Installation Guide

(QGXUD
&UDIW
®
Craftsman Series Column
Installation of Tapered Columns
2) Trim shaft pieces to 2¼" shorter
than opening2" for cap/base, ¼"
for expansion (¼" if not using cap
and baseeach part is 1" thick.)
Always trim from bottom ONLY-
top is marked.
1) Measure overall opening from
floor to beam or soffit (must have
structural pressure-treated post or
lally column for load support.)
5) Lay 3 panels flat and apply
adhesive to center joints. (Poly-
urethane glue is recommended. Fol-
low manufacturer's instructions.)
6) Assemble three panels, using
E-Z Lock joints.
4) Glue base platform pieces using
biscuits (supplied). Center and attach
base to floor/pedestal with appropri-
ate fasteners.
7) Finish nail three panels together.
3) Slide ¾ cut base platform
section around post.
8) Slide assembled 3-sided column
around support (on top of base plat-
form).
9) Slide ¾ cap platform section into
place on top of column
panels.*
Warning: the precision machined edges of (QGXUD&UDIWCraftsman column components can be extremely sharp. Use of appro-
priate personal protection equipment is required: wear gloves when handling the product, wear a dust mask when cutting the
product, and always wear eye protection.
Use of polyurethane adhesive, such as Gorilla Glue
®
, Loctite
®
PL Premium
®
Adhesive, Christy’s™ Clear PVC Pipe Cement (or
other clear PVC cement), or similar products is recommended. Always observe adhesive manufacturer’s instructions.
Assembly is easiest with pneumatic or electric pin-nailers. These should recess the head of the pin nails far enough that only a
minor touch-up is necessary (touch-up with caulk prior to painting.)

Summary of content (7 pages)