DIRECT-TO-STUD SHOWER WALL SET CONJUNTO DE PARED DE DIRECTA AL MONTANTE DUCHA Model / Modelo / Modéle B67916-3838-WH ENSEMBLE MURAL POUR FIXÉE AUX DOUCHE Write purchased model number here. Retain these instructions for future use. Escriba aquí el número del modelo comprado. Conserve estas instrucciones para usarlas en el futuro. Inscrivez le numéro de modèle ici. Conservez ces instructions pour consultation. 93539 www.deltafaucet.com 1 05/18/2017 93539 Rev.
! REQUIREMENTS FOR SUCCESSFUL INSTALLATION KNOWLEDGE BASE: Framing Plumbing These instructions include suggestions for rough construction and plumbing installation. Local building codes vary and could supersede those suggestions. If you are not confident in your ability to perform these tasks, contract out those tasks you need help with or use a professional installer. DO NOT use drywall screws to secure flanges to wall studs. Product damage will occur and will void the warranty.
TOOLS AND MATERIALS REQUIRED • 2” x 4” lumber for additional wall studs • Lumber for bracing • Rags or padding to protect product during bracing NOTE: It is recommended to install insulation. HERRAMIENTAS Y MATERIALES NECESARIOS • Madera de 5,1 cm x 10,2 cm (2” x 4”) para montantes de pared adicionales • Madera para sostener • Trapos o almohadillas para proteger el producto durante la instalación de la madera para sostener NOTA: Se recomienda instalar el aislamiento.
ROUGHING-IN 39 3/4" (100.9 cm) Rough plumbing and bathtub must be installed before panel installation. For masonry construction, floor and walls must be framed to accommodate plumbing and installation. Studs should be located as shown below. 36 3/4" (93.3 cm) 33" (83.8 cm) CONEXIÓN DE CAÑERÍAS Deben instalarse las cañerías y la bañera antes de instalar el panel. Para los trabajos de mampostería, el piso y las paredes deben acanalarse para dar lugar a las cañerías y la instalación.
WALL SET INSTALLATION/ INSTALACIÓN DEL JUEGO DE PIEZAS PARA LA PARED/ INSTALLATION DU CONTOUR 1 2 7/8" (2.22 cm) X X 68" (172.72 cm) Y Y 6" (15.24 cm) Install an additional stud on each side for enclosure door installation. Measure 6” (15.24 cm) from floor to locate 68” stud for enclosure door. Reveal 7/8” (2.22 cm) of 68” stud. IMPORTANT: Studs must be plumb and square to the floor. Inside corners must be square.
4 3 S S Remove any burrs on nailing flange before sealing. Dry fit the assembled panels onto base with flanges on top. APPLY SEALANT to corner of panels as shown. Check for proper alignment. Using adjustable wrench and screwdriver, secure panels with 10-24 x 3/4” screw, 10-24 hex nut and washers. S Quite cualquier rebaba en la brida de clavar antes de sellar. Encaje los paneles en seco en la base con las bridas arriba. APLIQUE SELLADOR en la esquina de los paneles como se muestra.
5 6 Mark stud locations on top flange with pencil. Drill 3/16” clearance holes into flanges only. Do not drill 3/16” holes directly into studs. Drill chuck can damage panel. Use an extended bit holder to reduce risk of drill chuck hitting panels. Push wall to studs and use a pencil to mark panel height on all wall studs. Remove panels. Check that vertical side panel flanges are straight and square to base. Drill 3/16” holes at all stud locations on top flanges.
7 8 A APPLY ADHESIVE to support boards up to pencil line. Secure top and side flanges to studs with 1-1/4” screws (panhead or roundhead, not provided). S APPLY SEALANT along base ledges. NOTE: Gaps between flanges and studs must be less than 1/8”. Insert shims to fill gaps. Install panels by pressing firmly into corners and against studs.
10 S When installing drywall or greenboard, do not screw into flanges or product damage can occur. Braces should be placed on wall studs to prevent wall panel deflection. S Install temporary brace to hold back panel tight against studs while adhesive sets. APPLY SEALANT to all finished seams. Smooth bead of sealant with finger or tool to ensure a watertight seal. Painters tape can be used to mask off the joints for easier clean up. Silicone or acrylic latex sealant is not recommended.
CARE AND CLEANING We recommend that you clean your acrylic bathing product with mild detergents. Use a terry cloth towel, soft cloth, or sponge. Avoid using abrasive scrubbing pads, steel wool, or sponges. After cleaning, rinse thoroughly with water. NOTICE: When using drain cleaner or clog remover, rinse thoroughly with water. NOTICE: Certain chemicals and cleaners may deteriorate the acrylic surface, causing cracks and, potentially, property damage.
LIMITED WARRANTY All All parts and finishes of the Delta® Tub Shower unit are warranted to the original consumer purchaser to be free from defects in material and workmanship for the time periods listed below. Delta recommends using a professional plumber for all installation and repair.
NOTES/NOTAS 12 93539 Rev.