Installation Sheet

*Wrench
Certified to comply with ANSI A112.18.1M
Recommended Tools
*Supplied with Fitting
*Hex key
Turn off hot and cold water
supplies before beginning.
CAUTION
1
2
Insert SPOUT SHANK (3) through center hole of MOUNTING LEDGE.
Make sure that the RUBBER RING (1) is properly seated in RECESS
of ESCUTCHEON RING (2).
Assemble RUBBER WASHER (4), BRASS WASHER (5) and
LOCKNUT (6) onto SHANK (3). From underside of ledge tighten
LOCKNUT (6) to secure SPOUT (7).
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
4
2
3
1
3
4
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and 12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
5
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
VALVE inlet is
3/4-inch NPT male.
NOTE
ROUGHING-IN DIMENSIONS
MOUNTING
SURFACE
Tubing Cutter
RECESS
3
7
1
4
6
2
5
MOUNTING
SURFACE
6-1/2" to 12"
(165mm to 305mm)
Install RUBBER RING (1) into ESCUTCHEON BASE (2).
M965237 REV. 1.4 (5/17)
Thank you for selecting American-Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.
INSTALLATION
INSTRUCTIONS
7440.900
7440.901
QUENTIN
MOUNTING
SURFACE
2-7/8" D.
(72mm) D.
2-3/8" D.
(60mm) D.
4-7/8"
(125mm)
6-1/2" to 11-3/4"
(165mm to 300mm)
8-3/4"
(222mm)
5-1/8"
(131mm)
1-1/2 MAX.
(38mm) MAX.
1-3/16" MAX.
(30mm) MAX.
1-3/16 D.
(30mm) D.
3'
(76mm)
(H)
(C)
1-1/8 D.
12 MAX.
(305mm)
2-1/16" D.
(52mm) D.
1-1/16 D.
(27mm) D.
3/4-14 MALE
N.P.T. INLETS
9"
(230mm)
11-9/16"
(294mm)
8-1/4"
(210mm)
DECK-MOUNT BATH FILLER

Summary of content (4 pages)