Dell EMC PowerSwitch N3200-ON Series Installation Guide August 2020 Rev.
Notes, cautions, and warnings NOTE: A NOTE indicates important information that helps you make better use of your product. CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid the problem. WARNING: A WARNING indicates a potential for property damage, personal injury, or death. © 2020 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries.
Contents Chapter 1: About this guide........................................................................................................... 6 Related documents..............................................................................................................................................................7 Information symbols............................................................................................................................................................
After switch placement.................................................................................................................................................... 41 Switch replacement...........................................................................................................................................................41 Chapter 5: External power adapter.............................................................................................. 43 Power adapter holder assembly..
Product recycling and disposal...................................................................................................................................... 84 Chapter 11: Dell EMC support......................................................................................................
1 About this guide This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting your switch, inserting modules, and connecting to a power source. CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this equipment. NOTE: Only trained and qualified personnel can install this equipment. Read this guide before you install and power on this equipment. This equipment contains two power cables.
Related documents For more information about the N3200-ON Series, see the following documents: ● ● ● ● ● Dell EMC PowerSwitch N3200-ON Series Warnings Guide Dell EMC PowerSwitch N3200-ON Series Setup Placemat Dell EMC PowerSwitch N3200-ON Series Release Notes Open Networking Hardware Diagnostic Guide N2200-ON and N3200-ON Series Switches External Power Supply (EPS) Installation for the Dell EMC PowerSwitch N2200-ON and N3200-ON Series Switches NOTE: For the most recent documentation, see Dell EMC support:
2 N3200-ON Series switch The following sections describe the Dell EMC N3200-ON Series (N3208PX-ON, N3224T-ON, N322F-ON, N3224P-ON, N3224PX-ON, N3248TE-ON, N3248P-ON, N3248X-ON, and N3248PXE-ON) switches: Topics: • • • • • • • Introduction Features Physical dimensions LED display Prerequisites N3200-ON Series switch configurations Luggage tag Introduction The N3200-ON Series switches are compact and full width, one rack unit (RU), full-featured fixed form-factor switches. Table 1.
Table 1. N3200-ON Series switch summary (continued) Marketing model name (MMN) Description Power supply unit (PSU) and fans ● 2 ports 100G QSFP28 stacking ● 3 pluggable fan modules ● Normal and reverse airflow options N3248P-ON ● 48 ports 1G BASE-T RJ45 multigigabit ports with 802.
1. 3. 5. 7. 9. Luggage tag RJ45 serial management port USB Type-A port MicroUSB Type-B port 10G SFP+ ports 2. 4. 6. 8. 1GBASE-T RJ45 RJ45 Ethernet console port Stack ID Status LEDs 2. 4. 6. 8. 1G SFP RJ45 Ethernet console port Stack ID Status LEDs 2. 4. 6. 8. 1GBASE-T RJ45 with 802.3at Type-2 (30W) PoE RJ45 Ethernet console port Stack ID Status LEDs N3224F-ON I/O-side view 1. 3. 5. 7. 9.
1. 3. 5. 7. 9. Luggage tag RJ45 serial management port USB Type-A port MicroUSB Type-B port 10G SFP28 ports 2. 4. 6. 8. 10GBASE-T RJ45 with 802.3bt Type-4 (90W) PoE RJ45 Ethernet console port Stack ID Status LEDs 2. 4. 6. 8. 1GBASE-T RJ45 RJ45 Ethernet console port Stack ID Status LEDs 2. 4. 6. 8. 1GBASE-T RJ45 with 802.3at Type-2 (30W) PoE RJ45 Ethernet console port Stack ID Status LEDs N3248TE-ON I/O-side view 1. 3. 5. 7. 9.
N3248X-ON I/O-side view 1. 3. 5. 7. 9. Luggage tag RJ45 serial management port USB Type-A port MicroUSB Type-B port 10G SFP28 ports 2. 4. 6. 8. 10GBASE-T RJ45 RJ45 Ethernet console port Stack ID Status LEDs 2. 4. 6. 8. 10GBASE-T RJ45 with 802.3bt Type-4 (90W) PoE RJ45 Ethernet console port Stack ID Status LEDs N3248PXE-ON I/O-side view 1. 3. 5. 7. 9.
1. 100G QSFP28 stacking ports 2. Fans 3. AC or DC PSUs N3224PX-ON, N3248P-ON, N3248PXE-ON PSU-side view 1. 100G QSFP28 stacking ports 3. EPS connections 2. Fans 4. AC or DC PSUs Features The N3200-ON Series switch offers the following features: ● Ports: ● ● ● ● ● ● ● ● ● ○ N3208PX-ON—Compact, four ports 1GBASE-T RJ45 with 802.3bt Type-4 90W PoE, four ports 5GBASE-T RJ45 with 802.
● N3208PX-ON—Up to two external power adapters ● N3224PX-ON, N3248P-ON, and N3248PXE-ON—External power supply connectors to connect the MPS-1S or MPS-3S shelf ● N3224T-ON, N3248X-ON, and N3248TE-ON—Normal and reverse airflow options ● System ground connector ● Switch-monitoring LEDs Physical dimensions The N3200-ON Series switch has the following physical dimensions, excluding the PSU and fan tray handle: ● N3208PX-ON: ○ 43.5 mm x 279.4 mm x 312 mm (H x W x D) ○ 1.71 in x 11 in x 12.
N3224F-ON, N3224P-ON, N3224PX-ON, N3224T-ON, N3248P-ON, N3248PXE-ON, and N3248TE-ON LEDs 1. Link status LEDs 3. 5. 7. 9. SFP+ port activity LEDs Stack Master LED Power LED Locator LED/System Beacon 2. Console port LEDs on the left side—management port on the right side 4. Stack ID LED 6. System Status/health LED 8. Fan LED 10. Stacking port activity LEDs Table 2.
Table 2.
Table 5. 1G, 5G, 10G Base-T PoE port LEDs (continued) LED Description ● Flashing green—port activity and PoE power off ● Flashing yellow—port activity and PoE power on Table 6. 1G or 10G Base-T non-PoE port LEDs LED Description Link LED All four LEDs: ● Off—No link ● Solid green—Link operating at maximum speed, autonegotiated/forced to 2.
Table 9. QSFP28 port LEDs (continued) LED Description ● Flashing green, ~30ms—port activity at maximum speed, 100G ● Flashing yellow, ~30ms—port activity at speed less than 100G ● Flashing yellow, 1 second on/off—port beacon Prerequisites The following is a list of components that are required for successful switch installation: NOTE: For detailed installation instructions, see Site preparations and N3200-ON Series switch installation.
○ N3248X-ON—1U, 48 ports 10G BASE-T RJ45, four ports 25G SFP28, two 100G QSFP28 ports for stacking, two pluggable AC or (optional) DC PSUs, three pluggable fan modules, and normal and reverse airflow options ○ N3248PXE—1U, 48 ports 10G BASE-T RJ45 with 802.
1. Product ID QRL 3. SVC tag 5. Exp Svc code 20 N3200-ON Series switch 2. Product information QRL 4.
3 Site preparations The N3200-ON Series switch is suitable for installation as part of a common bond network (CBN). You can install the switch in: ● Network telecommunication facilities ● Data centers ● Other locations where the National Electric Code (NEC) applies NOTE: Install the switch into a rack or cabinet before installing any additional components such as cables or optics.
Rack mounting When you prepare your equipment rack, ensure that the rack is grounded. Ground the equipment rack to the same ground point the power service in your area uses. The ground path must be permanent. Switch ground Dell EMC recommends you ground your switch. Use the N3200-ON Series switch in a common bond network (CBN). Connect the grounding cables as described in N3200-ON Series switch installation.
CAUTION: On an AC switch, use the power cable as the main disconnect device. Ensure that the socket-outlet is located and installed near the equipment and is accessible. NOTE: Software controls the module power. You do not see module LEDs when the switch powers up in ONIE. Storing components If you do not install your N3200-ON Series switch and components immediately, properly store the switch and all components using these guidelines: ● Storage location temperature must remain constant.
4 N3200-ON Series switch installation To install the N3200-ON Series switch, complete the installation procedures in the order that is presented in this chapter. Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs). NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the N3200-ON Series switch and components.
Unpacking Steps Unpack the system carefully. 1. 2. 3. 4. 5. Place the container on a clean, flat surface and cut all straps securing the container. Open the container, or remove the container top. Carefully remove the switch from the container and place it on a secure and clean surface. Remove all packing material. Inspect the product and accessories for damage.
The ground lug ships with the optionally ordered DC version PSUs. The AC-no-OS version of the N3248PXE-ON switch, which you must special order, also ships with the ground lug. CAUTION: Grounding conductors must be made of copper. Do not use aluminum conductors. NOTE: Coat the one-hole lug with an antioxidant compound before crimping. Also, bring any unplated mating surfaces to a shiny finish and coat with an antioxidant before mating. Plated mating surfaces must be clean and free from contamination.
1. Locate the ceiling mount tray, ceiling anchors, and 32 mm (1.26 in) M4 screws that are included with your switch. 2. Using the ceiling mount tray as a template, hold the tray on the ceiling where you want to mount the switch. Mark the four mounting hole locations with the pencil. 3. Drill four holes into the ceiling at the pencil marks. 4. Install the four ceiling-anchors into the ceiling. 5. Attach the ceiling mount tray to the ceiling by drilling the 32 mm (1.26 in) M4 screws into the ceiling anchors.
To uninstall the switch, unscrew the four ceiling mount tray screws and slide the switch from the mushroom head hooks. N3208PX-ON wall-mount switch installation This switch installation procedure is for the compact N3208PX-ON switch only. NOTE: Do not use this installation procedure for the full-width N3200-ON Series switches. The mounting supplies for this installation ship with the switch. To complete this installation, you need a pencil, drill, and Phillipshead drill bit. 1.
7. Line up the two mushroom-heads on the switch to the wall mount tray hook cutouts until the switch locks into place. 8. Fix the switch to the wall mount tray using two screws on each side. To uninstall the switch, unscrew the four wall mount tray screws and slide the switch from the mushroom head hooks. DIN buckle rail installation Use the DIN buckle with wall- or ceiling-mount installations. This switch installation procedure applies to the compact N3208PXON switch only.
wall- or ceiling-mount tray 2. Screw the DIN buckles to the bottom of the wall- or ceiling-mount tray using three screws for each DIN buckle. 3. Slide the switch into the wall-mount tray. 4. Line up the two mushroom-head hooks on the switch to the tray hook cutouts until the switch locks into place. 5. Fix the switch to the tray using two screws on each side. 6. Snap the two DIN buckles into the DIN rails.
To uninstall the switch, unscrew the four mounting tray screws and slide the switch from the mushroom head hooks. Standard bracket two-post installation This switch installation procedure is for the compact N3208PX-ON switch only. Use these brackets for front- or center-mount installation. NOTE: Do not use this installation procedure for the full-width N3200-ON Series switches. You must order the mounting supplies for this installation separately.
2. Insert the mounting brackets onto the mushroom head on each side of the switch and slide the mounting bracket back to lock it into place. The mounting bracket ears face the PSU-side of the switch. 3. Attach the mounting brackets to the switch using four screws for each bracket. 4. Slide the switch into the two-post rack until the mounting bracket ears line up with the rack. 5. Attach the switch to the two-post rack using two #12-24 screws on each side.
2. Insert the mounting brackets onto the mushroom head on each side of the switch and slide the mounting bracket back to lock it into place. The mounting bracket ears face the I/O-side of the switch. 3. Attach the mounting brackets to the switch using four screws for each bracket. 4. Slide the switch into the two-post rack until the mounting bracket ears line up with the rack. 5. Attach the switch to the two-post rack using two #12-24 screws on each side.
3. Repeat to attach two brackets to the right side of the switch. 4. Hold the wall- or ceiling-mount template to the wall or ceiling. Mark the screw-hole locations on the wall with the pencil. Wall- or ceiling-mount dimensions 5. Drill eight 8 mm (0.3 in) holes in the wall or ceiling at the pencil marks. 6. Install the eight anchors into the holes.
7. Screw one M5 screw on each corner, four screws total, into the anchors, leaving approximately 5 mm (0.20 in) gap between the anchor and the screw. 8. Slide the switch onto the screws and tighten the screws to secure the switch in place. Torque the screws to 24 in-lbs. Wall mount 9. Screw the remaining four M5 screws into the anchors and tighten the screws. Torque the screws to 24 in-lbs.
One RU ReadyRails installation Install the N3200-ON Series switch, excluding the N3208PX-ON switch, using one of the following installation instructions. You can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount. NOTE: You must order the ReadyRails mounting supplies for this installation separately.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1. Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the back flange rail pegs in the back vertical post flange. The center extractions show how the pegs appear in both the square and nonthreaded round holes. 2. Align and seat the front flange pegs in the holes on the front side of the vertical post.
2. Attach one rail to the front post flange with two user-supplied screws, item 2. 3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two usersupplied screws, item 3. 4. Repeat this procedure for the second rail. Center-mount ReadyRail installation This switch installation procedure is for the full-width N3200-ON Series switches only. NOTE: Do not use this installation procedure for the compact N3208PX-ON switch.
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3. 3. Repeat this procedure for the second rail. Threaded ReadyRails installation This switch installation procedure is for the full-width N3200-ON Series switches only. NOTE: Do not use this installation procedure for the compact N3208PX-ON switch. NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1.
Figure 3. Four-post threaded round-hole installation 2. Attach the front and back flanges for each rail to the post flanges with two user-supplied screws at each end. Optics installation The N3200-ON Series has SFP+, SFP28, and QSFP28 optical ports. For a list of supported optics, see the specification sheets at www.dell.com/support or contact your Dell EMC Sales representative. CAUTION: ESD damage can occur if components are mishandled.
Switch start-up Supply power to the N3200-ON Series switch after you install your switch. Dell EMC recommends reinspecting your switch before powering it up. Verify the following: ● Optional: The equipment is properly secured to the rack and properly grounded. ● Optional: The equipment rack is properly mounted and grounded. ● The ambient temperature around the unit, which may be higher than the room temperature, is within the limits that are specified for the N3200-ON Series switch.
For more information, see Switch start-up. 9. Establish a connection to the switch CLI. 10. Confirm that the software version of the replacement switch is the same as the previously installed switch. show version If the software versions do not match, upgrade the replacement switch software using the firmware download procedure. 11. Copy the backed-up switch configuration to the new switch.
5 External power adapter This section describes how to install the external power adapter (EPA) inside the power adapter holder. It also describes how to attach the power adapter holder assembly to the switch. This EPA installation instruction procedure applies to the N3208PX-ON switch only. NOTE: Do not use this installation procedure for the full-width N3200-ON Series switches. You can use one or two EPAs with your adapter holder in a two-post or four-post rack.
4. Install the AC power cable to the EPA and secure with the wire clip. 5. Bend the AC power cable 180 degrees along the holder wall and through the cable cutout. 6. Secure the wire clip over the EPA cable. Wall or ceiling installation To install a single EPA power adapter holder on a wall or ceiling: NOTE: This installation instruction procedure applies to the external power adapter. You must order the mounting supplies for this installation separately.
Wall mount 5. Install the AC power cable to the EPA and secure with the wire clip. 6. Bend the AC power cable 180 degrees along the holder wall and through the cable cutout.
DIN rail installation To install an external power adapter to DIN rails: NOTE: This installation instruction procedure applies to the external power adapter only. You must order the mounting supplies for this installation separately. 1. Remove the two DIN buckles and screws from the shipping box. 2. Install the EPA in the power adapter holder using Steps 1 through 3 in the Power adapter holder assembly section. 3.
Single-EPA and switch four-post installation To install a single EPA power adapter holder on the side of your switch in a four-post rack: NOTE: This installation instruction procedure applies to the N3208PX-ON switch only. 1. Install the single EPA in the power adapter holder using the instructions in Power adapter holder assembly. 2. Align the two mushroom heads on the switch with the two holes on the power adapter holder. Slide the power adapter holder forward to lock it in place. 3.
2. Align the two mushroom heads on the switch with the two holes on the power adapter holder. Slide the power adapter holder forward to lock it in place. 3. Use two screws to secure the power adapter holder to the side of the switch. 4. Install the AC power cable to the EPA and secure with the wire clip. 5. Bend the AC power cable 180 degrees along the holder wall and through the cable cutout. 6. Align the L-bracket with mushroom head on the switch and the power adapter holder.
Single-EPA and switch two-post front-mount installation To install a single EPA power adapter holder on the side of your switch in a front-mount two-post rack: NOTE: This installation instruction procedure applies to the N3208PX-ON switch only. 1. Install the single EPA in the power adapter holder using the instructions in Power adapter holder assembly. 2. Align the two mushroom heads on the switch with the two holes on the power adapter holder. Slide the power adapter holder forward to lock it in place. 3.
Dual-EPAs two-post front-mount installation To install two EPA power adapter holders in a front-mount two-post rack: NOTE: This installation instruction procedure applies to the N3208PX-ON switch only. NOTE: For this installation, you need two-rack units of space in your mounting rack. Install the switch in the bottom portion of the two-rack units and keep the top portion open. 1. Align the mushroom heads on one power adapter holder with the two cutouts on the second power adapter holder and slide together.
6. Repeat with the right L-bracket. 7. Install the AC power cable to the EPA and secure with the wire clip. 8. Bend the AC power cable 180 degrees along the holder wall and through the cable cutout. 9. Install the dual-EPA assembly above the switch in the two-post rack. For rack installation instructions, see N3200-ON Series switch installation.
Dual-EPAs two-post center-mount installation To install two EPA power adapter holders in a center-mount two-post rack: NOTE: This installation instruction procedure applies to the N3208PX-ON switch only. NOTE: For this installation, you need two-rack units of space in your mounting rack. Install the switch in the bottom portion of the two-rack units and keep the top portion open. 1.
6. Repeat with the right L-bracket. 7. Install the AC power cable to the EPA and secure with the wire clip. 8. Bend the AC power cable 180 degrees along the holder wall and through the cable cutout. 9. Install the dual-EPA assembly above the switch in the two-post rack. For rack installation instructions, see N3200-ON Series switch installation.
External power adapter
6 Power supply The N3200-ON Series switch ships with one pluggable AC power supply. You can order a second AC PSU separately. If you require DC power, you can order one or two DC PSUs. The N3224PX-ON, N3248P-ON, and N3248PXE-ON switches also support an optional external power supply that connects to the switch using an MPS-1S or MPS-3S shelf. Use the EPS to add redundancy, or extend the PoE budget based on your requirement.
• Connect the EPS shelf Components The following power supply options are available for the N3200-ON Series switch: ● AC or DC power supply with integrated fan ● AC or DC power supply with integrated reverse-flow fan NOTE: Reserve airflow is only supported on the N3224T-ON, N3248TE-ON, and N3248X-ON switches. For the N3200-ON Series switches, power supply 1 (PSU1) and power supply 2 (PSU2) are on the right side of the switch. PSU1 is near the center of the switch; PSU2 is on the right edge of the switch.
Figure 4. AC power cable clips PSU LEDs ● Solid green—Input is OK. ● Flashing green blink at 1 Hz—PSU is in a faulty state. ● Off—PSU is off. AC or DC power supply installation NOTE: The PSU slides into the slot smoothly. Do not force a PSU into a slot as this action may damage the PSU or the switch. NOTE: Ensure that you correctly install the PSU. When you install the PSU correctly, the power connector is on the right side of the PSU. 1.
1. PSU. Optional PSU also shown. NOTE: The N3200-ON Series switch powers up when you connect the cables between the power supply and the power source. NOTE: For hot-swappable PSUs, after you have connected the power cable to the switch, use the included black power-cable tie to secure the cable in place. AC or DC power supply replacement CAUTION: Disconnect the power cable before uninstalling the power supplies. Also, disconnect all power cables before servicing.
Figure 5. DC power connector and wiring block 1. Wiring block 2. Power connector 3. PSU connector 1. Strip a one-half inch section of insulation from each of the power connector wires, as shown. 2. Insert each of the bare wire power connector lengths into the wiring block. The blue wire is -48 V, the black wire is the positive return, and the yellow/green wire is the ground wire, as shown. 3. Use a flat-head screwdriver to tighten the screws that secures the bare wires into the wiring block. 4.
NOTE: The conductor screw can not be smaller than the conductors supplying power. Secure all screws and ground-wire connections. NOTE: Dell Technologies recommends using a 40 A circuit breaker. Before you supply 1300W DC current to the switch, review the current rating of your protective device. NOTE: You need a user-supplied flat-head screwdriver to complete this installation. 1. Wiring block 2. 1300W DC cable 3. PSU socket 1.
6. Return the plastic cover back to the PSU socket. 7. Attach the yellow and green wire to the PSU GND. Secure the wire with the M5 screw. NOTE: To uninstall the cable from the 1300W DC PSU, remove the plastic cover and unscrew the M4 and M5 screws. Pull the 1300W DC cable out from the 1300W DC PSU socket. Connect the EPS shelf This section applies to the N3224PX-ON, N3248P-ON, and N3248PXE-ON switches only.
NOTE: If you are connecting a single EPS power cable to your switch, always use primary A-slot. Leave the secondary B-slot DC power cover in place, as shown: 2. Unscrew the DC-power-OUT cover from the rear of the EPS shelf. NOTE: If you are connecting a single EPS power cable to your MPS-3S shelf, always use primary A-slot. Leave the secondary B-slot DC power cover in place.
3. Connect the EPS power cable to the EPS-DC-In on the switch. Torque the screw to 10 in-lbs. One EPS power cable connected Two EPS power cables connected 4. Connect the other end of the DC cable to either a MPS-1S shelf or MPS-3S shelf.
Torque the screw to 10 in-lbs. One EPS power cable connected to a MPS-1S shelf.
5. Repeat until all EPS power cables are connected. To disconnect an EPS power cable, unscrew the cable and disconnect the cable from the switch.
7 Fans The N3200-ON Series switch, except the N3208PX-ON switch, comes from the factory with three pluggable fan modules. ● N3208X-ON—one fan ● N3224T-ON, N3224F-ON, N3224P-ON, N3224PX-ON, N3248TE-ON, N3248P-ON, N3248X-ON, and N3248PXE-ON— three pluggable fans The N3200-ON Series switch supports two airflow direction options. Do not mix airflow types in a switch. You can use only a single airflow direction in a switch.
1. Fans—Fan1 is near the left edge of the switch; Fan3 is near the center of the switch. Fan LEDs ● Solid green—Fan input is normal ● Flashing green blink at 1 Hz—Fan is in a faulty state ● Off—Fan is off Fan module installation The fan module in the N3200-ON Series switch, excluding N3208X-ON, is field replaceable. 1. Remove the fan slot cover from the N3200-ON Series switch using a small #1 Phillips screwdriver. The fan slot cover has one screw on the top and one screw on the bottom of the platform. 2.
● Fan installation Fan module replacement To request a hardware replacement, see www.dell.com/support/. 1. Take the replacement fan module out of the shipping box. 2. Slide the installed fan module out of the bay. 3. Slide the replacement module into the bay.
8 Management ports The N3200-ON Series switch provides two ports for management and one USB flash drive mount for file transfers. NOTE: The output examples in this section are for reference only. Your output may vary. Topics: • • • RJ45 console port access MicroUSB Type-B console port access USB storage mount RJ45 console port access For the N3200-ON Series switch, the management ports are on the I/O-side of the switch. N3208PX-ON management ports 1.
1. Out-of-band management port (right), RJ45 console port (left) N3248P-ON, N3248PXE-ON N3248TE-ON, and N3248X-ON management ports 1. Out-of-band management port (right), RJ45 console port (left) NOTE: Ensure that any equipment that is attached to the serial port can support the required 115200 baud rate. NOTE: If the serial port of your computer cannot accept a female DB-9 connector, use a DB-9 to USB adapter.
NOTE: Before starting this procedure, be sure that you have a terminal emulation program that is already installed on your computer. If your computer requires non-Dell EMC drivers, and you have issues with your USB console port, contact Dell EMC technical support for assistance. 1. Start up the computer. 2. Connect the USB Type-A end of cable into an available USB port on the computer. 3. Connect the microUSB Type-B end of cable into the microUSB Type-B console port on the switch. 4. Start up the switch. 5.
9 Installation using ONIE This section describes uninstalling an operating system and installing ONIE on your switch. For more information, see switchspecific information at www.dell.com/support. NOTE: Before you install an operating system, ensure that the switch has the most current ONIE and firmware version. To upgrade your switch, go to the Drivers and Downloads page for your switch at www.dell.com/support.
For downloading and updating ONIE from a URL ONIE: Embed ONIE For downloading and updating ONIE from a URL and erases any installed OS During the initial setup, the switch boots to ONIE Install. ONIE Install starts the discovery process. For more information, see Installation using ONIE. NOTE: For more information, see the Open Networking Hardware Diagnostic Guide for N2200-ON and N3200-ON Switches at www.dell.com/support.
After the ONIE uninstall process completes, the switch boots to ONIE: Install OS mode. Install a NOS CAUTION: Installing a NOS using ONIE erases all software configurations on the switch. The configuration settings are not recoverable. Back up all software configurations and installed licenses on the switch before performing OS updates or changes. Store a regular backup of the switch configuration off the switch.
5. Search IPv6 neighbors. 6. Start a TFTP waterfall. The ONIE automatic discovery process locates the stored software image, downloads, and installs it, and reboots the device with the new image. Autodiscovery repeats until a successful software image installation occurs and reboots the switch. ONIE discovery — Usage information ● All ONIE autodiscovery methods download and run only supported default file names, such as onie-installer.
For example, enter ONIE:/ # onie-nos-install ftp://a.b.c.d/ .bin Where a.b.c.d represents the location to download the image file from, and x.x.xx represents the version number of the software to install. The NOS installer image may create multiple partitions during the installation process. After the installation process completes, the switch automatically reboots into the new OS. Install manually using a USB drive You can manually install the NOS software image using a USB device.
10 Specifications This section lists the N3200-ON Series switch specifications. CAUTION: Operate the product at an ambient temperature not higher than 45°C (113°F). NOTE: For RoHS information, see Restricted Material Compliance. Topics: • • • • • • Chassis physical design IEEE standards Agency compliance Safety standards and compliance agency certifications Electromagnetic compatibility Product recycling and disposal Chassis physical design Table 12.
Table 12. Chassis physical design (continued) Parameter Specifications Rack clearance required ● Front: 5 inches (12.7 cm) ● Back: 5 inches (12.7 cm) Table 13. Environmental parameters Parameter Specifications Operating temperature 32°F to 113°F (0°C to 45°C) continuously NOTE: Reduce maximum temperature by 1°C/125 meters (1°F/228 feet) above 950 meters (3,117 ft).
Table 14. Power consumption parameters (continued) Parameter Specifications Maximum steady current consumption ● 7 A@110 VAC ● 3.5 A@220 VAC Total PoE budget NOTE: To support a full-load PoE power budget, you must have external power adapters for the N3208PX-ON switch. For the N3224PX-ON, N3248P-ON, and N3248PXE-ON switches, use the EPS for full-load PoE redundancy. ● ● ● ● ● PoE output per port ● N3208PX-ON: 4x1G Base-T Ports with 4 ports of 802.
Table 14. Power consumption parameters (continued) Parameter Specifications ● Max PoE power 1050, 1600, 2000 W (90-140 Vac)—No EPS ● Max PoE power up to 1440 W (90-140 Vac)—Three-slot EPS N3248P-ON: ● Max PoE power 1050, 1600, 2000 W (90-140 Vac)—Single EPS ● Max PoE power up to 1440 W (90-140 Vac)—Three-slot EPS N3248PXE-ON: ● Max PoE power 1050, 1600, 2000 W (90-140 Vac)—Single EPS ● Max PoE power up to 4800 W (90-140 Vac)—Three-slot EPS Table 15.
Table 16. DC power requirements (continued) Parameter Specifications NOTE: For more information, see Power supplies. Maximum current at full load with fan without PoE 550W DC PSU: ● ● ● ● N3224T-ON: 11.5 A @ 48 V N3224F-ON: 11.5 A @ 48 V N3248TE-ON: 11.5 A @ 48 V N3248X-ON: 11.5 A @ 48 V 1300W DC PSU: ● ● ● ● N3224P-ON: 28 A @ 48 V N3248P-ON: 28 A @ 48 V N3224PX-ON: 28 A @ 48 V N3248PXE-ON: 28 A @ 48 V IEEE standards The N3200-ON Series switch complies with the following IEEE standards.
unauthorized changes or modifications in the equipment. Unauthorized changes or modification could void the user’s authority to operate the equipment. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Figure 6.
Figure 8. Japan: warning label Korean certification of compliance Figure 9. Korean certification of compliance Figure 10. Korean package label Safety standards and compliance agency certifications ● CUS UL 60950-1, 2nd Edition ● ● ● ● ● ● ○ Meets or exceeds Hi Pot and Ground Continuity testing per UL 60950-1.
● IEC 60950-1, 2nd Ed, including all National Deviations and Group Differences ● IEC 62368-1 Electromagnetic compatibility Emissions ● ● ● ● ● ● ● ● ● ● International: CISPR32: Class A Australia/New Zealand: AS/NZS CISPR 32: Class A Canada: ICES-003, Issue-4, Class A Europe: EN55032: CISPR 32: Class A International: CISPR 32: Class A EN55032 Japan: VCCI V-3/2011.
Figure 11. The European WEEE symbol In accordance with the European WEEE Directive, electrical and electronic equipment (EEE) is to be collected separately and to be reused, recycled, or recovered at end of life. Users of EEE with the WEEE marking per Annex IV of the WEEE Directive, as shown above, must not dispose of end of life EEE as unsorted municipal waste, but use the collection framework available to customers for the return, recycling and recovery of WEEE.
11 Dell EMC support The Dell EMC support site provides documents and tools to help you use Dell EMC equipment and mitigate network outages. Through the support site you can obtain technical information, access software upgrades and patches, download available management software, and manage your open cases. The Dell EMC support site provides integrated, secure access to these services. To access the Dell EMC support site, go to www.dell.com/support/.