Waverly Screen Kit 36" W x 44" H 45 min Approximate assembly time for 2 screens Scan the QR code for an assembly video ASSEMBLY INSTRUCTIONS www.encloscreens.com EC18010 (WHITE COLOR) EC18011 (CEDAR COLOR) VER.
EC18010 / EC18011 GENERAL INFORMATION ASSEMBLY INSTRUCTIONS IMPORTANT j Check the inside of the larger pieces in your box for other materials packed inside. j When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching. j We recommend an area approximately 5’x 8’ for unobstructed assembling. j You should not need to use excessive force when assembling components.
ASSEMBLY INSTRUCTIONS EC18010 / EC18011 Detailed Product Dimensions & Specifications 36 in 10 in 7/8 in 1/4 in 44 in 1 1/4 in 33 in www.encloscreens.
EC18010 / EC18011 ASSEMBLY INSTRUCTIONS STEP 1: LAY OUT TOOLS Tools required for a smoother installation experience. Drill Mallet* Woold Block* *- May be needed depending on soil condition OPTIONAL 13/4" Tulip Auger* Level *- May be needed depending on soil condition 4 www.encloscreens.
ASSEMBLY INSTRUCTIONS EC18010 / EC18011 STEP 2: LAY OUT MATERIALS A B C Ground Stake (4) 3/4" x 1 1/4" x 14" Slat (22) .4" x 2.875" x 357/8" Rail (4) 7/8" x 11/2" x 357/8" D E F Joiner Clip (2) 1/13" x 3/4" x 1 3/4" G Left Post (2) 1 1/2" x 1 1/2" x 44" www.encloscreens.
EC18010 / EC18011 ASSEMBLY INSTRUCTIONS STEP 3: ASSEMBLE THE PANEL STEP 3.1 STEP 3.2 1. Slide (2) Rails (C) into the routed holes in the Left Post (D). 2. Slide (11) Slats (B) into the angled slots in the left post. 1. Tip: Brace the left post against a wall or raised flat surface to allow for easier installation in future steps. 1 1. Slide (1) Right Post (E) over the opposite ends of the slats and rails.
ASSEMBLY INSTRUCTIONS EC18010 / EC18011 STEP 4: INSTALL THE GROUND STAKES STEP 4.1 1. Slide (2) Ground Stakes (A) up into the bottom of the posts until the pre-drilled holes in the stakes and posts align. 2. Drive (4) total 3/4" self-drilling stainless steel screw into the pre-drilled holes. 1 A 2 Align Align STEP 5: ASSEMBLE THE SECOND SCREEN PANEL STEP 5.1 Repeat Steps 2-3 in order to assemble the second screen. www.encloscreens.
EC18010 / EC18011 ASSEMBLY INSTRUCTIONS STEP 6: INSTALL PANELS IN THE GROUND STEP 6.1 1. Move the screen to its final location, and identify the location of the posts. 2. Attempt to push the unit into the ground. All 10" of the ground stakes should go in the ground. 3. Ensure the unit is properly leveled. 1. Note: If you face resistance refer to the instructions in the next step. Excessive force can damage the top of the posts. STEP 6.2 1.
ASSEMBLY INSTRUCTIONS EC18010 / EC18011 STEP 6.3 Optional in hard ground: If your ground is too hard, or you have more than 3 or 4 panels to install, please consider these options: 1. Use a 1¾” diameter auger bit (commonly used for planting tulips) as illustrated ($15-$20 on Amazon.com). 2. Drill a hole about 12” to 16” deep at the desired location, and fill the holes with water as illustrated. 3. Push the panel posts into the holes. 1 2 www.encloscreens.
EC18010 / EC18011 ASSEMBLY INSTRUCTIONS STEP 7: CONNECT THE SCREENS STEP 7.1 1. Straight Line Application: Connect the screens as shown below using Joiner Clips (F) and 3/4" self-drilling stainless steel screws. 2. Corner Application: Connect the screens as shown below using Joiner Clips (F) and 3/4" self-drilling stainless steel screws. 1. Note: There are no pre-drilled holes for the joiner clips to allow for greater customization during assembly. 1 F F 2 F F 10 www.encloscreens.
www.encloscreens.com support@encloscreens.com 704-892-5222 877-234-6196 6935 Reames Rd. Ste. K. Charlotte, NC 28216 ASSEMBLY INSTRUCTIONS EC18010 (WHITE COLOR) EC18011 (CEDAR COLOR) VER.