User Manual Chapter 2

Chapter 2 - 1
Click on this icon for an Acrobat Reader
printable/viewable version of this chapter.
CPE INSTALLATION MANUAL Chapter 2
revision 0.3
Software Version 0.9.7
TOPICS:
Site Requirements
Clearwire
TM
Site Survey Sheet
Required Tools and Equipment
Cable Selection
SITE REQUIREMENTS:
General. Each subscriber site must meet the following criteria:
Located within the ISP Direct coverage area (this can be determined by the network manager using the
Network Propagation Tool).
Has a suitable location for antenna mounting (usually a rooftop or tower with Line of Sight (LOS) to the
base station.
Provides a suitable location for the IDU for connection to the customer LAN, with standard power outlet
(95-250VAC, 47 - 63 Hz) available.
Initial Site Check. The ISP Direct network manager performs the initial site check using the Network Propagation
Tool. If the subscriber site is within the coverage area, the network manager provides the following information to
the installer:
Bearing and range from subscriber site to base station.
Probable antenna type.
Site Survey. The installer performs a site survey with the appropriate client contact. You’ll need permission from
the building manager or owner regarding the antenna and IDU locations, and the RF cable run between the two.
Record the appropriate information on the Clearwire
TM
Site Survey Sheet.
1. Identify the IDU installation location. Keep in mind these considerations:
a. There must be an AC outlet within 6 feet.
b. The RF cable must be run to the outside antenna.
c. The IDU must be connected to the customer’s LAN.
2. Identify the antenna installation location. Install the Outdoor Unit and Antenna for Compliance with FCC
RF Safety Regulations. The Outdoor Unit (P/N: 24001-2) is mechanically and permanently secured to the
antenna as one complete assembly. The whole assembly is, at all times, required to be installed on the
roof of the building pointing outward, or on an antenna tower located outside of the building. The
minimum height above the ground is twelve feet. The installation will be carried out, as mentioned, by
professional technical staffs according to Clearwire's installation procedures. Consider the following: