E-Rack System Operation Manual Ver 1.0 Version MR E-Rack 5X3- BR-E-Rack-0001 Manufacturer and publisher Brillian Network & Automation Integrated System Co.,Ltd Add: No.41, Keyi St., Zhunan Township, Miaoli County 350, Taiwan, R.O.C. Tel: 886-37-580708 Fax: 886-37-580728 Email:services@brillian.com.tw Website:http://www.brillian.com.
Contents 1 2 3 4 5 6 7 8 Brief introduction of equipment ................................................................................................ - 1 Description of safety rule of MR E-Rack System ....................................................................... - 2 Description of starting steps ..................................................................................................... - 3 Description of stopping steps ................................................................
1 Brief introduction of equipment Brillian Material Handling Solution(BMHS) We provide a FAB semi-automatic material handling solution. Through a material storage devices, integrating the BMHS system and database, product locations and determine the transmission route, optimal throughput and increase productivity. eRack management collects all eRack status information, exchanges information on behalf of all eRacks and MES. Provides admin search queries, work order inquiries, statistical analysis, etc.
2 Description of safety rule of MR E-Rack System 2.1 Instruction for use。 2.1.1 This manual is only written for Purge System Module。 2.1.2 Non-qualified or non-professional personnel are not allowed to operate or maintain the machine。 2.1.3 “Operator” should read carefully the software operation in advance。 2.1.4 “Maintainer”, in addition to getting familiar with software operation, should read carefully the maintenance manual and circuit diagram。 2.1.
3 Description of starting steps 3.1 3.2 4 Turn on breaker power. Facility department is suggested to be AC 100~230V Description of stopping steps 4.1 Please use externally connected screen or remote control program to confirm all the ports Purge program are all in idle states. 4.2 After log in into the program, please select Quit to end the program. 4.3 Turn off breaker power. 4.4 4.5 Install lock for breaker and lock it. Close the gas source switch at the facility end.
5 Facility Requirement&SPEC E-Rack System Model Type BR-E-Rack-0001 Rating 100~230VAC, 50/60Hz, 1ɸ+PE Length X Width X Height(mm) 1192 X 355 X 1500 Weight 80kg Breaker electric current 6A Breaking capacity according to UL 10KA Frequency 134.2KHz 6 Product Name FCC Rules This device complies with Part 15 of the FCC Rules.
MR E-Rack 5X3 Module Illustration Front-1 Front-2 -5- Brillian Network & Automation Integrated System Co., Ltd.
MR E-Rack 5X3 Module 8.1 Front Illustration 8.2 Plate -6- Brillian Network & Automation Integrated System Co., Ltd.
8.3 Electric control box 8.4 Communication Layout -7- Brillian Network & Automation Integrated System Co., Ltd.
8.5 RFID PCB -8- Brillian Network & Automation Integrated System Co., Ltd.
9 MR E-Rack 5X3 Hardware 9.1 Hardware Method serial port AC Power Cable Breaker Power Supply B1H2C6(UL489) Current 6A AC100~230V To DC15V FUSE 10A RFID MF Reader 15 PCS Antenna Fotek Sensor Frequency:134KHz Gateway 10 MR E-Rack 5X3 Operation Description Put a POD fixed on the goods which you need to get goods information.
11 Periodical Maintenance 11.1 E-Rack Maintenance Table BR-E-Rack-0001 Maintenance Table Machine Tool: Item 1 2 Maintenance Content Clean Plate Reader Test □ Three months Cycle Date: Operator: Action Result Plate Clean Three months Use DI Water &Cleanroom wiper Clean Plate □OK □NG Three months Put the POD on Plate use button Check Reader Function □OK □NG Remark Remark: 11.2 Cleaning Plate 11.2.