Install Instructions

Ceilin
Information is subject to change without notice or obligation. M-54302 REV. C
Notes: Dimensions denoted by ( ) are in millimeters.
Ceiling Radiation Damper
SIG-CRD
Combustible Ceiling Installation Instructions
FIG. 1
For fan models: SIG80, SIG80D, SIG80DL, SIG80H, SIG80HL, SIG80L, SIG80M,
SIG80MLED, SIG110, SIG110D, SIG110H, SIG110L, SIG110M, SIG110HL, SIG110DL,
SIG110LED, SIG80-110, SIG80-110D, SIG80-110H, SIG80-110MH, SIG80-110LED,
SIG80-110DLED, SIG80-110HLED and SIG80-110MHLED.
1. Install the radiation damper onto the inlet side of the fan so that the holes in the sleeve align
with mounting holes on the fan using the four #10-32 x ½” long screws and 10-32 nuts
provided with the damper assembly (general installation). The mounting flange of the fan
should be aligned with the mounting flange of the damper assembly (refer to Figure 1).
2. Prior to the gypsum ceiling being placed, install the Damper Supports 13-3/16” on center at
the location of the damper and fan assembly. The supports consist of two pieces of 2x4’s;
one piece is to be cut to the truss/joist height (Damper support1), the second is to be cut per
the following equation (Damper Support 2). The supports are to be flush mounted to the
bottom of the joist/truss and secured using at minimum 2” wood screws. Sizes for the fan
supports are based on the presence of a resilient channel, please refer to the appropriate UL
floor/ceiling design. For reference:
𝐷𝑎𝑚𝑝𝑒𝑟 𝑆𝑢𝑝𝑝𝑜𝑟𝑡 2 (𝐿𝑒𝑛𝑔𝑡ℎ) = 5
1
2
𝑅𝑒𝑠𝑖𝑙𝑖𝑒𝑛𝑡 𝐶ℎ𝑎𝑛𝑛𝑒𝑙 𝐻𝑒𝑖𝑔ℎ𝑡
3. Damper Support 2 is optional. An alternate Installation can be done using only Damper
Supports 1.
Gypsum
(Thickness my vary)
Resilient Channel
Damper Support 1
1
Grille
Sub-Flooring
Finish Flooring
Vapor Barrier
Delta Signature SIG-CRD
Damper and Fan
Suspension Bracket
Damper Support 2
10-32 x ½” l
Screw and Nut

Summary of content (2 pages)