HCO, Inc. Architects DOCUMENT 009113 ADDENDA ADDENDUM NUMBER 5A DATE: October 8, 2013 PROJECT: First Baptist Church of Highland Park PROJECT NUMBER: 89-0908 OWNER: First Baptist Church of Highland Park ARCHITECT: HCO, Inc. TO: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated February 10, 2011 with amendments and additions noted below. Acknowledge receipt of this Addendum in the space provided in the Bid Form.
HCO, Inc. Architects AV5.12 VIDEO RACK DETAILS 10/07/2013 AV5.13 VIDEO RACK DETAILS 10/07/2013 AV5.14 VIDEO RACK DETAILS 10/07/2013 AV6.00 TECHNICAL POWER DETAILS 10/07/2013 AV6.02 VIDEO JUNCTION BOX SCHEDULE 10/07/2013 AV7.50 VIDEO SCHEMATICS 10/07/2013 AV7.51 VIDEO SCHEMATICS 10/07/2013 AV7.52 VIDEO SCHEMATICS 10/07/2013 AV7.53 VIDEO SCHEMATICS 10/07/2013 AV7.54 VIDEO SCHEMATICS 10/07/2013 AV7.55 VIDEO SCHEMATICS 10/07/2013 AV7.56 VIDEO SCHEMATICS 10/07/2013 AV7.
HCO, Inc. Architects DRAWING AV1.53 – AUDIO/VIDEO SYSTEMS ENLARGED PLAN VIEWS BANQUET HALL 7. Replace sheet. DRAWING AV1.54 – VIDEO PRODUCTION PLAN VIEW LAYOUT 8. Replace sheet. DRAWING AV3.03 – AUDIO/VIDEO SYSTEMS SECTIONS BANQUET HALL 9. Replace sheet. DRAWING AV4.53 – AUDIO/VIDEO SYSTEMS ENLARGED RCP BANQUET HALL 10. Replace sheet. DRAWING AV5.03 – AUDIO PANELS 11. Replace sheet. DRAWING AV5.11 – VIDEO RACK DETAILS 12. Replace sheet. DRAWING AV5.12– VIDEO RACK DETAILS 13. Replace sheet. DRAWING AV5.
HCO, Inc. Architects DRAWING AV7.55 – VIDEO SCHEMATICS 23. Add sheet in its entirety. DRAWING AV7.56 – VIDEO SCHEMATICS 24. Add sheet in its entirety. DRAWING AV7.57 – VIDEO SCHEMATICS 25. Add sheet in its entirety. DRAWING AV7.58 – VIDEO SCHEMATICS 26. Add sheet in its entirety. DRAWING AV7.59 – VIDEO SCHEMATICS 27. Add sheet in its entirety.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 1 GENERAL 1.1 GENERAL REQUIREMENTS All requirements under Instructions to Bidders, General Conditions, Supplementary Conditions, Special Conditions, Division One (1), Technical Specifications, Referenced Documents or Practices and any Addenda of these Specifications shall be a part of this section.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 2 System features or devices which are mentioned in one part of the Contract Documents may not be shown in the other. In case of conflict between the written specifications and the drawings, Contractor must seek clarification from the Consultant. In the event that the Contractor fails to obtain such clarification, the interpretation of the Consultant will prevail.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 3 Provide and install all cabling necessary to complete the full scope of work for all equipment provided and designated owner furnished pieces of equipment. Provide termination in the Video Production Room, Production Rack Room, Edit Suites, Audio Recording, and Sound Reinforcement Booth of all cable types from throughout the facility as relate to the contracted scope of work.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) 1. Page 4 Submitted as a multi-sheet PDF document with: a. 42" X 30" sheets b. Table of Contents. c. Bookmarks for every sheet with Sheet Name and Number LCD Flat Panel locations, orientation, and mounting methods. Custom Console Diagrams with overall dimensions including production switcher control panel and CCU control panel integration. Rack/Furniture Layout and Location Diagrams with overall dimensions.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 5 Provide a Schedule of Values with unit prices for all systems. Schedule of Values will be used for any add or deduct Change Orders. Bid responses without Schedule of Values will be returned without review. Bidding Contractor will submit spreadsheet formatted by specification section indicating manufacturers, model numbers, descriptions, total quantities, unit costs, and extended costs. Attach Schedule of Values at end of bid form.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 6 All warranty cards for all equipment shall be given to the owner in one folder without hole-punches or staples. For equipment that will be installed and access to read the serial number will be difficult or impossible, the contractor shall fill in the appropriate warranty card before installation. System Remote Controls All wireless/wired remotes for displays, VTRs, etc. to be collected and stored in or near production room.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 7 PRODUCTS 2.1 UNAUTHORIZED MATERIALS Materials and products required for work of this section will not contain asbestos, polychlorinated biphenyls (PCB) or other hazardous materials identified by the General Contractor. All devices and control stations will be UL Certified with attached identification label.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 8 2.4 PRODUCTION CAMERAS Contractor shall be responsible for the integration of camera components into complete and balanced systems. Camera Systems are to be ready prior to commissioning. Contractor to provide 11-step Grayscale chart with center true black, 16:9.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) 1. 2. 1. 2. 2.6 Page 9 Contractor shall assure that all internal system components and the latest software versions to support all options are installed and/or configured by the manufacturer or manufacturer’s rep. A tally system shall be integrated between the production switcher and all video monitors and CCU’s in the production room (RED and GREEN). RED will represent only a Program “take” from MLE 2, and GREED from MLE 1 .
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 10 2.8 A. 2.9 PRODUCTION CG SYSTEM Character Generation System 1. Contractor shall assure that all internal system components and software are installed and/or configured by the contractor, manufacturer, or manufacturer’s representative. 2. Contractor shall assure provision of manufacturer recommended WIRED Keyboard and Mouse. a. Renewed Vision Pro Presenter Presentation System: b.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 11 3. 4. 5. 6. 7. B. a. Rode NTG1 (Qty: 2) b. Rode SM4 Mounts (Qty: 2) DA a. Rane DA 216S (Qty: 1) Volume Control a. SMPro Audio NanoPatch Plus (Qty: 1) Speakers a. Adam Audio A7X (Qty: 2) Monitor a. Fostex RM-2 (Qty: 1) Isolator a. Jensen JT-11P-1 (Qty: 2) INTERCOM 1. Contractor will construct 1RU RPV-01, RPV-02, and RPV-03 per Video Panel Details. 2.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 12 2.11 CONTROL SYSTEM A. Contractor to provide programming of Crestron system per owner’s instruction. The programming and GUI design shall allow for basic operations of each product that is controllable and connected to the Control LAN system. B. Contractor shall provide a complete flow diagram with screen captures of the control system in single file multi-sheet PDF for approval by the Consultant prior to installation. C.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) I. 2.12 Page 13 7) Volume up/down 8) Channel up/down 9) 10-Digit Keypad c. DVD Recorder 1) Power On/off 2) Menu 3) Up/down/left/right arrows 4) Enter (OK) 5) End (Exit) 6) Transport Control (FF, RW, Next Chapter, Pause, Stop, Play, etc.) 7) Record (where applicable) 8) Finalize (where applicable) Tablet Control 1. Contractor will furnish one iPad new and sealed.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 14 2.13 NETWORK Contractor shall provide for a complete, independent network to connect all IP enable hardware include in 27.41.30. Network will include multiple VLANs, DHCP, and wireless access and will be configured as standalone unless client IT department requires different. Contractor will configure all hardware in 27.41.30 into one Control VLAN, and coordinate with 27.41.36 to connect all 27.41.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 15 Ross Video power supplies to make both redundant (Qty: 2) Network Card (Qty: 2) 3. Cards Ross UDA-8705A w/R2 (Qty: 3) Cobalt Digital 9003 (Qty: 5) Cobalt Digital 9001 (Qty: 1) Blackmagic Design CONVOPENGCAUDS Audio to SDI (Qty: 1) E. Video Patch Bay 1. SDI signal patch point label font is to be colored blue and analog signal patch point label font is to be colored green. a. Bittree B64T-1MWNHD (Quantities Per Design) b.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) 1. 2. 2.15 Page 16 The Contractor shall insure that flexible, portable, field-grade cables are provided that feed from the floor/wallbox to the camera head. No installation grade cables may be used outside of conduit. AC Contractor to provide Camera cables with Neutrik OpticalCON Duo at box end, and Hitachi compatible SMPTE Lemo connection at camera end. a. 25’ (Qty: 2) b. 50’ (Qty: 1) MATV EQUIPMENT A.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 17 5. 2.16 a. Chief Manufacturing MTTU for 42” (Qty: 4) b. Chief Manufacturing LSTU for 55” (Qty: 1) Converters a. AJA Hi5 (Qty: 1) b. Global Cache IP2SL (Qty: 5) VIDEO PROJECTION EQUIPMENT Video Projection System Contractor shall verify all site conditions, and ascertain final unit location and distance from screen.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 18 Video Systems Installer to provide one (1) local single rack mounted rocker switch power on/off controls for all components located within the Engineering Rack locations. Refer to AV5.11 through AV5.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 19 Coordinate finish with FOH audio racks. Sound Construction & Supply R5-1-ST-14D-X-V rack NO slant (Qty: 1) Middle Atlantic RK12 with RKW kit (Qty: 1) Furman D10-PFP (Qty: 2) 2.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 20 Panel Authority Proco RCI Whirlwind 2.21 CABLE, CONTROL WIRING & TERMINATIONS Electrical conductors installed under this contract, except where otherwise specified, will be soft drawn annealed stranded copper having a conductivity of not less than 98% of pure copper. Video Connectors: All primary video equipment will use crimp-on style BNC connectors.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 21 Signal Type HD Video SDI Video Composite Video Bi-Level Sync/Reference Tri-Level Sync/Reference V-TIE (multi-use) Camera Copper Camera Cable Analog Audio Digital Audio (AES) Time Code RF (Distributed) RF (Trunk Line) Tally RS-232/422/485 Control Network 10/100/1000 Network Facility LAN KVM Intercom Color Violet Blue, Light Green Red Orange Grey Black Green Yellow White White Black Chrome Chrome Yellow Blue Green, Dark Brown All
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 22 EXECUTION 3.1 GENERAL Coordinate work with other trades to avoid causing delays in construction schedule. Coordinate with General Contractor and verify that all dust, dirt, and debris is removed from all production rooms including Video Control and Projection rooms prior to any equipment installation. Video contractor to ensure projection glass is cleaned on both sides with manufacturer approved cleaning materials.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 23 Each equipment rack will have sufficient power outlets to provide an outlet for every power cord required by installed equipment or equipment designed for future installation. The A/V system technical ground shall be bonded to the metal frame of all equipment racks by use of an uninsulated ground buss lug or bar mounted in each rack.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 24 Clearances: There will be a minimum of 1 inch clearance inside all consoles between the top equipment mounting space and the console top. This is to allow airflow above equipment mounted in the top mounting position. Provide adequate ventilation grilles to allow continuous cooling in consoles containing equipment. This should include both supply and exhaust grilles.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 25 If required, tally, GPI, or relay wiring entering equipment racks may connect via terminal blocks (Cinch 140 - 142 Series) or on Entrelec blocks; terminal blocks will be fully exposed, labeled, and mounted on 3/4 inch plywood board painted flat black. If Qty of terminals is too numerous to fit in rack, terminal blocks may be located on wall mounted plywood terminal board adjacent to rack.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 26 This is only applicable to stranded conductor wires. Solid conductors will be attached directly to the barrier strip. All conductors will be stripped prior to installation underneath screws on terminals. Provide crimp lugs on stranded control cables, solid conductor wire will not require crimp lugs on individual conductors.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 27 Individual patch bay point labels to include alphabetic representation of patch bay row and numeric representation of patch point in row, as well typical device I/O abbreviation. Cable Labels Cables and wiring to be logically, legibly and permanently labeled for easy identification. Labels on cables to be adhesive strip type covered with clear heat-shrink tubing.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 28 Electronic devices are properly grounded. Powered devices have AC power from the proper circuit and hot, neutral, and ground conductors are connected correctly. Insulation and shrink tubing are present where required. Dust, debris, solder, splatter, etc. is removed. Cable is dressed, routed, and labeled; connections are consistent with regard to polarity. Grounding System Tests.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 29 The total attenuation budget for each fiber cable length (end-to-end) shall equal the allowed attenuation for the fiber (0.2 dB per km times the length in km) plus the attenuation for each splice and connector. For example, a cable length of 3 km with 1 splice and 2 connectors would have an attenuation budget of (3 km x 0.2 dB/km) + (2 x 0.2 dB) = 1.2 dB.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 30 Report transport layer errors RGB-HV. 0.707 to 1.0 volt maximum throughout RGB video signal path. to 1.414 volt maximum throughout HV sync signal path Control functions shall be checked for proper operation, from controlling devices to controlled devices. Adjust, balance, and align equipment for optimum quality and to meet the manufacturer's published specifications.
Project #2008377 VIDEO PRODUCTION SYSTEM Section 11130 (or 27 41 30) Page 31 Training will be provided in a series of classes to operations personnel to review all aspects of operation and maintenance of the system. Follow-up sessions to better enhance the operator's ability to expand or maximize the system will be made available. The system training will include 2 day(s) of technical training covering the explanation of the system, including documentation, configuration, interfacing and diagnostics.
Project NOMINAL OD (IN) SIGNAL GROUP 1 PR #10 AWG, THHN Stranded Pair 0.21 C Speaker 1 PR #12 AWG, THHN Stranded Pair 0.18 C 227 Speaker 1 PR #12 AWG, Stranded, Twisted, PVC Jacket 0.317 C Belden 9451 Line Level Audio 1 Shielded PR #22 AWG, Stranded, Twisted, PVC Jacket 0.138 B E Belden 9451 Mic Level Audio 1 Shielded PR #22 AWG, Stranded, Twisted, PVC Jacket 0.138 A F Belden 7810A Antenna 50 Ohm Coax, #10 AWG, RG-8 0.
Project 16 STAIR 04-02 DN LOUNGE 144 04-02B ROBING ROOM 2 153 04-02C 21 20 18 04-02A 161B 154A ELECTRICAL 156 FIN. FLOOR +1'-6" STAIR 01-02 WASHER/ DRYER 155 155A 156A 160A LOBBY 157 PLATFORM 162 DN DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com 153A 152A 152B 151B 159A 21 UP 150A UP COMM. PREP.
Project AMP ROOM DIMMER ROOM 204 205 204A 205A CORRIDOR 213 ORGAN CHAMBER ORGAN CHAMBER 206 212 206A 213A 212A 35 +13'-4" DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.
Project UP UP 145 DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com 3'-9" 64" x 28.
Project 142A STAIR 05-02 BAPTISTRY EQUIPMENT 164 151A 05-02A 164A DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com -1'-7" 3'-10" 8' -1'-0" 5 -1'-0" 51 . AV1 1" = 1'-0" 3 AV 1 1.5 63 63 6 108 6801 SHERIFF ROAD LANDOVER, MARYLAND 20785 AV1.51 108 1/4" = 1'-0" 05-02B RAMP 151 1-1/2" = 1'-0" 142A STAIR 05-02 2'-6" 2'-3" BAPTISTRY EQUIPMENT 164 151A 05-02A No.
Project 066A 065A CORRIDOR 074 040B 071A 019A CLOSET 038 070A STORAGE 069 021J 069A OFFICE 071 PRIVATE DINING 073 CABLING NOT IN SCOPE 073B 07-01A CABLING NOT IN SCOPE 021H UP STAIR 06-01 WOMENS RR 035 021G 023A 023B DRESSING ROOM 033 034A MENS RR 034 STAIR 07-01 STAGE 023 031A 035A DRESSING ROOM 036 036A CURTAIN CONTROL 024A 024 033A DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 030A www.acousticdimensions.
Project PRODUCTION/ ENGINEERING/ SHADING 113 29 PRODUCTION/ NLE 115 NLE 2 115A VIDEO PRODUCTION Refer to Schematics for TBD conduit fill. CORRIDOR 111 112A DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.
Project LEFT/RIGHT PROJECTION ON LIFT NOT IN SCOPE CENTER PROJECTION 7" 7" 9" 6801 SHERIFF ROAD LANDOVER, MARYLAND 20785 DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com 3/8" = 1'-0" 13'-1" (LENGTH OF CASE) 14'-6" (LENGTH OF CASE) 13'-1" (LENGTH OF CASE) NOT IN SCOPE NOT IN SCOPE 6'-6" 6'-6" 6'-9" 11'-7" 11'-7" 12' No.
Project CLOSET 038 070A OFFICE 071 PRIVATE DINING 073 021J 069A 073B 021H 07-01A UP STAIR 06-01 021G STAIR 07-01 STAGE 023 023A 023B DRESSING ROOM 033 034A MENS RR 034 CURTAIN CONTROL 024A 024 NOT IN SCOPE NOT IN SCOPE 033A DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com CORRIDOR 031 SCULLERY 032 FIN.
Project NOT IN SCOPE DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.
Project DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.
Project DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com 4/2 RU 4/2 RU 6801 SHERIFF ROAD LANDOVER, MARYLAND 20785 AUDIO MIXER Audio Recording Blank Blank TSC-101 Blank DVD Recorder Toshiba What's Available Blank Blank Blank INTERCOM PANEL INTERCOM PANEL DVD-101 Blank RPV-02 RPV-02 No.
Project Blank Blank Blank Blank Blank Misc MATV Equipment Blank Blank Combiner Blonder Tongue HPC-8 6801 SHERIFF ROAD LANDOVER, MARYLAND 20785 DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.
Project 6801 SHERIFF ROAD LANDOVER, MARYLAND 20785 DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com MAC-103 Apple iMac 21.5 Computer LCD-103 Ikegami HLM-905WR Router Control Panel Blackmagic Design Smart Controller RTP-103 Description 3.
Project Description Breaker Br Type Load (W) Load (W) Br Type Breaker Description Breaker # Breaker # Description Breaker Br Type Load (W) Load (W) Br Type Breaker Description Breaker # 1 TP1-1: SANCTUARY AUDIO RACKS 20 M 200 A 400 M 20 TP1-2: SANCTUARY AUDIO RACKS 2 1 TP2-1: SANCTUARY STAGE 20 U 800 A 800 U 20 TP2-2: SANCTUARY STAGE 2 3 TP1-3: SANCTUARY AUDIO RACKS 20 M 900 B 800 M 20 TP1-4: SANCTUARY AUDIO RACKS 4 3 TP2-3: SANCTUARY STAGE 20 U 800
Project DRAWING REFERENCE LOCATION BOX/DEVICE SIZE (H X W X D) BOX/DEVICE DESCRIPTION MOUNTING HEIGHT SIGNAL TYPE BACK BOX PROVIDED BY BACK BOX INSTALLED BY PANEL PROVIDED BY PANEL INSTALLED BY DEVICE PROVIDED BY DEVICE INSTALLED BY NOTES VIDEO PRODUCTION VR-01 AV1.54 VIDEO ENGINEERING RACK 83.125" X 22" X 31" MIDDLE ATLANTIC VRK-44-31H FLUSH ON FLOOR VIDEO AV AV VR-02 AV1.54 VIDEO ENGINEERING RACK 83.
Project FOR ALL CCUs: The following CCU connectors can use Winford DIN breakout boards: Tally: Winford RK9M-R-DIN RS232: Winford BRK9M-R-DIN Mic Remote: Winford BRK15M-R-DIN Comm: Winford BRK25M-R-DIN Video Rack Room Worship Center P/O JBV-201 Fiber Prod Camera Video Rack Room HMPF HMPF PATCH PASS-THRU In In Hitachi Z-HD6000 P/O FBV-103 Gepco GHF92NTK-25-P 1 CCU-101 Hitachi CU-HD500 CCU Camera CAM A SMPTE 304M Camera Cable AV7.
Project In Out GEN-101 Ensemble Designs Brighteye 56 Singal Generator In Out MAC-102 Apple MAC Mini Utility Computer Keyboard w/ trackball ortrack pad in slide out shelf AV7.57 Fm:ESW-101 To:MAC-101 LAN RJ45 AV7.58 Fm:COMB-101 To:HDTV-108 HDMI In RF F HDMI HDMI HDMI Out HDTV-108 LG 22LN4500 HDTV 22" In USB Out USB-101 TBD TBD USB 3 Hub USB USB USB USB In L/R Audio In 1 1/8" RCA USB In 2 USB RCA Fm:USB-101 To:RTR-101 AV7.
Project All Sources will feed Router, all Destinations will be fed by Router AV7.50 Fm:HDDA-101 To:RTR-101 Cam1 AV7.50 Fm:HDDA-101 To:RTR-101 Cam2 AV7.50 Fm:HDDA-101 To:RTR-101 Cam3 AV7.50 Fm:HDDA-101 To:RTR-101 POV AV7.
Project In In Mic-101 Rode NTG1 Microphone Mic-102 Rode NTG1 Microphone Out MIX-101 Soundcraft Expression 1 Digital Mixing Console Out Mic XLR3-M Out AV7.06 XLR3-M Fm:FOH To: Mix XLR3-M Mic XLR3-M AV7.06 Mount with (2) Rode SM4 shocks mounts. Location TBD AV7.06 AV7.56 Fm:Audience To: Fm:Audience To: L/R L/R Fm:SW-102 Audio To:MIX-101 AV7.
Project DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.com Video Production Video Rack Room AV7.52 Fm:RTR-101 To:CVTR-101 In In In Out HD-SDI YPbPr YPbPr BNC BNC(3) BNC(3) HDTV-101 LG 42LN5700 LCD Display AV7.57 In AV7.52 Out CVTR-101 AJA HD10C2 SDI to YPbPr Fm:RTR-101 To:CVTR-102 Fm:CTR-101 To:HDTV-101 WPV-102 AV7.52 Fm:RTR-101 To:PROJ-101 HD-SDI AV7.
Project FOH Booth - Audio Front Video Console AV7.
Project Stage FOH Video DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.
Project In ESW-101 Netgear GS724T-300 Network Switch Out In In LAN LAN RJ45 RJ45 Out POE-101 Crestron +POE PWE-4803RU RJ45 POE Injector RJ45 RJ45 In Out TAB-101 Apple iPad 16GB Tablet 7" 7" DALLAS NEW YORK SAN DIEGO UK 15508 Wright Brothers Drive Addison, Texas 75001 972.239.1505 www.acousticdimensions.
Project Video Rack Room Existing In Headend F-Con RFISO-101 Jensen VRD-1FF RF Isolator Out In Out SPLT-101 Blonder Tongue SXRS-3 Splitter Out In RFISO-102 Out Jensen VRD-1FF RF Isolator In F-Con F-Con In Out * Amps/Taps/Splitters As Needed * In AV7.52 Fm:RTR-101 To:MOD-101 Out CVTR-105 AJA Analog HD HD-SDI BNC In 1 V2ANALOG YPbPr YPbPr AV7.
Project BANQUET HALL VIDEO AV CONTROL BOOTH BANQUET CENTER PROJECTION In P/O WPV-305 AV7.52 Fm:RTR-101 To:BQT Hall VTIE-xx SDI BNC-F BNC-M CVTR-301 Out AJA Hi5 Converter In Y Pb SW-301 Out Extron IN1608 Graphic Switcher P/O WPV-305 Pr AV7.