User Manual Chapter 2

Chapter 2 - 1
Click on this icon for an Acrobat Reader
printable/viewable version of this chapter.
CPE INSTALLATION MANUAL
Chapter 2 revision 2. 1 25-Sep-01
Software Version S2.3.0
TOPICS:
Site Requirements
Clearwire Site Survey Sheet
Required Tools and Equipment
Cable Selection
SITE REQUIREMENTS:
General. Each subscriber site must meet the following criteria:
Located within the Basestation coverage area (this can be determined by the network manager using the
Network Propagation Tool).
Has a suitable location for antenna mounting (usually a rooftop or tower, at a minimum of height of 3
meters ) with Line of Sight (LOS) to the base station.
Provides a suitable location for the IDU for connection to the customer LAN, with standard power outlet
(95-250VAC, 47 - 63 Hz) available.
Initial Site Check. The Clearwire network manager performs the initial site check using the Network Propagation
Tool. If the subscriber site is within the coverage area, the network manager provides the following information to
the installer:
Bearing and range from subscriber site to base station.
Probable antenna type.
RF EXPOSURE FOR ACCESSIBLE ANTENNA
WARNING: For compliance with the RF exposure requirements regulated by the FCC (Federal
Communications Commission), the separation distance of more than 2 meters shall be
maintained between the transmitter, and any part of the user’s body.

Summary of content (4 pages)