Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Disconnect first battery cabinet 24-VDC return wires in the Modular Cell 4.0B primary cabinet DANGER Electrical Shock and Equipment Damage Hazard When performing the following procedure, power should not be applied to the Modular Cell 4.0B primary cabinet. Before the installation of the second battery cabinet can begin, the following steps must be performed to disconnect DC power from the Modular Cell 4.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power How to route and connect the DC cables between the first and second WNG24-BC battery cabinets .............................................................................................................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Important! If the battery cabinet has type 1 battery shelves, skip the next step. ............................................................................................................................................................................ 3 Refer to the figure below, and remove the left-hand side rail from the top shelf (5) in the second battery cabinet.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Connect the DC cables in the second battery cabinet Perform the following steps to connect the DC cables in the second battery cabinet. ............................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 7 Do not replace the top shelf battery retaining bracket in the second battery cabinet (batteries must be installed prior to reinstallation of the retaining bracket). 24-VDC RETURN CABLES +24-VDC CABLES (MARKED RED) DC BUS PANELS .................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Connect the battery cabinet cables in the first battery cabinet Perform the following steps to connect the DC cables in the first WNG24-BC battery cabinet. ............................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 5 Replace the plastic cover on the DC bus bar panel (in the first battery cabinet). Refer to the figure below.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power How to route and connect the alarm and fan power/alarm cables in the second WNG24-BC battery cabinet .............................................................................................................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 2 Place the cables through the square opening between the cabinets as shown in the figure below. a. SW1 / SW4 FUSE ALARM CABLE (J309) b. P309 (NOT USED) 1 INTRUSION ALARM CABLE (J307) 2 a. P307 (NOT USED) b. "C" AND "NC" (FRONT) c.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Route and connect the fan power/alarm cable in the second WNG24-BC battery cabinet Perform the following steps to route and connect the fan power/alarm cable in the second WNG24-BC battery cabinet. ............................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 3 Route and attach the cables in such a way that they do not interfere with door closure or installation/replacement of parts. Refer to the figure below. "FAN" FOR SECOND WNG24-BC BATTERY CABINET FAN FAN GROUND STRAP P9 (NOT USED) P9 ..........
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Route and connect the fuse alarm cable in the second WNG24-BC battery cabinet Perform the following steps to route and connect the fuse alarm cables in the second WNG24-BC battery cabinet. ............................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 4 Connect the fuse alarm cable. Refer to the figure below. SW1 SW4 P309 (NOT USED) P309 .............................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Route and connect the intrusion alarm cables in the second WNG24-BC battery cabinet Perform the following steps to route and connect the intrusion alarm cables in the second WNG24-BC battery cabinet. ............................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 3 Connect the front intrusion cable as shown. Refer to the figure below. SHORTER CABLE (FRONT) C P307 (NOT USED) DOOR NC P307 .......................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power How to route and connect the alarm and fan power/alarm cables in the first WNG24-BC battery cabinet .............................................................................................................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 6 Route the identified cables from the second WNG24-BC battery cabinet, into the first, and to the locations shown in the figure below.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Connect alarm cables in the first WNG24-BC battery cabinet Perform the following steps to connect the alarm cables in the first WNG24-BC battery cabinet. ............................................................................................................................................................................ 1 Connect the J307 connector to connector P307 in the first WNG24-BC battery cabinet.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Connect the fan power/ alarm cable in the first WNG24-BC battery cabinet Perform the following steps to connect the fan power/alarm cable in the first WNG24-BC battery cabinet. ............................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power How to route and connect the AC power cable in the first battery cabinet .............................................................................................................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Route the AC power cable into the first WNG24-BC battery cabinet Perform the following steps to route the AC power cable into the first WNG24-BC battery cabinet. ............................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 3 Thread the AC power cable through the AC coupling into the first WNG24-BC battery cabinet. Refer to the figure below.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Connect AC cable in the first WNG24-BC battery cabinet Perform the following steps to connect the second WNG24-BC battery cabinet AC cable in the first WNG24-BC battery cabinet. ............................................................................................................................................................................ 1 In the Modular Cell 4.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ............................................................................................................................................................................ 6 Connect the wires of the AC cable to the terminal strip and the grounding screw as follows. Refer to the figure below. • Black (L1) to left terminal strip • Red (L2) to right terminal strip • Green to grounding screw .........................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power How to install 60ECv2 battery cabinets with a 4.0B primary cabinet with integrated power (reference) ............................................................................................................................................................................................................................................................. How to install a first 60ECv2 battery cabinet with a 4.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power Current and revised battery cables The following figures illustrate the current and revised battery cables with both 12IR125 and SBS C11 batteries. Note that C11 battery installation was not covered in the referenced document. CURRENT 12IR125 BATTERY WIRING Two quick-disconnect connectors.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power CURRENT SBS C11 BATTERY WIRING Two quick-disconnect connectors.
Power and power alarm connections in Modular Cell 4.
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power CURRENT WIRING TO CABINET BUS BARS Five sets of battery cables to the bus bars Nut and Washer (1 Set of 10) P401-10 Battery Shelf 5 J401-5 P401-8 Battery Shelf 4 J401-4 P401-6 Battery Shelf 3 J401-3 P401-4 Battery Shelf 2 J401-2 J401-1 Battery Shelf 1 P401-2 .......................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B cabinets with integrated power ...........................................................................................................................................................................................................................................................
5 Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Overview ............................................................................................................................................................................................................................................................. Purpose Contents This chapter provides instructions for the installation of rectifiers in integrated power Modular Cell 4.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install components in Modular Cell 4.0B cabinets Overview ............................................................................................................................................................................................................................................................. Purpose This section contains the following procedures. How to install rectifiers in Modular Cell 4.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install rectifiers in Modular Cell 4.0B cabinets ............................................................................................................................................................................................................................................................. Install rectifiers in a Modular Cell 4.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 6 Tighten the thumb screws. Blank Plate Auxiliary Controller 1 2 1 2 1 2 3 4 3 4 3 4 Primary Rectifier Shelf Modular Cell 4.0B cabinet Total carriers Modular Cell 4.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install batteries in Modular Cell 4.0B cabinets .............................................................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 2 Unplug the battery connectors. Refer to the figure below. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 4 Remove the battery module front panel. Refer to the figure below. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 9 Remove the positive and negative battery cables from the batteries, and the two batteries from the shelf. ..................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 11 Measure the voltage at the battery cable external connector to determine that the polarity is correct. Refer to the figure below. • Digital meter - no symbol or positive symbol = correct connection.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install batteries in a WNG24-BC battery cabinet Overview ............................................................................................................................................................................................................................................................. Purpose This section provides the instructions for the installation and connection of the batteries.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................................................................................................. Battery safety and precautions Your understanding of the following information is important to ensure a proper and safe installation of the batteries.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets WARNING Injury to Personnel Lifting of the batteries by one person can result in a serious injury. Always use two people (or use a lifting device) to handle the batteries. WARNING High Energy hazard The following procedures are the safest method to install and connect the batteries. If these procedures are not followed in the exact sequence listed, a serious electrical shock hazard will result.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Description of the battery compartment • Do not dispose of the batteries in a fire. The cell may explode. Check with local codes for possible disposal instructions • Do not open or mutilate the batteries. Released electrolyte is corrosive and may cause damage to the eye and skin.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Approved batteries QUANTITY As required per site specification The following batteries are approved for use in the WNG24-BC battery cabinet. WNG24 - BC SHELF TYPE BATTERY TYPE Shelf type 1 Power CSL-12100 L1-type batteries Shelf type 1 Marathon GNB M12V100FT L1-type batteries Shelf types 1 and 2 12IR125 Shelf types 1 and 2 C-11 and battery type ....................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to determine battery shelf type .............................................................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install L1, L2, and 12IR125 batteries on type 1 battery shelves .............................................................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 1 Check and record battery initial voltages and all battery date codes. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets The figure below illustrates the battery string positions and battery numbers for L1, L2, and 12IR125 batteries on type 1 shelves.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Important! This procedure, and the illustrations it contains, uses 12IR125 batteries as an example. Refer to Examples of L1 and L2 battery shelf positions on Page 5 - 24 for examples of L1 and L2 battery shelf positions. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 5 Thread a rod into the appropriate hole on the outside of the two batteries installed in the previous step. Refer to the figure below, item 5. 1 REAR SHELF BRACKET CENTER THREADED HOLE 5 1 3 4 2 3 2 5 4 .........................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Install the battery retaining bracket Perform the following steps to install the battery retaining bracket. ............................................................................................................................................................................ 1 Preposition the retaining bracket in position 1 for L1 and L2 batteries, or position 2 for 12IR125 batteries, as applicable.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 3 END THREADED ROD Using the nuts and washers provided, attach the retaining bracket at the center and end threaded rods only. Do not tighten the nuts. CENTER THREADED ROD END THREADED ROD 12IR125 RETAINING BRACKET ..................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Attach the two battery cable assemblies to the retaining bracket (L1,L2, and 12IR125 batteries only) Important! This procedure, and the illustrations it contains, uses 12IR125 batteries as an example. Refer to Examples of L1 and L2 battery shelf positions on Page 5 - 24 for examples of L1 and L2 battery shelf positions.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Examples of L1 and L2 battery shelf positions Refer to the three figures below for examples of L1 and L2 battery shelf positions. CENTER THREADED HOLE BOTTOM ROW HOLES MIDDLE ROW HOLES L1 CENTER THREADED HOLE L1 ..................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets TOP ROW HOLES CENTER THREADED HOLE L2 ............................................................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Connect positive battery cables to all battery strings Important! When performing the following steps, do not connect the negative battery cables. The negative battery cables are not connected until after the interconnecting bus bars have been installed in the next procedure. Perform the following steps to connect the positive battery cables to all battery strings. ............................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Attach interconnecting bus bars to all battery strings Perform the following steps to attach interconnecting bus bars to all battery strings. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Connect the negative battery cables to all battery strings Perform the following steps to connect the negative battery cables to all battery strings. Refer to the figure below. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 4 Torque the negative battery connections using an insulated socket and torque wrench set at 60 in.-lb. (6.8 Nm). Do not use the torque specifications provided in Chapter 1.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install C-11 batteries on type 1 battery shelves .............................................................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 1 Check and record battery initial voltages and all battery date codes. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets The figure below illustrates the battery string positions and battery numbers for C-11 batteries on type 1 shelves. STRING 5 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 STRING 4 STRING 3 STRING 2 STRING 1 FRONT VIEW ..................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Place the C-11 batteries on a shelf Use the following procedure to place batteries on a shelf, starting with shelf 1 (bottom). Important! This procedure, and the illustrations it contains, are generic in nature, in order that they may be used for all battery types. ..................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 7 Slide the last two C-11 batteries onto the shelf on each side of the threaded rods installed in the previous step. Refer to the figure below, item 6. ......................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Therefore, it may be desirable to plan on leaving the top shelf empty when installing the batteries. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 3 Using the nuts and washers provided, attach the retaining bracket at the center and end threaded rods only. Do not tighten the nuts. CENTER THREADED ROD RETAINING BRACKET END THREADED ROD END THREADED ROD ...........................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Attach the two battery cable assemblies to the retaining bracket (C-11 batteries only) Perform the following steps to attach the battery cable assemblies to the retaining bracket (for C-11 batteries only). ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Place the battery negative and positive bus bars Important! Although all four parallel bus bars are identical, observe that the orientation of the positive and negative parallel bus bars is different on the left three batteries (1, 2 and 3) than on the right three batteries (4, 5 and 6). Also observe that the negative and positive pairs are positioned in a reverse orientation to each other. Refer to the figure on Page 5-41.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 5 _ = + = Repeat Steps 1 through 4 for all remaining battery shelves, if applicable. Refer to the figure below.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Connect the positive battery cables to the batteries Important! When performing the following steps, for safety reasons, always connect the positive battery cables first and the negative battery cables last (when instructed to do so). Perform the following steps to connect the positive battery cables to the batteries. ............................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets .............................................................................................................................................................................. 5 Repeat Steps 2 through 4 for all populated battery shelves. Remember, for safety reasons, to connect the positive battery cables first and the negative battery cables last (when instructed to do so).
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Attach the interconnecting bus bars Perform the following steps to connect the interconnecting bus bars. Do the bottom shelf first. ............................................................................................................................................................................ 1 Remove the series bus bar from the kit provided with the batteries. ...................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 5 Repeat Steps 1 through 4 for the remaining battery shelves, if applicable. Refer to the figure below. SERIES BUS BARS S2 1 2 3 4 5 6 S1 1 2 3 4 5 6 BATTERY CABLES NOT SHOWN FOR CLARITY ....................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Connect the negative battery cables to the batteries Perform the following steps to connect the negative battery cables to the batteries. ............................................................................................................................................................................ 1 Separate two of the battery cables.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 4 Repeat Steps 2 and 3 for all remaining battery shelves, if applicable. S-2 1 2 3 4 S-1 + + _ + _ 1 6 5 2 3 4 5 6 ............................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Install the insulating battery terminal covers Perform the following steps to install the insulating battery terminal covers. ............................................................................................................................................................................ 1 Place all insulating covers on the battery terminals, as shown in the figure below.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install 12IR125 type batteries on type 2 battery shelves .............................................................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 3 Include this information with documentation supplied to the customer. END OF STEPS ........................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets The figure below illustrates the12IR125 battery string positions and battery numbers in the WNG24-BC battery cabinet.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Place the 12IR125 batteries on a shelf Use the following procedure to place batteries on a shelf, starting with shelf 1 (bottom). ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Important! Carefully slide a battery into the center position on the bottom battery shelf (1). Then, slide the battery to the right side of the cabinet shelf. Refer to item 1 in the figure below. BATTERY RETAINING BRACKET (1 of 5) 2 1 ..............................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Important! When installed, the battery terminals on the front, narrow end of the battery should face out of the cabinet. The terminals should have a protective cap. Refer to the figure below. (-) BLACK NEGATIVE BATTERY TERMINAL RED (+) POSITIVE BATTERY TERMINAL ..................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Adjust and secure the front battery retaining brackets Important! When performing the following steps, the battery retaining brackets must be installed as shown in the figure below and the Step 5 figure on Page 5- 56. If the brackets were not shipped installed in the orientation shown, they must be reversed as described in the following steps. Perform the following steps to correctly install the retaining brackets. .........
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 5 INSIDE NUT Reverse and reinstall the brackets as shown in the figure below.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Connect positive battery cables to all battery strings Important! When performing the following steps, do not connect the negative battery cables. The negative battery cables are not connected until after the interconnecting bus bars have been installed in the next procedure. Perform the following steps to connect the positive battery cables to all battery strings. ............................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 4 Connect the positive (+) battery cable to the positive (+) terminal on battery 2 of string 2, using the flat washer, lock washer and nut provided. Refer to the figure on Page 5-60 for a top view of a typical battery cable connection. ..................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Attach interconnecting bus bars to all battery strings Perform the following steps to attach interconnecting bus bars to all battery strings. ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 7 Connect the interconnecting bus bar using the flat washer, lock washer and nut provided. Refer to the figure below, which illustrates the interconnecting bus bar installation, including the installation order of the washers.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Connect the negative battery cables to all battery strings Perform the following steps to connect the negative battery cables to all battery strings. Refer to the Step 4 figure on Page 5- 62 ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 4 Torque the negative battery connections using an insulated socket and torque wrench set at 60 in.-lb. (6.8 Nm). Do not use the torque specifications provided in Chapter 1.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets How to install C-11 type batteries on type 2 battery shelves ............................................................................................................................................................................................................................................................. Overview This section provides the instructions for the installation and connection of the C-11 batteries.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Read battery installation procedure overview Important! In the event that the battery compartment is removed from the primary cabinet because of an upgrade that adds the A6 amplifier shelf (carriers 5 and 6), up to four spare L1 batteries will result. The end user may wish to use these batteries in the battery cabinet, in which case a shelf must be left vacant.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets The figure below illustrates the battery string positions and battery numbers for the C-11 batteries in the WNG24-BC battery cabinet. STRING 5 1 2 3 4 5 6 1 2 3 4 5 6 STRING 4 STRING 3 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 STRING 2 STRING 1 ............................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets The battery terminals are located on one end of the battery. Positive and negative terminals are clearly labeled “+” and “-”. Strap handles are permanently attached to the battery. Refer to the figure below. Important! To prevent an inadvertent electrical short during battery installation, an insulated cover is factory-installed over the terminals on the batteries. Do not remove this cover until you are instructed to do so.
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets CAUTION The batteries weigh about 66 pounds (30 kg) each. Use care when lifting them. Place the C-11 batteries on a shelf Use the following procedure to place batteries on a shelf, starting with shelf 1 (bottom). ............................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 2 BATTERY RETAINING BRACKET (1 of 5) Lift and place one battery on the center of the bottom shelf, with the battery terminals facing towards the front. Refer to the figure below. 2 1 ...................................................................
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets ............................................................................................................................................................................ 5 BATTERY SPACER (1 of 10) Install the battery spacers in the locations shown in the figure below (five per shelf).
Component installation in the Modular Cell 4.0B and the WNG24-BC battery cabinets Reinstall the battery retaining brackets Important! When performing the following steps, the battery retaining brackets must be installed as shown in the Step 5 figure on Page 5- 71, for C-11 batteries. If the brackets were not shipped installed in the orientation shown, they must be reversed as described in the following steps. Perform the following steps to correctly install the retaining brackets. ........................