Installation Guide

Assembly Instructions for BF10
Cold Valve Body
Hot Valve Body
O-ring
Rubber Washer
Metal Washer
Mounting Nut
Cone Washer
Friction Ring
Supply Line Nut
FAUCET INSTALLATION:
1.Shut off the water supply valves before installation.
2.Unscrew the mounting nut, and remove the metal washer and
rubber washer from the hot valve body. From the top, install the
hot valve body into the left faucet hole. From underneath, place
the rubber washer, metal washer, and thread the mounting nut
onto the threaded shank and tighten tight.
3.Repeat step 1 for the cold valve body.
4.Connect the supply lines (not included) to the threaded shanks.
5.After installation in completed, turn on the water supply valves
and allow both hot and cold water to run at least one minute
each. While water is running, check for leaks, especially at
hook-ups to supply lines. Tightening nuts slightly will stop any
minor leaks.
NOTE: WRAP AT LEAST 3 LAYERS OF TEFLON TAPE ON ALL THREADED CONNECTIONS
Cross Handles:
1.Put the cross handles on the broaches and
then tighten the screws.
2.Insert the caps on the cross handles.
Caps
Screw
Cross Handle
Broach
Rev.E
Elizabethan
Classics
R
CAUTION: DO NOT OVER TIGHTEN NUTS - THIS CAN LEAD TO STRIPPING OR
CRACKING AND WILL VOID YOUR WARRANTY.
AND SCREWS
NOTE: TO BE INSTALLED ONLY BY QUALIFIED, LICENSED PLUMBER

Summary of content (1 pages)