2 3 4 5 6 7 ECL2248-2723 Installation Manual Corporate Headquarters EUCAST Co., Ltd.
8 9 10 Revision History 11 Version Date Author/Editor Comment 1.0 2020-10-19 H/W Initial draft version 2.0 2020-12-09 H/W revision 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 = CONFIDENTIAL = - ii - EUCAST Co. Ltd.
28 INDEX 29 30 1 Introduction ...............................................................................................................vii 31 1.1 System SPEC. ......................................................................................................................................................... vii 32 1.1.1 ECL2248-2723 Exterior .................................................................................................................................. vii 33 1.1.
55 56 Figure index 57 Figure 1. ECL2248-2723 Exterior ................................................................................................................................. vii 58 Figure 2. Interface Ports ............................................................................................................................................... viii 59 Figure 3. ECL2248-2723 Installation sample. ...........................................................................................
75 Preface 76 77 Purpose of the Manual 78 79 This document provides basic installation guide for ECL2248-2723 system, a base station in LTE 80 system. 81 82 Amendments 83 84 The installation manual is being updated continuously in order to effectively reflect the actual 85 system. However, there may be some minor differences due to the continued upgrades and 86 modifications to the system. Please contact us to clarify any confusion arising from such 87 differences.
105 Caution and Other Marks 106 This Equipment complies with part 15.19 (a)(3) of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. 107 The intentional or unintentional radiator of this equipment shall not be changed or modified without the approval of EUCAST.
119 1 Introduction 120 1.1 System SPEC. 121 1.1.1 ECL2248-2723 Exterior 122 123 124 Figure 1. ECL2248-2723 Exterior 1.1.2 Electricity consumption. 125 ECL2248-2723 uses +12V DC Voltage. 126 The + 12V voltage supplied to the ECL2248-2723 is generated by an AC / DC adapter. 127 The AC/DC adapter output power is + 12V / 5A. 128 ITEM Specification Input Power Voltage +12 VDC (Using AC/DC Adaptor) Maximum Power Consumption Typ. 40 Watts 129 Table 1.
131 132 1.1.3 Size and Weight ITEM Specification Size (mm) 188 x 272 x 55 Weight (Kg) 2.1Kg , Only Main Chassis 133 Table 2. Size and Weight 134 135 1.1.4 Environmental condition 136 Section Range Operating Temperature 0 ~ 40°C Storage Temperature -30 ~ 70°C 137 Standard Indoor Table 3. Environmental Requirements 138 139 1.1.5 Physical Interface 140 1.1.5.1 Interface Overview 141 142 Figure 2. Interface Ports 143 144 = CONFIDENTIAL = - viii - EUCAST Co. Ltd.
145 1) RF Antenna : Inside the enclosure, ANT1/ANT2 146 2) Backhaul Port(RJ45) : It is used for connection with B / H and supports Ethernet (100/1000 Base-T) 147 3) Daisy-chain Port(RJ45) : It is used for connection with B / H another base station and 148 supports Ethernet (100/1000 Base-T) 149 4) LMT Port(RJ45) : It is used for operation management in field and supports Ethernet (10 / 150 100Base-T) 151 5) GPS ANT(SMA Female) : It connects to GPS antenna.
163 2 Start installation 164 2.1 Installation and Workspace 188mm 55mm 272mm 165 166 Figure 3. ECL2248-2723 Installation sample. 167 The ECL2248-2723 is Wall Mount Type as shown in Figure 3. It is not a desk type. Considering 168 the size and workspace of the ECL2248-2723, the minimum space to be secured is as follows. 169 When mounting the ECL2248-2723 on a wall, make sure that there is enough space between the 170 ceiling and floor.
174 2.
194 3 System installation 195 3.1 ECL2248-2723 components 196 197 198 (a) ECL2248-2723 Main System (b) AC/DC Adaptor 199 200 (c) Brackets(ECL2248-2723 side/Wall side) 201 Figure 4. Compositions of ECL2248-2723 Mechanical 202 203 3.2 ECL2248-2723 installation 204 Bracket that can be installed in Wall are provided. 205 The procedure for installing the ECL2248-2723 is as follows (Wall mount) : = CONFIDENTIAL = - xii - EUCAST Co. Ltd.
206 3.2.1 Install order ECL2248-2723 in Wall 207 3.2.1.1 Bracket drawing and material preparation 208 The following figure shows the mounting bracket for mounting the ECL2248-2723 on the wall. 90mm 35mm 66mm 209 80mm 28mm 210 Figure 5. Bracket Mechanical drawings 211 212 3.2.1.2 Fix the Bracket to the ground Wall Wall ❶ ❷ 213 ❸ ❹ Wall Wall ❸ ❹ 214 = CONFIDENTIAL = - xiii - EUCAST Co. Ltd.
215 216 Figure 6. Wall Side Bracket 3.2.1.3 Fix the Bracket to the ECL2248-2723 217 218 Figure 7. ECL2248-2723 Side Bracket 219 220 3.2.1.4 Assembling the ECL2248-2723 221 Wall Wall Wall 222 Figure 8. Assembly sequence 223 224 = CONFIDENTIAL = - xiv - EUCAST Co. Ltd.
225 226 227 This page intentionally left blank = CONFIDENTIAL = - xv - EUCAST Co. Ltd.