Instructions / Assembly

SAFETY TIPS:
Safety glasses and gloves are recommended to be worn during installation. Metal grid components can be sharp.
When working overhead, make sure your work area is clear of obstructions and that your ladder is stable.
IMPORTANT INFORMATION:
Store and install panels in areas with temperature and humidity ranges that meet specific product warranty
requirements.
Remove panels from the cartons 24 hours before installation and allow them to adjust to normal interior conditions of
the area where installation will take place.
Never install ceiling panels below an existing ceiling that contains embedded radiant-heat coils.
Do not apply loose fill or bat insulation so that it rests directly on the panels.
Keep hands clean to avoid smudges on the finished ceiling.
Always cut mineral fiber or fiberglass ceiling panels face up with a sharp utility knife.
Main beams should be installed perpendicular to the joists.
Main beams are typically installed on 4' centers. If your room configuration is unusual, you may require additional
components.
To allow for ceiling tile installation and accessibility, the minimum drop is 3" with traditional hanger wire or 2.5" with
QuickHang
grid hooks. (QuickHang instructions are notated by a gray background)
NOTE: QuickHang hooks and brackets are available through select retailers. Visit ceilings.com/stores for where to buy.
Installations with light fixtures will likely require additional clearance and support. Consult the light manufacturer’s
instructions for details.
When installing below an existing drywall ceiling, a minimum 4" drop is required to install panels. Joists will need to be
located and marked.
NOTE: QuickHang hardware cannot be used below drywall ceilings.
TOOLS NEEDED TO INSTALL YOUR CEILING
PLANNING YOUR ARMSTRONG CEILING
Main beams typically run perpendicular to the joists. If you have an
existing drywall ceiling you will need to locate and identify the joist
direction.
LOCATE HIDDEN JOISTS TO INSTALL WIRE FASTENERS
Use either a stud finder or locate hidden joists by tapping on the ceiling
until you hear a solid thud. Drive a nail in here. Repeat this to locate
other joists and determine their direction. Mark the joist locations with
chalk lines.
Find joists (A).
Drive nails to find exact center line of joists.
Snap chalk line for each joist (B).
Safety
Glasses
Straight Edge
Hammer
Tape
Measure
Utility
Knife
2' or 3'
Carpenter’s Level
Pencil
Tin Snips
String or
Chalk Line
Clamp
Gloves
Wire Cutting
Pliers
Magnetic
Level
Lunettes
de curité
Règle á
tracer
Marteau
Ruban à
mesurer
Couteau
tout usage
Niveau à bulle
de 2 ou 3 pi
Crayon
Cisaille
à tal
Corde ou
marqueur
à la craie
Bride
Gants
Pinces pour
couper le f il
Niveau
magnétique
Gafas de
seguridad
Regla
Martillo
Cinta para
medir
Cuchilla
multiuso
Nivel de
carpintero
Lápiz
Tin Tijeras para
cortar metales
Línea de
cuerda o
de tiza
Abrazadera
Guantes
Tenaza para
cortar alambre
Nivel
magnético
French
Spanish
10' 6"
9'
Joist direction
Joist usually
16" on center
Snapped chalk lines
in center of joists
A
B
Sample Room
How to Install Your Armstrong
®
Suspended Ceiling

Summary of content (6 pages)