Infinity-Z Shower Door & Base Kit SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to the support.BathAuthority.com web page.
INFINITY-Z SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to the support.BathAuthority.com web page. Please read these instructions carefully before installing.
Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the package by marking all the components on the “Detailed Diagram of Shower Door Components”. Examine boxes and packages for shipping damage. If the unit has been damaged, has a finishing defect, or is missing parts, please contact our customer support department within 5 business days of the delivery date.
Detailed Diagram of Shower Door Components Packing List 01 02 03 04 05 06 07 08 09 Glass profile Wall profile Guide rail Glass door Stationary glass Handle Anti-water strip Single side strip Round head screw ST4.2×30 2pcs 2pcs 2pcs 1pc 1pc 1pc 3pcs 1pc 8pcs 10 11 12 13 14 15 16 17 18 Round head screw ST4.2x25 Round head screw ST4.2x10 Flat head screw ST4.
Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details. W Fig. 1 2. Your Guide rails (03) has been precut for your Shower model opening width: 48” or 60” for shower width. If W-width of your wall-to-wall opening is equal to the size of your Shower model, it is unnecessary to cut the Guide rails and you can continue to Step 3.
Fig. 3 3. If the Guide rails (03) have been cut, you will need to reinstall roller stopper on each Guide rail on the side that has been cut. Remove existing stopper. Mark the drilling hole with a distance of 3 1/8” from the cut off edge of the Guide rail. Drill the new holes using Ø1/8” drill bit; then secure the stopper with screw. 1 3 1/8” ATTENTION: Do not drill the Guide rail throughout, only the first layer. See Fig. 4 for details Ø 1/8” 2 Fig. 4 “INFINITY-Z” Rev.2 Ver.
4. Secure the bottom Guide rail (03) to the Glass profiles (01) with the Round head screws ST4.2x25 (10). See Fig. 5 for details. Fig. 5 5. Slide the Stationary glass (05) fully into the groove of the Glass profile (01), and then secure it to the bottom Guide rail (03) with the Glass holder (16). See Fig. 6 for details. Fig. 6 “INFINITY-Z” Rev.2 Ver.
6. Slightly tap the Single side strip (08) in between the glass and the glass profile using wooden shims or other piece of wood. The strip should be inserted from the side that will face inside the shower. ATTENTION: Do not use the screwdriver or other metal objects; you can scratch or damage the glass and aluminum. 7. Repeat Step #3, Step #4, Step #5 and Step #6 to fasten the upper Guide rail (03) to the Glass profile and secure the Stationary glass by the Glass holder (16). See Fig. 7 for details. Fig.
. Move the finished frame to the designated position on the shower base, the bathtub or the threshold (depending on your installation); push it against the walls. If your top and bottom wall opening measurements are different or if the walls are out-ofplumb, make adjustment by slightly pulling the Wall profiles out of the Glass Profiles. Use the level to adjust the frame in the vertical position See Fig. 9 for details. Fig. 9 10.
11. Attach the Towel bar (18) to the Stationary glass (05). 1 NOTE: Towel bar must be installed on the outside of the stationary glass. See Fig. 11 for details. 2 Fig. 11 NOTE: Glass Door (04) may come with the Wheel assemblies (17) preinstalled. If not, please refer to (Fig. 12) for detailed installation. 12. Fasten the top and the bottom Wheel assemblies (17) to the Glass door (04). The top wheels can adjust the door level with the adjustable bolt and lock nut.
13. Slide the top door wheels into the top Guide rail (03). Push the bottom wheels in the bottom Guide rail by pressing down the button. Use the Phillips screwdriver #2 (do not use power screwdriver) to adjust upper wheels, make sure they move smoothly and the door closes tight. See Fig. 13 for details. 1 3 2 4 Fig. 13 1 14. Install the Handle (06) to the Glass door (04). Press the anti-water strips (07) on the vertical edge of the Stationary glass (05) and both vertical edges of the Glass door.
15. Do the final adjustments of the assembled unit in the Wall profiles. Drill the holes in the Wall Profile and Glass profile using Ø 1/8” drill bit. ATTENTION: Do not drill the profiles throughout, only the first layer of the wall and glass profiles. 1 Ø 1/8” 2 Secure the Wall profile to the Glass profile using the Round head screws ST4.2×10 (11). Cover the exposed screw heads with the Decorative covers (13). See Fig. 15 for details. 3 Fig. 15 16.
Product Maintenance To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. To ensure long lasting life for your glass shower products, wipe them off after each use with a soft cloth. Rinse and wipe off the glass using either soft cloth or squeegee to prevent soap buildup.
SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to your model’s web page on BathAuthority.com Please read these instructions carefully before installing.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
SINGLE THRESHOLD SHOWER BASE Center Drain Configuration W W1 11 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1132320 DLT-1136360 32"×32" 36"×36" 32" 36" 32" 36" 15" 15" 16" 18" DLT-1134420 34” x 42” 34” 42” 15” 21” DLT-1132480 DLT-1136480 DLT-1130600 DLT-1132600 DLT-1134600 DLT-1136600 32"×48" 36"×48" 30"×60" 32"×60" 34"×60" 36"×60" 32” 36" 30" 32" 34" 36" 48” 48" 60" 60" 60" 60" 15” 15" 15" 15" 15" 15" 24” 24" 30" 30" 30" 30" “SLIMLINE SHOWER BASE” Ver.5 Rev.
SINGLE THRESHOLD SHOWER BASE Left-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1130601 DLT-1132601 DLT-1134601 DLT-1136601 30"×60" 32"×60" 34"×60" 36"×60" 30" 32" 34" 36" 60" 60" 60" 60" 15" 15" 17" 18" 12" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
SINGLE THRESHOLD SHOWER BASE Right-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1130602 DLT-1132602 DLT-1134602 DLT-1136602 30"×60" 32"×60" 34"×60" 36"×60" 30" 32" 34" 36" 60" 60" 60" 60" 15" 15" 17" 18" 12" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
NEO ANGLE SHOWER BASE W C C A W B A MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2036360 DLT-2038380 DLT-2040400 DLT-2042420 36"×36" 38"×38" 40"×40" 42"×42" 36" 38" 40" 42" 18 5/16" 20 5/16" 22 5/16" 24 5/16" 25" 25" 25" 25" 12" 12" 14 3/8" 14 3/8" “SLIMLINE SHOWER BASE” Ver.5 Rev.
QUARTER ROUND SHOWER BASE W C C W R MODEL SPECIFICATION W (in) C (in) R (in) DLT-7033330 DLT-7036360 DLT-7038380 33"×33" 36"×36" 38"×38" 33" 36" 38" 12" 12" 12" 21 5/8" 21 5/8" 21 5/8" “SLIMLINE SHOWER BASE” Ver.5 Rev.
DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration W C C W MODEL SPECIFICATION W (in) C (in) DLT-1032320 DLT-1036360 32"×32" 36"×36" 32" 36" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
DOUBLE THRESHOLD SHOWER BASE Left-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1034481 DLT-1036481 DLT-1036601 34"×48" 36"×48" 36"×60" 34" 36" 36" 48" 48" 60" 17" 18" 18" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
DOUBLE THRESHOLD SHOWER BASE Right-Hand Drain Configuration W W1 D1 D MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in) DLT-1034482 DLT-1036482 DLT-1036602 34"×48" 36"×48" 36"×60" 34" 36" 36" 48" 48" 60" 17" 18" 18" 12" 12" 12" “SLIMLINE SHOWER BASE” Ver.5 Rev.
Shower Base Cross Section Diagram Shower Base Cement board Finished Wall (2"×4") Stud Mortar Drain “SLIMLINE SHOWER BASE” Ver.5 Rev.
Shower Base Installation - Preparation 1. Ensure that the floor and the studs are at right angles. Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower base. Refer to the product drawings and tables in these installation instructions for the drain location. 90° 90° 90° See Fig. 1 and Fig. 2 for details.
2. Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain). See Fig. 3 for example Fig. 3 3. Place the tray into the designated position so that the Drain Body drops around the Drain Pipe and butt the Shower Base up against the studs. See Fig. 4 for details. Lower the base over the drain pipe and set it into place against the studs. Fig. 4 “SLIMLINE SHOWER BASE” Ver.5 Rev.
4. Level the tray and place marks on the studs above the upper edge of the tile flange. See Fig. 5 for details. Level base in two directions Fig. 5 5. Mix the bedding material (Mortar, cement-sand mix, etc.) Concrete or plaster is not recommended. Apply enough bedding material to support the entire bottom of the shower base. This will add additional stability and prevent the base from shifting position. See Fig. 6 for details. Mortar Fig. 6 “SLIMLINE SHOWER BASE” Ver.5 Rev.
6. After the bedding material has been poured and before it sets, place the shower base into the position with the drain assembly sliding over the PVC waste pipe. It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base. Ensure that the base is level in all directions.
Fig. 9 Product maintenance To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. To ensure long lasting life for your glass shower products, wipe them off after each use with a soft cloth. Rinse and wipe of the glass using either soft cloth or squeegee to prevent soap buildup.
DREAMLINE™ EXCLUSIVE LIMITED WARRANTY AS OF MAY 6, 2013 This warranty extends only to the original owner/end‐user for household use only and is not transferable to a subsequent owner. This warranty extends for a designated period of time, so long as it remains in use in its original place of installation. This warranty applies only to DreamLine products purchased from an authorized dealer in United States or Canada.
TEL: 866-731-2244 FAX: 866-857-3638 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Bases please visit www.BathAuthority.