Maintenance Instructions
15
Handheld Controller, Gateway and Docking Station
Docking Station
• Using the Docking Station template located at
www.elkhartbrass.com, drill 6 #7(0.201” 5.1mm) drill
holes as shown through the panel.
• Mount the Docking Station with six (6) 10-24 screws
using blue Loctite 242 or equivalent. The controller has
a 0.375 thread depth. Torque screws to 50-60 in-lbs (5.6-
6.8 Nm).
• Supply power to the Docking Station by connecting the
plug leads shown to an appropriate unswitched power
source.
• Install a 1 Amp fuse into the positive (red +) power lead
of the Docking Station for a 12V system (1/2 Amp for
24V system).
• Place the Handheld Controller into the station. To
remove, push the docking station latch down. (see
maintenance instructions section B for LED signals)
Gateway
• Using the Gateway template located at
www.elkhartbrass.com, drill all 0.291”(7.mm) holes as
shown through the panel.
• Mount the Gateway with 10-24 screws using blue Loctite
242 or equivalent. Torque screws to 50-60 in-lbs (5.6-6.8
Nm).
• Supply power to the controller by connecting red (+) and
black (-) leads to an appropriate power source.
• Install a 1 Amp fuse into the positive (red +) power
lead of the Gateway for a 12V system (1/2 Amp for 24V
system).
• Termination requires CAN splitter (P/N 24196000) and
CAN termination plug (P/N 24197000) not included.
Non-termination requires CAN splitter (P/N 24196000)
not included.
Gateway