Installation & Assembly

19
Business Name:
Date: / /
(dd / mm / yyyy)
Site Address:
Suburb:
State: Zip:
Contact Name:
Position:
Ph: ( ) Fax: ( )
Cell:
How did you hear about our heaters?
Magazine Name: .....................................
Internet Website: ....................................
Word of Mouth
Newspaper Name: ..................................
Directory Name: ......................................
Salesperson
Purchased from us before
Seen on location Where: .......................
Other (please specify): ............................
..............................................................................
Gas Type (please tick): NG LPG
(i.e. does the gas come to the premises via
bottles [LPG] or pipes [NG])
Application (please tick):
Commercial Domestic
Description (eg. hotel):
Area dimensions (feet):
Length: Width:
Ceiling Height:
CLEARANCES:
Clearance requirements for Platinum and
Tungsten Smart-Heat heaters are as follows:
(Note: adequate clearance must be directly above the heater)
A) WALL MOUNT NO DEFLECTOR:
Minimum distance to combustible materials:
AB C
Platinum and Tungsten Smart-Heat
300
3.6’ / 110cm 3.6’/ 110cm 8’ / 244cm*
500
3.6/ 110cm 3.6/ 110cm 8’ / 244cm*
*Please refer to local authorities for any additional mounting guidelines
B) WALL MOUNT WITH DEFLECTOR:
Minimum distance to combustible materials:
AB C
Platinum and Tungsten Smart-Heat
300
1.15’ / 35cm 3.6/ 110cm 8’ / 244cm*
500
1.15’ / 35cm 3.6/ 110cm 8’ / 244cm*
*Please refer to local authorities for any additional mounting guidelines
C) CEILING MOUNT NO DEFLECTOR:
Minimum distance to combustible materials:
A BC
Platinum and Tungsten Smart-Heat
300
3.6 / 110cm 3 . 6 / 110cm 8’ / 244cm*
500
3 . 6 / 110cm 3 .6 / 110cm 8/ 244cm*
*Please refer to local authorities for any additional mounting guidelines
D) CEILING MOUNT WITH DEFLECTOR:
Minimum distance to combustible materials:
A BC
Platinum and Tungsten Smart-Heat
300
1.15 / 35cm 3.6 / 110cm 8/ 244cm*
500
1.15 / 35cm 3 . 6 / 110cm 8/ 244cm*
*Please refer to local authorities for any additional mounting guidelines
Is the heater adequately covered? Y N
(i.e. shielded from rain)
Is a protective cover required? Y N
(cover may be required for environmental
protection OR because of lower ceiling height)
Have site plans & digital photos been
provided? Y N
(NOTE: in order to more accurately review your heating
requirements and provide a valid recommendation,
a dimensioned plan and elevation views are required.
Please also provide digital photos of the area).
If site plans not available, draw a sketch of the area
showing all elevation views and open areas. Please
include an appropriate scale.
Do you require a:
Ceiling Mount OR Wall Mount
IF CEILING MOUNT:
Pole length required:
Ceiling material type:
IF WALL MOUNT:
Wall construction (wall material type)
Are there any wall obstructions? Y N
(eg. speakers, TV, camera, lighting etc...)
Please describe briefly:
Will the bracket be mounted directly
on the wall? Y N
(any additional mountings [eg. angle mount
bracket / pole] are the responsibility of the
installer)
Is adequate power available? Y N
(each heater requires 110V power and draws no more
than 1A).
Does the site have existing plumbing
for LPG or Natural Gas? Y N
Distributors Name:
Person performing Survey:
Position:
Date: / /
(dd / mm / yyyy)
PRE-INSTALLATION CHECKLIST
FOR PLATINUM AND TUNGSTEN SMART-HEAT GAS RADIANT HEATERS
PLEASE PHOTOCOPY, COMPLETE, & SEND THIS CHECKLIST BY:
FAX TO (858) 346-1388 or
BY MAIL TO Bromic Heating, 18 Technology Dr, #121 Irvine, CA 92618
or SCAN AND SEND BY EMAIL TO info@bromicheating.com
A
C
B
Min. mounting height
to ground
Pre-Installation Checklist

Summary of content (1 pages)