Mount the Terra graph radios on a pole according fo the site plan as follows: 1. Sore the mounting bracket to the Stenography main housing with 3 screws. 2. Mount the Terra graph radio on to the opal.
3. Thread the stainless steal band clamp through the mounting bracket. The provided band clamps support a pine diameter of 4.5m Inches) and the mounting bracket requires one band clamp 4.
Installing the Fiber 1. Connect the fiber cable to the transceiver. 2. Insert the transceiver info the TIERS port of the Telegrapher radio. Installing the Ethernet [POE Output] 1. Connect the Theme cable to ane of the four Ethernet POE out ports. Please note that by default these Boris are enabled for 802 3at/sf POE output if passive 24v POE is 10 be used this setting must be sat via the NMS configuration. .
Installing the Ethernet [POE Input] 1. Connect the Ethernet cable to the POE Output port on the POE injector and connect the far and of this cables nits the Granter radio Ethernet POE input port. H POE injector is not waterproof! please ensure it located in an indoor environment or alternate 2. Conn est the power cable to the power port of the POE injector and validate tha the power LED on the Telegrapher radio illuminates green. 3.
Installing the DC Power Input Install and secure the power sunny according 10 the site plan and the local electrical odes. The following table shows the maximum cable lengths they are supported between the DU power supply and the Terra graph radio. 1.63mm J 14AWG 40m (131F7} 1.29mm / 16AWG 25m (82FT) 102mm 18BAWG 15m (49FT) 1. Ship each wire in the power cable by {0mm (3/8 Inch) and insert the wires into the. terminal block according to the polarity shown in the figure above, 2.
Physical Acceptance Criteria Terra graph DN/CN Checklist Validate Physical Installation 1. Condition that the Terra graph radios have been installed according to work order, permits, and aut sheet 2. Confirm that all bolts and washers have been installed and are securely tightened. 3. Confirm that the proper cable management practitioners have been followed, including the uae of drip loops, strain sale, proper bend radius, and cables are secured. 4.