Installation Manual Montageanleitung Instructions de montage Istruzioni per il montaggio
Product Data 193/4" (500) 23/8" (60) 43/4" (120) Product Specifications Geberit Model No. 111.335.00.5 Concealed tank and bowl carrier, wall-hung two-hole toilet bowl and actuator plate. Tank and carrier system shall fit within a minimum 6 3/4" (170) deep wall with studs placed 19 3/4" (500) apart, water supply shall be 1/2" copper, minimum water pressure 35 PSI. The bowl shall be an IAMPO listed 1.6 gallon (6 l) per flush wall-hung bowl.
2 Installation Installation Requirements To install tank and carrier, a 2 x 6" wood frame or metal frame construction is required. Studs must be placed 19 3/ 4" apart (clearance) where carrier will be positioned inside the wall. Bowl Finished Rim Height (FRH) Remove carrier and installation hardware from its box. Determine FRH for wall-hung bowl and adjust carrier height in accordance with requirement. Dimensions can be taken from bowl or carrier specification sheet.
Tank and carrier installation 1 Locate carrier supporting studs and reinforce with additional nails. Ensure rough-in for the carrier is plumb and square. Wall framework must be affixed to the floor and ceiling for maximum support. 2 Position carrier unit in the prepared opening. Carrier face plate must be flush with the front of the surrounding studs so that maximum support for the wall sheeting (applied later) will be accomplished.
Water supply installation 4 1 R½ 2 R½ 5 3 D54386-001 © 04-2012 NPT 1/2" elbow 5
A 7 8 B 1 Install wall surface material such as high density Gypsum / green Board, Cement Board, Tile Backer Board with optional ceramic tile finish surface as the most suitable materials. Provide cut outs for the protruding parts like inlet and outlet pipes and the rectangular access box.
4 Bowl installation 1 Remove yellow protection plugs and seals from pipes. Add dimension X and 1/8". Using that dimension, mark a line on the pipe measuring from the hub side. Cut off the pipe at the line with a pipe cutter. 1 2 5 2 Insert discharge pipe into the pipe hub in the wall. Place a straight edge flush against the wall and mark a line on the pipe. Fit finned rubber seal onto flush pipe. Repeat same procedure for discharge pipe. X +1/8" +(3 mm) X Add dimension Y and 1/8".
Remove protective sleeves from mounting rods. Determine protruding rod length for bowl installation. Install both pipes into the hubs in the wall. A 2 A 3 1 2 +13/16" +(20 mm) CAUTION High torque forces – WC ceramic appliance may break ` 9 Do not overtighten hex nuts. Place bowl onto rods. Attach cap washer with nose up and facing forwards onto rods. Install washer and hex nuts, tighten loosely. Level bowl. Tighten hex nuts. Snap on the bolt caps.