User's Manual

Bezel Cable
General Information
The eChoice Bezel Kit has been designed to add a cashless payment
system to a Series 2600 or Series 2700 MEI note validator. These note
validators connect to the vending machine using the MDB interface.
The eChoice Bezel replaces a VFM bezel.
1. Turn OFF
power.
2. Unplug the Validator’s MDB cable from vending machine chain.
3. Remove the note validator from the vending machine.
(Four (4) - 11/32” nuts hold the validator in the machine).
To remove the old bezel from the validator:
1. Remove the three or four phillips screws (A) located on the front of
the bezel.
2. Slide the PCB cover ¼ inch towards the top of the validator and lift it
off.
3. Remove the old bezel and mounting plate. If you are removing a
High Visibility or 3 in 1 Bezel, carefully disconnect the ribbon cable
from the validator circuit board before lifting the old bezel off.
Series
2700
Latch Pull down with
your finger nail or screw driver.
4. Place the new mounting plate and the eChoice Bezel on the note
validator, and tighten the screws. The ground wire should be
connected to the mounting plate under bezel and out of view.
5. Be careful not to pinch or damage the bezel cable when installing the
eChoice Bezel.
6. Re-install the PCB cover.
7. Remount the note validator in the vending machine.
(Four (4) - 11/32” nuts hold the validator in the machine).
8. Plug in the MDB cable from the Validator into the Vending machine
MDB chain.
9. Plug the eChoice Bezel cable into the Advance 5000 Bezel Socket.
See the Advance 5000 manual for installation instructions.
eChoice
Bezel Kit
Installation Guide

Summary of content (2 pages)