DUET SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to the support.bathauthority.com web page. Please carefully read the instructions before installing. If you have any questions regarding installation, please call our technical support specialists Monday through Friday 9:00 AM – 5:00 PM EST at 1-866-731-8378, ext.
Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the package, by marking all the components on the “Detailed Diagram of Shower Door Components”. Examine boxes and packages for shipping damage. If the unit has been damaged, has a finishing defect, or has missing parts, please contact our customer support department within 3 business days of the delivery date.
Detailed Diagram of Shower Door Components 1 7 5 8 2 9 3 10 11 6 12 13 14 4 Packing List 01 02 03 04 05 06 07 Upper guide rail Wall profile Glass profile Bottom guide rail Glass door Handle Wall anchor 1pc 2pcs 2pcs 1pc 2pcs 2pcs 8pcs 08 09 10 11 12 13 14 Round head screw ST4.2×16 Round head screw ST4.2×30 Decorative cover Roller Handle bracket Guide block (left, right, middle) Rubber stopper 16pcs 18pcs 10pcs 4pcs 4pcs 1 set 6pcs NOTE: Unpack your unit carefully and inspect it.
Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details. W Fig. 1 2. The Upper guide rail (01) and the Bottom guide rail (04) has been precut for the installation between the walls with a distance of: a) 48” If W=48”, then it is unnecessary to cut the Guide rails and you can continue to Step 3. If W<48”, you will need to cut: • Upper guide rail (01) from one end. The cutting length will be D; D=48”−W.
3. Secure Upper guide rail (01) and Bottom guide rail (04) to the Glass profiles (03) with the Flat head screws ST4.2x25 (09). 3 1 See Fig. 3 and Fig. 4 for details. 2 4 Fig. 3 Fig. 4 Rev 1.
4. Push the Wall profiles (02) all the way over the Glass profiles (03) at both sides. Make sure the flange of the wall profile faces inside the shower. 1 See Fig. 5 and Fig. 6 for details. 2 Fig. 5 Fig. 6 Rev 1.
5. Move the finished frame to the designated position and push it against the walls. If your top and bottom wall opening measurements are different or if the walls are out-of-plumb, make adjustment by slightly pulling the Wall profiles out of the Glass Profiles. Use the level to adjust the frame in the vertical position. See Fig. 7 for details. Fig. 7 6. Using help to hold this frame in the right position, mark the drill holes on the wall through the holes on the flange of the Wall Profile.
7. Apply silicone along the wall profile and around the holes on the wall. Also apply silicone under the bottom guide rail. Place the shower frame back in to the designated position and secure it to the walls using Round head screws ST4.2×30 (09). 1 See Fig. 9 for details. 2 Fig. 9 8. Secure the Rollers (11) to the top of the Glass door (05). Mind the position of the rollers. Attach the Handle brackets (12) to the Glass doors (A & B). The handle brackets should face the same direction as the rollers.
PLEASE NOTE: • On the outside Glass door (A) the Handle and the Rollers should face out. • On the inside Glass door (B) the Handle and the Rollers should face inside. A See Fig. 11 and Fig. 12 for details. Fig. 11 B Fig. 12 Rev 1.
9. One by one suspend both Glass doors onto the Upper guide rail as shown on Fig.13. Tilt the Glass door (A) a little to make the glass slide into the channel of guide rail. Suspend the Glass door (B) to the guide rail the same way. 1 3 B A See Fig. 13 and Fig. 14 for details 2 4 Fig. 13 Fig. 14 Rev 1.
10. Slide both Glass Doors to the right. Insert the Left guide block (13) into the channel on the left side of the Guide rail and secure it using the Round head screw ST4.2 × 16 (08). Cover the screw head with Decorative cover (10). 1 See fig. 15 for details. Repeat Step #10 to install the Right guide block and the Middle guide block to the Guide rail. 2 NOTE: If the guide rail has been cut off in Step #2, go to Step #11 Fig. 15 1 11.
1 12. Fasten the Rubber stopper (14) inside the groove of the Wall profile using the Round head screw ST4.2×16 (08). See Fig. 17 for details. 2 Fig. 17 13. Do the final adjustments of the assembled unit in the Wall profiles. Drill the holes in the Glass profiles through the predrilled holes on the Wall profile. 1 Ø 1/8” ATTENTION: Make sure not to drill the holes throughout, only the first layer of the wall profile. Secure the Wall profile to the Glass profile using the Round head screw ST4.
14. Apply the sealant along the profiles and guide rails; on the seams between the bottom guide rail and the profiles as well as along the shower base or threshold. See Fig. 19 for details. caulk Fig. 19 Product Maintenance To insure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
WARRANTY DREAMLINE™ LIMITED WARRANTY This is Bath Authority LLC’s (“DreamLine”) exclusive written warranty effective April 2, 2012 This warranty extends only to the original owner/end-user for household use only and is not transferable to a subsequent owner. This warranty applies only to DreamLine™ products purchased from an authorized dealer and installed in United States or Canada. Proof of purchase (original sales receipt) must be provided with all warranty claims.
TEL: 866-731-8378 – 215-957-1411 FAX: 866-227-9245 – 215-893-1780 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.BathAuthority.com Rev 1.