Chapter 3
Before you install
About this chapter
This chapter explains steps to take before installation and contains these sections:
• Site planning and construction
on page 51
• Planning the network
on page 51
• Receiving all shipping and materials
on page 52
• Electro static discharge and GR-1089 compliance
on page 52
• Safety Recommendations and Warnings
on page 52
Site planning and construction
Before installation, the site planner or installation manager must read the IP-RN 8000 Site Planning
Guide. This guide explains all site requirements that must be met for a successful installation.
These requirements include the following:
• Site construction, including the concrete pad or equivalent pad or floor that meets loading
requirements
• Power supply
• Grounding infrastructure
• Backhaul link(s)
• Power and backhaul conduits
• Antenna configuration
• Global Positioning System (GPS) antenna(s)
• Primary external lightening/surge protection equipment
Planning the network
The network has to be planned. Network planning includes radio network planning, backhaul
infrastructure planning, and IP address/network planning.