Cornerview Shower Enclosure & Base SHOWER ENCLOSURE AND BASE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
©2018 DreamLine. All Rights Reserved SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice for the purpose of product improvement and customer experience. Please refer to the model’s web page on DreamLine.com for the latest technical drawings, installation manuals, warranty information or additional product details.
©2018 DreamLine. All Rights Reserved Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the parts are included in the package by checking off the components on the parts list.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine. All Rights Reserved Shower Base Cross Section Diagram Finished Wall Shower Base Cement board (2"×4") Stud Mortar Drain* * not included This product should be installed by someone familiar with the construction requirements for this type of project and the care necessary for the safe installation and operation of the product.
©2018 DreamLine. All Rights Reserved Shower Base Installation - Preparation 1. Ensure that the floor and the studs are at right angles. Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower base. Refer to the product drawings and tables in this installation manual for the drain location.
©2018 DreamLine. All Rights Reserved 2. Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain). (Fig 2) Fig 2 3. Place the tray into the designated position so that the Drain cutout drops around the Drain Pipe and butt the Shower Base up against the studs. (Fig 3) Lower the base over the drain pipe and set it into place against the studs.
©2018 DreamLine. All Rights Reserved 4. Level the tray and place marks on the studs above the upper edge of the tile flange. (Fig 4) Level base in two directions Fig 4 5. Mix the bedding material (Mortar, cement-sand mix, etc.) Concrete or plaster is not recommended. Apply enough bedding material to support the entire bottom of the shower base. This will add additional stability and prevent the base from shifting position.
©2018 DreamLine. All Rights Reserved 6. After the bedding material has been poured and before it sets, place the shower base into the position with the drain assembly sliding over the PVC waste pipe. It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base. Ensure that the base is level in all directions.
©2018 DreamLine.
©2018 DreamLine. All Rights Reserved Product Maintenance BASES and BACKWALLS: To ensure long lasting life for your acrylic base and/or back walls: wipe them off after each use with a soft cloth. To clean the acrylic base or back walls use non-abrasive sprays or cream-based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.com ©2018 DreamLine.
CORNERVIEW / FRENCH CORNER SHOWER ENCLOSURE INSTALLATION Id NSTRUCTIONS e rve n i L e s m e a sR e r D ght © Ri All IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. Please refer to the model’s web page on DreamLine.com for the latest technical drawings, installation manuals, warranty information or additional product details.
Table of Contents Section title Page # Preparation Tools 2 3 d e e n v i r L e s m e a R e Dr ghts © Ri All Detailed Diagram of Shower Door Components 4 Parts List & Shower Enclosure Plan view 5 Installation Steps 6-11 Product Maintenance 12 d e e n v i r L e s m e a R e Dr ghts © Ri All ! This product should be installed by someone familiar with the construction requirements for this type of project and the care necessary for the safe installation and operation of the product.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with the packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the necessary parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
Tools Level Power Drill Work Gloves Tape Measure Phillips Screwdriver Pencil d e e n v i r L e s m e a R e Dr ghts © Ri All Soft Head Hammer Carpenter’s Square Drill bit Ø5/16" (8mm) Razor Knife Drill bit Ø1/8" (3mm) 100% Silicone Safety Glasses Tip: Measure the finished opening before proceeding with the installation to be sure that the correct model size has been ordered. Threshold must be level.
Detailed Diagram of shower door components 5 6 7 8 1 d 2 e e n v i 3 er 3 L s m e a R e r s D ght © Ri 4 All 2 9 10 d e e n v i r L e s m e a R e Dr ghts © Ri All CORNERVIEW/FRENCH CORNER Shower Enclosure manual Ver 4 Rev 1 10/2018 ©2018 DreamLine.
Parts List Part# DESCRIPTION QTY Part# 2pcs 07 DESCRIPTION ST4.2x10 Pan head screw QTY 01 Wall profile 02 Panel Glass Assembly 2pcs 08 Decorative cover and washer 4pcs 03 Door Glass Assembly 2pcs 09 Wall anchor 8pcs 04 Rail connector 2pcs 10 M5x8 Bolt 8pcs 05 ST4.2x40 Truss head screw 8pcs 11 Roller wheel 8pcs 06 ST4.
Installation steps 1. Place the Wall Profiles (#01) onto the threshold at a distance of 34-1/2” or 40-7/16” (depending on the model size). Measure from the finished corner of the opening and mark the position on the wall at the threshold. Use a level to align the Wall Profiles (#01) vertically and mark the wall.
3. Insert the Rail Connector (#04) into the guide rails of the Panel Glass Assembly (#02). Drill a hole into the outer layer of the Rail Connector (#04), through the predrilled hole in the guide rails using an Ø1/8” drill bit. Fasten the top and bottom Rail Connector (#04) to the guide rails with the ST4.2×10 Truss Head Screws (#06). (Fig 3a and Fig 3b) ! NOTE: To prevent damaging the Rail Connector (#04), tighten but Do Not overtighten the screws.
4. Align the assembled Panel Glass Panels (#02) onto the Shower base and slide the Glass Profiles into the installed Wall Profiles (#01). (Fig 4) d e e n v i r L e s m e a R e Dr ghts © Ri All Wall Profile Glass Profile ©2018 DreamLine.
5. Insert the Roller Wheels (#11) into the groove of the Upper Guide Rail, then attach the Door Glass Assemblies (#03) to the Roller Wheels (#11) using the M5×8 Bolts (#10). Repeat this procedure to attach the Door Glass Assemblies (#03) to the Roller Wheels (#11) in the Bottom Guide Rail. Be sure to install the doors so that the magnetic vinyl seals will meet in the corner. (See Step#6 for details regarding adjusting the rollers.
6. If necessary, adjust the position of the Roller Wheels (#11) within the slot(s) in the top and bottom rails of the Door Glass Assemblies (#03). (Fig 6.1) Perform any final adjustments of the assembled unit within the Wall Profiles (#01) and make certain that the bottom rails are tight to the threshold. From inside the shower, drill holes into the first layer of the Wall Profile and the Glass Profile (Fig 6.2) using an Ø1/8” drill bit.
7. Use a good quality mildew-resistant silicone to seal the connections between the Wall Profiles and the walls, and where the Bottom Guide Rail meets the threshold. (Fig 7) NOTE: The surfaces need to be clean and free of debris before applying silicone. ! Allow 24 hours for the silicone to cure before using the shower. d e e n v i r L e s m e a R e Dr ghts © Ri All 24 Hours ©2018 DreamLine.
Product Maintenance BASES and BACKWALLS: To ensure long-lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
d e e n v i r L e s m e a R e Dr ghts © Ri All d e e n v i r L e s m e a R e Dr ghts © Ri All TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.com ©2018 DreamLine.