Installation Guide

Installation Guide
Heavy Duty System Tips
HOMEDEPOT.com
Please contact 1-800-305-1726 for further assistance.
Install Hang Tracks
2
Choose Your Hardware
Heavy Duty System Components
1
A. Heavy Duty Hang Track
B. Heavy Duty Vertical Rail
C. Heavy Duty Shelf Bracket
D. Heavy Duty Closet Rod
E. Heavy Duty Closet Rod Support Bracket
F. Heavy Duty Closet Rod Endcap
G. Heavy Duty Shelving
Secure to the wall with #12x2 in.
panhead screws at stud locations.
Drill 1/4 in. holes, insert 1/4 in. wall
anchors and secure to the wall with
#12x2 in. panhead screws.
STUDS
CONCRETE
DRYWALL
A
B
E
F
D
G
C
Drill a 1/2 in. hole in the drywall. If
you hit a stud during drilling, use
above stud hardware/instructions
for each stud location.
Insert bolt through hang track (or
vertical rail/vertical rail joiner) then
screw on 3/16 in. toggle.
Install 3/16 in. toggles in each hole of
the component you are attaching
before attaching to the wall.
Compress and pass the 3/16 in.
toggles through the hole you drilled.
Allow the 3/16 in. toggle to spring
apart behind the drywall.
Screw the 3 in. bolt until tight to
secure. Pull back on screw head
for tension if 3/16 in. toggle is
spinning behind wall. Install 3/16
in. toggles in each hole of
components before attaching to
wall.
Determine your desired hang track conguration per your planned layout.
Measure 84 in. from the oor and level the hang track. Use a pencil to mark each screw hole, marking at least every 16 in.
apart (or closer) along hang track on the wall.

Summary of content (2 pages)