Ln Sheba Seminal vem ag When you place the basket, please tided way, 10d better to place 5 3 ane side first, then press the other side, 4 The graph shows the finished condition, and to ensure that the bashes are well installed, | please press the siege of baskets to make sure that the edges are attached to the plastics dread point (HL 0 Admiralty 5, $03.