ORION® Water Endpoint IMPORTANT: This manual contains important information. READ AND KEEP FOR REFERENCE. ORI-I-79 (11-11) 62014-144 Rev.
ORION® Water Endpoint Page ii 11-11
Installation Data CONTENTS Overview.................................................................................................................................................................... 5 Product Unpacking and Inspection......................................................................................................................... 5 License Requirements.....................................................................................................................................
ORION® Water Endpoint Page iv 11-11
Installation Data Overview This manual contains installation and programming instructions for the ORION® water endpoint. Proper performance and reliability of ORION endpoints depend upon installation in accordance with these instructions. Product Unpacking and Inspection Upon receipt of the product, perform the following unpacking and inspection procedures. NOTE: If damage to the shipping container is evident upon receipt, request the carrier to be present when the product is unpacked.
ORION® Water Endpoint Identification Each ORION endpoint can be identified using the unique numeric serial number located on a tag attached to the wire harness and etched on the top (CE) or side (SE, ME) of the endpoint housing. Each Badger Meter encoder is clearly identified on the face of the register with an assembly number, unit of measure and meter model.
Installation Data Network Endpoint Installation When installing an SE or ME (used with a network gateway transceiver) or CE (used with an ORION 4.0 or 2.0 gateway receiver) endpoint in a pit, the endpoint must be mounted through the lid of a non-metal pit lid for maximum propagation of the radio signal.
ORION® Water Endpoint Pit Installation Through the Lid Installation Kit (SE, ME and CE Endpoints) The Through the Lid Installation Kit is designed for use with a lid with maximum thickness of one-inch, and a standard hole diameter of 1-7/8 inches. Top Cap 1" Maximum Pit Lid Thickness 5.13 Nut Pit Lid Tube Figure 2: ORION Pit Endpoint To install the endpoint through the lid, follow these steps per Figure 2. 1. Screw the nut onto the tube threads as shown. 2.
Installation Data Below Lid with Knuckles Installation Kit (ME and CE Endpoints) For below the lid installations, a special mounting bracket (Figure 3) is available. This mounting support bracket is designed for use with 3/8", 1/2" and 5/8" rebar or 1/2" schedule 40 PVC pipe.
ORION® Water Endpoint Integrated Pit Lid Hanger Installation Kit (ME and CE Endpoints) ORION endpoints can also be installed in composite and plastic lids with an integrated hanger for AMR/AMI endpoints. An installation kit for installing an ORION pit endpoint to the lid is available. To install an ORION endpoint to a composite or plastic lid, follow these steps. 1. Thread the lock nut onto the top of the ORION endpoint as shown. 2. Slide the endpoint into the lid bracket. 3.
Installation Data Remote Installation Remote Wall Mount Box Enclosure Kit (SE, ME and CE Endpoints) The ORION Remote Wall Mount Box Enclosure Kit is for use with either the Recordall Transmitter Register (RTR) or Absolute Digital Encoder (ADE) stepped tube and threaded tube ORION endpoint for remote mounting applications.
ORION® Water Endpoint Top 1/4" Wide Slot 3 Security Ribs 2 Strain Relief Tabs Hole in Bottom Figure 8: Remote Box Enclosure Mounting 2. Place the endpoint into the ORION Remote Box Enclosure as shown in Figure 9. To ensure maximum endpoint performance, it is important to mount the ORION endpoint in the proper orientation, with the endpoint antenna up and ORION endpoint IR communication port and wire down. 3.
Installation Data 4. After the endpoint is mounted in the Remote Box Enclosure, loop the endpoint wire through the strain relief tab and through the cut out on the bottom of the enclosure. If needed, gel splice connections can be made and kept inside the Enclosure prior to mounting. Right Side Strain Relief Tab Cable out of Bottom Figure 10: Endpoint Wire Positioning 5. Verify that the Remote Box Enclosure is properly positioned with the endpoint antenna up and the endpoint IR port facing down.
ORION® Water Endpoint Remote Installation Bracket Kit (SE, ME and CE Endpoints) The following instructions are provided to properly install an ORION endpoint in any indoor, outdoor or pit application. Prior to beginning the installation procedure, ensure that the following items are available. • Remote Installation Bracket Kit • Two customer-supplied screws • Screwdriver and drill The Remote Installation Bracket securely mounts an ORION endpoint.
Installation Data 2. Locate the small triangle aligned with the small hole on the bottom of the installation bracket. This triangle is used to properly align the endpoint to the installation bracket. Triangle Figure 13: Aligning Triangle On the ORION endpoint, there is a small triangle printed on the lower side of the housing. Triangle Figure 14: Housing Triangle 3. Align the two triangles and push the bracket and endpoint together.
ORION® Water Endpoint 4. With the installation bracket in one hand and the housing in your other hand, hold the bracket still and twist the housing approximately 1/4 turn clockwise until it clicks and locks into place. Figure 16: Bracket and Housing Connection To install the endpoint assembly, follow these steps. 1. Align the ORION endpoint and the installation bracket with the antenna facing upwards (Figure 17). 2.
Installation Data Wiring a Universal Endpoint Universal Endpoint Identification The ORION Universal endpoint is available in a three-wire pit or remote endpoint configuration for connection to Sensus® ICETM and ECR II, Neptune® ProRead and E-Coder™, Elster AMCo® ScanCoder ®, Hersey® and Metron Translator encoder registers. All ORION Universal endpoints are shipped from the factory pre-programmed and can be connected to any compatible encoder.
ORION® Water Endpoint 3. Using the charts below, connect the ORION Universal 1 endpoint to an approved encoder according to the following guidelines. Verify the endpoint serial number prior to completing the wiring set up. Due to the customized, factory wire configurations of the Hersey Translator, please contact Hersey to determine the terminal post wiring schematic for your encoders. When the terminal post information is determined, use the Sensus ECR 11, OCE wiring directions below.
Installation Data 6. Using the required Gel Splice Crimping Tool (59983-001), place the connector with the wires into the jaws of the crimping tool. Figure 19: Connector in Crimping Tool Crimp the connector by squeezing the handles until the connector is completely compressed. The crimp tool is designed to prevent applying too much pressure to the gel cap. Continue to apply pressure for three seconds. Figure 20: Compress Connector 7.
ADE Endpoint After the ADE is assembled to the meter and the ORION endpoint is installed, the endpoint is ready for operation. Using a handheld or a mobile laptop confirms that the endpoint wiring has been done correctly and that the endpoint is broadcasting RF data for reading. When allowing the endpoint to turn on via consumption, the endpoint requires two hourly reading intervals where consumption has changed the electronic reading.