Installation Guide

Hang Kit
Part No. 4036695
Parts Included:
1. (4) Ratchet Straps
2. (2) Brackets
3. (4) Eye Bolts (3/8 x 3-7/8)
Tools Required:
Tape Measure
Level
Screw Driver (Phillips or Regular)
to use as leverage for Eye Bolts
Screws for TJI joists (only
applies if you have TJI joists)
Optional Tool:
Power Drill with 5/16" Drill Bit
(to pre-drill Eye Bolt holes)
1
2
3
CAUTION!
MAKE SURE THE UNIT IS LEVEL AFTER INSTALLATION.
OVER
Step 1: Gently tip the unit up on its back
end in order to have access to the bottom
foot holes.
Step 2: Secure the brackets in place by using the leveling feet and the
female threaded holes. (Leveling feet are packaged with the dehumidifier.)
Line up the pre-drilled holes on the brackets with the leveling feet holes on
the unit (Image A). Once lined up, screw in the leveling feet to secure the
brackets to the dehumidifier (Image B).
If installing the hang kit on the 70 pint unit, turn the brackets over and
secure them to the bottom of the dehumidifier using the pre-drilled holes
and leveling feet. (Image C).
There are four leveling feet to screw in on each dehumidifier.
Once in place, gently tip the unit back down on the leveling feet with the
brackets in place (Image D).
A.
B.
C. D.
Standard Joist Instructions
[SEE PAGE 3 FOR TJI JOIST INSTRUCTIONS]
TOLL-FREE 1-800-558-1711
www.Broan-Nutone.com
TS-1219 10/21 Rev A

Summary of content (3 pages)