Installation Guide

Installation guide
TLJ RezLok v3.1 - handle set
TLJ Group Ltd, HQ 68/78 Leads Road,
Hull, East Yorkshire, HU7 0BY, UK
Front
Handle
Cable Connection
Screw Location
IMPORTANT
Ensure holes drilled,
machined in the door
match TLJ fitting
template exactly.
Any difference will
void fire test certification
Back
Handle
3pcs M6 backplate
Fixing Screws - Type A
3pcs M6 backplate
Fixing screws - Type B
2pcs Lever Spindles
2 different lengths to suit
varying door thicknesses
Declaration of Performance can be found
at www.TLJlimited.com
4 x AA Batteries
NOT INCLUDED
Spindle
M6 Screw
M5 Screw
Battery
Compartment
Backplate
IMPORTANT
Set the Handing direction
before installing the RezLok
on the door. Ensure the
arrow located on the
backside of the Front handle
is pointing to L for Left &
R for Right handed doors.
293,40
104,00
159,70
40,40
3pcs M6 backplate
Fixing screws - Type C
3 sets of fixing screws in varying lengths
to suit different door thicknesses
2pcs M5 Back handle
fixing screws
Please Note - for external installations ensure to
use Lithium batteries, avoid Alkaline.
M5 Screw
Battery tray
grub screw
L
R
LEFT RIGHT

Summary of content (3 pages)