Questions? 949-266-7381 info@innvonitiz.com INSTALLATION INSTRUCTIONS FOR SHOWER DOOR AND BATHTUB DOOR IKSS-����-BN/MB IKSS-����-BN/MB IKSS-����-BN/MB IKSS-����-BN/MB ����.V �.
CKB shower Doors is not responsible for verifying State and local building code. Note: Aluminium top rail can be trimmed up to �”for width adjustment. If installation opening is smaller, the overlap of two glass panel is bigger, and the entrance size is reduced accordingly.
PARTS LIST A FOR SHOWER/BATHTUB DOOR 5 6 7 10 8 9 11 7 12 6 5 13 12 1 14 2 18 4 15 16 3 17 16 PACKING LIST Fixed Panel 1pc Fixed Panel Holders 2pcs Bottom Bracket 1set Gasket-A 1pc Wall Plugs-A 1pc Gasket-B 2pcs Screws ST4x1 3/8" 1pc Door Panel 1pc Wall Plugs-B 2pcs Handle 1pc Wall Brackets 2pcs Bottom Guide 1pc Screws ST5x2" 2pcs End Block 2pcs Rail 1pc Aluminium Water Guard 1pc Rollers 4pcs Allen Wrenches 4pcs �
INSTALLATION STEPS STEP � STEP � C 产品规格 A 1524×1930(60”x76”) 1524×1676(60”x66”) 1482mm A � C 100mm 24mm 1219×1930(48”x76”) 1372×1930(54”x76”) 1736mm B B 20
STEP � A A 5 8mm BITS L DRIL A Ø8 plugs Wall B 2 B 6mm BITS L DRIL Ø6 plugs Wall STEP � A 6 A 7 A B B 2 2 �
STEP � L-30 L STEP � A A 6 8 6 �
STEP � A A 1 A 10 B B 2 STEP � A 9 �
STEP � A 15 4 3 STEP �� A A B 12 B 11 12 � 14
STEP �� A STEP �� A 9 �
STEP �� A A-25 A 16 17 15 17 16 �
STEP �� 24 HOURS Allow 24 hours for silicone to dry before use.