module into a 115 VAC power circuit.
4. Turn on the power switch of the Reply IQ base unit.
5. Plug either the RJ45 supplied cable into a network port, if Ethernet connection
selected (or directly to a PC via a crossover cable), or a standard DB9 to DB9 RS232
cable into a COM port (usually Com1 or Com2) if serial connection selected.
6. Open the carrying case containing the response keypads and distribute them to the
participants.
7. Turn on the computer and start the application software to control the base unit to
poll for keypad responses. Each application software will have its own instructions for
using the system.
Operation
1. Instruct the participants on the usage of the response keypads and procedure for
responding.
2. Ask a question and allow enough time (at least 10 seconds) for all participants to
respond.
3. Observe the results on the screen and optionally save the results for later analysis if
desired.
4. Proceed and repeat the process for the next question.
5. Continue until all questions are completed.
6. Analyze the responses for the period and run printouts if desired.
System Shutdown
1. Turn off the power to the computer.
2. Turn off the power to the Reply IQ base unit.
3. Unplug the data cable from the computer and store it in its carrying case.
4. Unplug the AC line cord from the power module and store both in the carrying case.
5. Store the Reply IQ in its carrying case.
6. Collect the keypads and return them to their carrying case.
7. The system is now ready for transporting.

Summary of content (3 pages)