Use and Care Manual

Installation Guide for U-type Climbing Frame Trellis
Package Contents
White U-shaped tube
Green crossbars
A pair of labor protection gloves
Preparation
Choose a well-lit area where plants can receive ample sunlight.
Prepare the soil by loosening it to a depth of 12-15 inches, removing
any debris or stones.
Assembly Instructions
1. Wearing Safety Gear:
Put on the labor protection gloves to ensure safety during the
installation process.
2. Crossbar Attachment:
Identify the pre-drilled holes on the U-shaped tube.
Slide each green crossbar into the corresponding holes on the
tube, starting from the bottom and working up to the top,
ensuring they are secure and level.
Installation Steps
1. Trellis Positioning:
Hold the U-shaped tube with crossbars attached and position it
in the desired location in your garden.

Summary of content (2 pages)