Installation & Assembly
Page | 1
POLYURETHANE BASE MOULDINGS INSTALLATION
TOOLS:
• Measuring tape
• Fine tooth saw & Mitre box or
compound mitre box
• Pencil
• Safety goggles
• Safety mask
• Hammer or finishing nailer
• Putty knife
• Caulking gun
• Paint brushes
• Level
MATERIALS:
• Nails
• Polyurethane Panel mouldings
• Premium Polyurethane
Construction adhesive
• High quality all Acrylic latex or oil
based paint
• Painters Caulk
• Clean cloth or sponge
• 220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Polyurethane Base mouldings.
WALL AND CEILING PREPARATION
Prior to installing base mouldings make sure walls are
• dust free
• dry
• grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing Architectural Product’s Base mouldings, make sure
mouldings and adhesives are placed at room temperature 24 hours before
installation. This allows material to adjust to the temperature of the room
to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50°
to 95° Fahrenheit
PAINTING
Mouldings can be painted either before installation or after. It is up to the
installer.