Shower Door Installation Instructions BY | Please Do Not Return the Product to the Store. | | Contact us with any questions.
SHOWER DOOR Model Specific Preparation A REQUIRED: £20.07 1/4” (6mm ) Out-of-Plumb Adjustment within the Wall Profile; Verify threshold and walls with a level.
SHOWER DOOR PACKAGE CONTENT CTE PACKAGE CONTENT PART# DESCRIPTION QTY PART# DESCRIPTION QTY A Bottom guide 1 G Anti-Jump Assembly 2 B Bottom Rail 1 H Outside Roller 2 C Outside Door panel 1 Wall Bracket Assembly 2 D F shape seal 4 J Upper Guide Rail 1 E Wall Jamb 2 K Inside Roller 2 F Handle 2 L Inside Door panel 1 -l Inspect all parts for missing prior to installation! Contact us for any part missing.
SHOWER DOOR PACKAGE CONTENT 20 rg i Screw Wall anchor Wall anchor Screw cover ~~ ST4*30 @6x38mm | @8x38mm 3ps | Apes | Apes | apes | poss .NOTE _ [ Inspect all parts for missing prior to installation! Ny Contact us for any part missing.
TOOLS REQUIRED Drill Bits h Screw Driver | ( Drill hp Level h i 21/4"& B5/16” (6&8mm) dia.
SAFETY INFORMATION CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product. To minimize these risks, please note: » Always wear safety glasses and gloves while handling. » Always follow the installation instructions. * Inspect glass for damage before installation.
Measure the finished opening width. — 1.Measure the finished opening width at the bottom and at the model height. NOTE Use these dimensions as “W1” (top) and in step #2. 2.Also check the threshold for level and the walls for 1) This model will only accommodate up to for out-of-plump condition.
Cut the Upper Guide Rail (J) and the Bottom Rail (B) to fit your finished opening using either a miter saw or a hacksaw Cut the Upper Guide Rail (J) to: “W1” (top) dimension 13/32" A a Upper Guide Rail Cut the Bottom Rail (B) to: dimension 1/16" Use a metal file to remove any burrs from the cut ends.
Wall Jamb & Wall Bracket Installation 7 1.Measure in 19/32" from the outside of the Wall jamb(E) as Fig.a; I 2.Position the Wall Jamb(E) on the note one end TN with 2 holes faces up.Mark the location of the holes as Fig.b; ‘NOTE 3.Drill the holes as Fig.c and Fig.d; \ ’ 4.Apply silicone into the groove along the entire length of the Wall Jamb(E) as Fig e; 5.Attach the Wall Jamb(E) to the wall and attach the Bracket(l) to the Wall \_ Jamb(E) as Fig Fig.a 5 neo l Fig.
Upper Guide Rail & Inside Roller Installation 1. Insert the Inside Roller (K) into Upper Guide Rail (J). J Put Inside Glass Panel ( L ) inside the whose NOTE place before install the Upper Guide Rail(J), and the green label faces outside. La see Label Check the Upper Guide Rail for level.
Lira SHOWER DOOR Bottom guide & Bottom Rail Installation | Measure across the width of the threshold to locate and mark the center. NOTE Drill a hole and insert the Wall Anchors (cc) and use the ST4.0 X “| 30mm Pan Head Screws (bb). 1 Insert Ato B 2 Measuring Use Painter’s Tape to hold the Water seal = . Slide the Bottom Guide(A) to the 6 Bottom Rail(B). 2. Position the Bottom Guide(A) to the middle of shower door. S 3. Put the Bottom Rail(B) next to the outside of two Wall jambs(E). 4. Mark the holes. 5.
Lira SHOWER DOOR Inside Door panel Installation DO NOT install the towel bars on the glass until instructed. DO NOT lift the glass using the towel bars. This could result in damage to the glass and/or serious personal injury. Always use an assistant or a professional grade glass suction cup when handling heavy glass. The green label faces outside. bm 1.Insert the Inside Door Panel(L) into the Bottom Guide(A) as Fig 1. 2.
Outside Door panel & Outside Roller Installation DO NOT install the towel bars on the glass until instructed. DO NOT lift the glass using the towel bars. This could result in damage to the glass and/or serious personal injury. Always use an assistant or a professional grade glass suction cup when handling heavy glass. Remove the cap and screw from the Rollers (H) and attach the Rollers (H) to the Outside Door Panel(C). The green label faces outside.
Door panel(outside) & Roller(outside) Installation The green label faces outside. \ O [ pegs rollers up or down NOTE) = door aligns with wall.
[rO SHOWER DOOR Anti-jump assembly Installation Attach the Anti-jump Assembly (G) to the Outside Door Glass (C) to NOTE Guide Rail (J). prevent the door glass from being lifted off of the Upper Guide Rail (J).
Handle Installation Attach the Handle (F) to the Inside | Door Panel (L) and to the Outside No Tee Door Panel (C). Be sure to use all of Sa ~~ the supplied rubber gaskets to protect J the glass.
Attach the F shape seal to Door panel NOTE . 2 pieces on the each door.
Check the door panel switch Unscrew the screws and adjust the wall jamb inside and out . bore Ensure that the door panel goes ' inside the Wall Jamb.
SEALING 7 NOTE, The surfaces need to be clean and free of debris before applying silicone. ST Ensure that the Shower door closes tightly and opens smoothly. NOTE Apply a good quality silicone sealant along the wall Jamb(C) and ) : Bottom Rail (A) . A Allow 24 hours for the silicone to cure before using the shower. Apply Silicone Sealant, (not supplied). Apply silicone around the bottom rail. Use Painter’s Tape to hold the Water seal tight in position while the silicone cures.