INSTALLATION MANUAL MID POWER 4T4R Digital Radios 37dBm per Band 5G NR Compliant Passive Cooling Outdoor Rated
MID POWER 4 x 37dBm Output 5G NR Compli Revision History Revision Number Revision Date 1.0.0 5th 1.0.1 25th May 2021 2.0.0 15th November 2021 Upgrade System to Support 800MHz Mode Shuochao Zheng 2.0.1 23rd Add M2RU-PSU48S Installation Shuochao Zheng October 2020 November 2021 Summary of Changes Author Initial Release Shuochao Zheng Add Fan Installation Shuochao Zheng Copyright © 2022 Sunwave All rights reserved.
MID POWER 4 x 37dBm Output 5G NR Compli Content Preface .................................................................................................................................................................................... 5 Safety Instructions .............................................................................................................................................................. 5 Site Considerations .......................................................................
MID POWER 4 x 37dBm Output 5G NR Compli Mount E2-O to Wall ...................................................................................................................................................... 27 Connect Power and Ground Cable to E2-O................................................................................................................... 28 E2-O Mounting Dimension Spacing .............................................................................................................
MID POWER 4 x 37dBm Output 5G NR Compli Preface Safety Instructions All the following “Safety Precautions” must be observed during the entire installation and operation of the CrossFire system. The CrossFire system components are designed for maximum safety and reliability when they are installed, used, and maintained by trained and qualified technicians in accordance with the procedures and instructions contained in this manual.
MID POWER 4 x 37dBm Output 5G NR Compli 16. To comply with FCC RF exposure compliance requirements, each individual antenna used for this transmitter must be installed to provide a separation distance greater than 100cm or more from all persons during normal operation and must not be colocated with any other antenna for meeting RF exposure requirements. 17. Antenna gain should not exceed 6 dBi. NOTE: This device complies with Part 15 of the FCC Rules.
MID POWER 4 x 37dBm Output 5G NR Compli Site Considerations 1. CrossFire complies with FCC RF exposure limits for an uncontrolled environment. 2. The system delay should be taken into consideration when there are neighboring BTS sites that are overlapping in coverage.
MID POWER 4 x 37dBm Output 5G NR Compli DC Power Connections Referring to the diagram, connect the power cables as follows: Higher voltage wire linked to RED cable / Lower voltage wire linked to BLUE cable. Connect “+” to a high potential (+48VDC from a +48VDC power supply; 0VDC from a -48VDC power supply) Connect “-” to a low potential (0VDC from a +48VDC power supply; -48VDC from a -48VDC power supply) Cable Core Cable Length Maximum Expandable Length 14AWG 2m 10m Contact us today: www.
MID POWER 4 x 37dBm Output 5G NR Compli Warning Marks The warning marks on the CrossFire shell should be kept clean, readable, and identifiable. ALWAYS disconnect all lines and power connections before servicing or disassembling this equipment. NEVER touch the surface after the device's power on. For performance and safety reasons, NEVER disassemble and remodel the devices. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Installation Preparation Unpacking and Inspecting This section discusses the procedures for receiving the shipment, inspecting the packing container, unpacking, and inspecting the device. Inspecting the Packing Container Handle the packing container carefully. Inspect the packing container immediately on arrival at the installation site to verify that no obvious damage occurred during shipment.
MID POWER 4 x 37dBm Output 5G NR Compli Inspecting the Device After unpacking the device, place the device on solid ground and check the following to ensure the device has not been damaged: 1. Inspect the device’s appearance, overall dimensions, and weight. 2. Check that the device has not been deformed or bent in any way. 3. Check that there are no warps, scratches, bubbles, or dirt marks. 4. Check that there are no loose, missing or incorrectly fastened screws. 5.
MID POWER 4 x 37dBm Output 5G NR Compli Convection cooling: Maintain 150mm clearance from the bottom of the device to any other planar obstructions. Maintain 150mm clearance from the top of the device to any other planar. Maintain 150mm clearance from both sides of the device to any other planar obstructions. Tools Electric drill, cross head screwdriver, side cutters, ladder, and other tools are needed for M2RU installation which is not offered from Mavenir for now.
MID POWER 4 x 37dBm Output 5G NR Compli Installing the Access Unit (A2) Accessories List Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Rack Installation The Access Unit is a 19” 1U equipment shelf. When installing the Access Unit in a rack, make sure the mechanical loading of the rack is even to avoid a hazardous condition. The rack should safely support the combined weight of all the equipment and be securely anchored. Installing the Access Unit in a climate-controlled room with sufficient air circulation is recommended as the maximum ambient temperature is +50°C.
MID POWER 4 x 37dBm Output 5G NR Compli 3. Place the A2 in the rack and secure the A2 using 2 screws M6×16 on both side and the Phillips screwdriver. 4. Install the fan for cooling if multiple A2s are installed in the same rack. It is necessary to allow at least 3 rack unit (132mm) of free space below each unit for heat dissipation without fan installed or 1 rack unit (44mm) of free space below each unit with fan occupied in the middle.
MID POWER 4 x 37dBm Output 5G NR Compli 6. Connect and screw the ground wire at the A2 rear side. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Fan Installation 1. Secure the Fan using 2 screws M6×16 on both sides and the Phillips screwdriver 2. Plug AC power lead. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 3. Fan DC version has power cable embedded in chassis. Note: Red is for positive; Black is for negative. There are labels at cable ends to distinguish positive or negative pole. Note: Connect “+” to a high potential (+48VDC from a +48VDC power supply; 0VDC from a -48VDC power supply) Note: Connect “-” to a low potential (0VDC from a +48VDC power supply; -48VDC from a -48VDC power supply) Warning: The fan has no reverse polarity protection.
MID POWER 4 x 37dBm Output 5G NR Compli Wall Installation To install the Access Unit on the wall: 1. Rotate the handles 90°and attach them at the rear of the A2, using 4 screws M3×6 per bracket and the Phillips screwdriver. Observe the orientation of the brackets. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 2. Mark 4 x ∅6.8mm drilling holes sites for the hanger to be attached to the wall. 3. Drill 4 holes at the marked sites using percussion drill and embed 4×∅10 plastic expansion pipes. Note: H=70mm. Fasten the case with 4×M6 expansion bolt. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 4. Connect and lock the power cable at the A2 rear side 5. Connect and screw the ground wire at the A2 rear side Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli A2 Mounting Dimension Spacing Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli RF Connection The RF interface between the Access Unit and the service provider signal source (or CrossFire CPOI) is provided by duplex connections on the Active Combiner module. To route and connect the coaxial cables to the Access Unit: 1. Obtain the required lengths of high performance, flexible, low loss 50Ω coaxial cable for all coaxial connections and route the cables from the signal source or CPOI to the Active Combiner module. 2.
MID POWER 4 x 37dBm Output 5G NR Compli Mount the E2-O in the Rack E2-O Accessories E2-O Accessories Note: the ground wire of E2-O is 12AWG and 2 meter in Accessories package. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Attach E2-O Handle 1. Attach the 19" mounting brackets at the front of the E2-O, using 4 screws M3×16 per bracket and the Phillips screwdriver. Observe the orientation of the brackets. 1. Attach the sliding rails Ⓑ to the rack Attaching a 19" Mounting Bracket Attach Sliding Rails and E2-O to Rack Note: the sliding rails are not included in the delivery. Attached Sliding Rails 2. Place the E2-O in the rack 3.
MID POWER 4 x 37dBm Output 5G NR Compli For rack installation, it is highly recommended to use a fan tray in the middle of 2 adjacent E2-O for cooling. Keep 2U separation of 2 E2-O if there is no fan for cooling. Note: It will reduce service life if E2-O is continuously working in environment of high temperature. Separation of Adjacent E2-O Connect Power and Ground Cable to E2-O 1. Connect and lock the power cable at the rear of the E2-O. 2. Connect and screw the ground wire at the rear of the E2-O.
MID POWER 4 x 37dBm Output 5G NR Compli Mount the E2-O on the Wall Attach Handle to E2-O Attach the 19" mounting brackets to the rear of the E2-O, using 4 screws M3×16 per bracket and the Phillips screwdriver. Observe the orientation of the brackets. Attaching a 19" Mounting Bracket Mount E2-O to Wall 1. Hold the E2-O to the installation location and mark the position of the 4 mounting holes in the mounting brackets; see arrows in the picture. 2.
MID POWER 4 x 37dBm Output 5G NR Compli Connect Power and Ground Cable to E2-O 1. Connect and lock the power cable at the rear of the E2-O 1. Connect and screw the ground wire at the rear of the E2-O Connect power cable at the rear of the unit Connect ground cable at the rear of the unit Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli E2-O Mounting Dimension Spacing Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Installing the Mid Power Remote Unit (M2RU) Accessories List Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Wall Installation (Back on the Wall) 1. Attach and fasten the handle to the side of M2RU with screws M6×14 using T5 Wrench. 2. Attach and fasten the Bracket I to the back of M2RU with screws M6×14 using T5 Wrench. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 3. Mark the position of the drilling holes in the mounting Bracket II. Note: R=13mm. 4. Drill 4 holes at the marked positions. Note: H=70mm Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 5. Attach the dowels, expansion screws or the like and fasten the Bracket II to the wall. Tips: use Bracket II as a reference to control each devices’ separation distance before hanging and locking M2RU up. 6. Hang the M2RU on the mounting bracket II and fasten with nuts M10. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 7. Fasten the Bracket I and II with screws M6×14. 8. Connect and lock the power cable at the M2RU rear side Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 9. Connect and screw the ground cable at the M2RU’s left side Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Wall Installation (Side on the Wall) 1. Attach and fasten the handle to the side of M2RU with screws M6×14 using T5 Wrench. Figure 1. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 2. Attach and fasten the Bracket I to the left side of M2RU with screws M6×14 using T5 Wrench. 3. Mark the position of the drilling holes in the mounting Bracket II. Note: R=13mm. 4. Drill 4 holes at the marked positions. Note: H=70mm. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 5. Attach the dowels, expansion screws or the like and fasten the Bracket II to the wall. Tips: use Bracket II as a reference to control each devices’ separation distance before hanging and locking M2RU up. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 6. Hang the M2RU on the mounting bracket II and fasten with nuts M10. 7. Fasten the Bracket I and II with screws M6×14. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Pole Installation 1. Install the handle and Bracket I to the back of M2RU. 2. Install the bracket II and Bracket III to the pole. 3. Hang the M2RU on the mounting bracket and fasten with nuts M10. 4. Connect the ground cable and power cable. Note: The diameter of Pole shall not be over 110mm or less than 55mm. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli M2RU-PSU48S Installation Accessories Equipment Mounting Brackets x 2 AC Input Power Lead x 1 / 1.8m DC Output Power Lead to Equipment x 1 / 0.25m Various Screws used for Mounting on Equipment: 4 x M6x12 hexagon socket head screw 6 x M4x10 pan head combination screw Note: the M2RU-PSU48S is not included in M2RU package. It needs to be purchased separately. Installation Procedure 1.
MID POWER 4 x 37dBm Output 5G NR Compli 2. Fasten the to the Bracket II with screws M6x12 using T5 wrench. 3. Connect and screw power cable to DC OUT port of M2RU-PSU48S and input port of M2RU. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli 4. Connect and screw power cable to AC PWR of M2RU-PSU48S. 5. Installation is completed as the following figure. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli M2RU Mounting Dimension Spacing Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.
MID POWER 4 x 37dBm Output 5G NR Compli Optical Connection Optical Transceiver Module Single Port Bidirectional SFP Transceiver The Figure below shows a pair of single port Bidirectional SFP transceivers. For devices optical connection, the transceivers of two sides must be paired - the wavelength of one side is 1271nm, and the wavelength of another side is 1331nm. Otherwise, it will fail the connection. All lower-level devices under this port won’t be working in the system.
MID POWER 4 x 37dBm Output 5G NR Compli Optical Indicator Each pair (2) of optical module cages has four LED indicator arrows. The two on the left are green, and the two on the right are red, as shown in Figure below. The indicator arrows represent the synchronization status of the upper and lower optical modules. When a pair of optical modules are synchronized (both uplink and downlink), the indicators turn green as shown in the right pair of indicators in Figure below.
MID POWER 4 x 37dBm Output 5G NR Compli A2 Optical Port Description Obtain the required lengths of optical fibers for all the optical connections and connect the fibers on the front panel of Access Unit. The interface type of SFP transceivers is an LC connector. It is important to label all ports on the fiber distribution panel correctly. It is recommended to include additional length/slack in the optical fiber to allow future re-configurations without requiring additional splices.
MID POWER 4 x 37dBm Output 5G NR Compli It is important to label all ports on the fiber distribution panel correctly. It is recommended to include additional length/slack in the optical fiber to allow future re-configurations without requiring additional splices.
MID POWER 4 x 37dBm Output 5G NR Compli RU Optical Port Description Obtain the required lengths of optical fibers for all the optical connections and connect the fibers on the front panel of Remote Unit. The interface type of SFP transceivers is an LC connector. It is important to label all ports on the fiber distribution panel correctly. It is recommended to include additional length/slack in the optical fiber to allow future re-configurations without requiring additional splices.
MID POWER 4 x 37dBm Output 5G NR Compli SN Interface Name Description 11 DEBUG Connection for local PC through CAT-5 for local monitoring 12 ALARM Reserved 13 RET Tunable Antenna Interface 14 PWR Electrical Power Line Interface FCC Warning: This device complies with Part 15 of the FCC Rules.
MID POWER 4 x 37dBm Output 5G NR Compli the following measures: —Reorient or relocate the receiving antenna. —Increase the separation between the equipment and receiver. —Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. —Consult the dealer or an experienced radio/TV technician for help. Contact us today: www.sunwave.com cf_support@sunwave.com © Sunwave IM_CF_M2 v2.0.