Instructions / Assembly

ROOF STARTER FLASHING
INSTALLATION GUIDELINES
These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional, and to
check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
1/32"
Over Driven
Begin installation along the eaves, starting at a corner and working your
way around. Hold the flashing tight against the fascia. Overlap each
succeeding piece of roof starter flashing by 2-3 inches.
After the roof starter flashing has been installed, apply the underlayment
and/or ice-water barrier.
Depending on local building codes and wind conditions, roof starter flashing
is typically nailed every 16".
½ in.
MINIMUM
½ in.
MINIMUM

Summary of content (1 pages)