User Manual

HEAVY DUTY
GENERAL PURPOSE
5 CHANNEL SYSTEM
ASSEMBLY:
• Inspect areas for safety hazards
• Assemble sections by aligning female connectors over male connectors
• Press with foot to secure female connectors to male connectors
• Open cover and install cables down into channels
• Close cover flush with base
• Test installation for intended use
• Periodically inspect installation
CHANNEL CAPACITY:
LOAD CAPACITY:
The Cable/Hose Protection System has different load supporting capabilities depending on type of vehicle and
temperature. Suitability must be verified by testing under actual conditions.
OPERATING TEMPERATURE:
-40
˚
F to 120
˚
F (-40
˚
C to 48
˚
C)
CHEMICAL RESISTANCE:
Tested for compatibility with common motor oils, gasoline and diesel fuel.
Limited resistance to brake fluids and other chemicals.
MATERIAL:
UV-stabilized polyurethane elastomer
NO. OF
CHANNELS
5 Channel
10,500
lbs. (4,763 kg)
LOAD CAPACITY PER TIRE
MAX LOAD 70
˚
F (21
˚
C)
21,000 lbs. (9,526 kg)
LOAD CAPACITY PER AXLE
MAX LOAD 70
˚
F (21
˚
C)
CABLE/HOSE MANAGEMENT COMPONENTS
ASSEMBLY INSTRUCTIONS
#ZIS-GP5
Ver: 2/11
CHANNEL CAPACITY - MAX. DIAMETER INCHES (mm)
1 Channel 1.3 in. (33 mm) width x 1.3 in. (33 mm) height
Simply interlock with
T-connectors to extend
protection length.
36" Lineal ProtectorEnd Cap End Cap Y Protector
GP-5

Summary of content (2 pages)