User's Manual
94-00029-01
enlighted Inc.
930 Benecia Ave.
Sunnyvale, CA 94085
www.enlightedinc.com
Phone: 650 964-1094
Fax: 408 730-5754
Support: 855 874-1691
support@enlightedinc.com
Installation Instructions for:
Model: SU-2-00
Installation Materials Supplied
SU-2 Sensor Unit
Anchor Screw
Caution
Disconnect all power before installation or service.
All installations and maintenance work must be performed by
qualified personnel.
The SU-2 must be installed in accordance with state, local and
national electrical codes and requirements.
Installation Instructions for SU-2-00
1. Turn off all power to the light fixture by switching off the circuit
breaker.
2. The RJ11 data cable should already be installed and connected to
the CU-2 mounted in the ballast cavity of the fixture or mounted in a
UL approved enclosure.
3. The SU-2 Sensor should be mounted to the ceiling within a few feet
of the lighting fixture and over the service area of the light.
4. Select a place for the RJ11 data cable to exit the plenum and make a
small cut in the ceiling tile for the cable to exit.
5. Install the SU-2 anchor screw (as shown).
6. Connect the RJ11 data cable to the Sensor (bottom entry).
7. Slide the SU-2 onto the screw head as shown.
8. Slip the excess RJ11 data cable up into the plenum area and adjust the ceiling tile to the original position.