Overview of the Flexent‚ Modular Cell 4.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation • Silicone caulk • Socket sets (decimal and metric) various drives • Stripping tool (for LDF4 antenna jumper cables) part number 74Z0-12-15 • Talcum powder • Tools for preparing cables • Torque wrenches, 35 - 300 in.-lb. (4 - 34 Nm) • Torque wrenches, 4.4 -150 ft.-lb.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Safety precautions ............................................................................................................................................................................................................................................................. General Always observe all warnings and cautions as they appear in individual chapter text.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Safety - General precautions for installation procedures ............................................................................................................................................................................................................................................................. WARNING Failure to observe these safety precautions may result in personal injury or damage to equipment.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation • Never touch uninsulated wiring or terminals carrying direct current or ringing current, and never leave this wiring exposed. Protect and tape uninsulated wiring and terminals to avoid risk of fire, electrical shock, and injury to personnel. • Never push objects of any kind into the product through slots, as they may touch dangerous voltage points or short-out parts that could result in a fire or an electrical shock.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Safety - Specific hazards ............................................................................................................................................................................................................................................................. DANGER Lightning Strikes! Lightning strikes are possible during stormy weather, and could result in death or severe injury.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation WARNING Beryllium Oxide Poisoning Hazard! The transmitter units include components which contain beryllium oxide (BeO). In this form, BeO ceramics do not constitute a hazardous material as long as this material is not destroyed by external mechanical forces.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation CAUTION Electrostatically Sensitive Components! Semiconductor elements can be damaged by static discharges. The following rules must be complied with when handling any module containing semiconductor components: • Wear conductive or antistatic work clothes (for example, a coat made of 100% cotton). • Wear grounded ESD wrist strap. • Wear shoes with conductive soles on a conductive floor surface or work mat.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Safety labels ............................................................................................................................................................................................................................................................. Overview This section provides illustrations of certain Modular Cell safety labels. Safety labels The following door safety label is found on the Modular Cell cabinets. .....
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Product safety ............................................................................................................................................................................................................................................................. Compliance statement The Flexent® Modular Cell 4.0B cabinet is UL Listed, Information Technology Equipment.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation FCC statements ............................................................................................................................................................................................................................................................. FCC statement Antenna installations for the Flexent Modular Cell 4.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation 47 CFR part 15 statement This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation 47 CFR part 68 statement The Flexent Modular Cell 4.0B complies with Part 68 of the FCC rules. At the upper right-hand corner inside the cabinet assembly of this equipment is a label that contains, among other information, the FCC registration number. If requested, this number must be provided to the telephone company. This equipment connects to the network via a punchdown block.The Facility Interface Code for this equipment is 04DU9-1SN.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Canadian standards ............................................................................................................................................................................................................................................................. ICES-003 Interference-Causing Equipment Standard Digital Apparatus This Class [A] digital apparatus complies with Canadian ICES-003.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Eco-environmental statements .............................................................................................................................................................................................................................................................
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Moreover, in compliance with Legal requirements, where applicable, Lucent Technologies will offer to provide for the collection and treatment of Waste from Lucent Technologies products, or from products displaced by Lucent Technologies offers, in accordance with applicable legislation.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Packaging collection and recycling .............................................................................................................................................................................................................................................................
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Minimum installation temperatures .............................................................................................................................................................................................................................................................
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation • Storage prior to installation: 20 degrees C (68 degrees F) • If installation has to proceed at -25 deg. C or below, cables must be stored in heated areas (Min. 20 deg. C) for 24 hours prior to installation. Extra care should be taken to keep cables sheltered from winds and temperature below -25 deg. C during installation. The use of a heated tent is highly recommended. • If installations have to occur at temperatures below -25 deg.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Network description .............................................................................................................................................................................................................................................................
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Base station location The location of each cell site is carefully planned by RF engineers so that a continuous radio coverage of a geographical area is maintained. This planning will ensure that service to each mobile user is uninterrupted as the user moves throughout the coverage area.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation T1/E1 connection to base station Regardless of the 2G/3G1X base station deployment configuration, each base station within a graphical area is connected to a mobile switching center (MSC) via one or more T1/E1 lines. Each T1/E1 line is used to transfer call traffic for a number of mobile users to and from the base station.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Completing landline initiated calls When a landline to mobile call is initiated, call signaling from the PSTN, containing the mobile directory number, is sent the DCS. The call signaling is registered by the ECP via the AP interface. The ECP converted the mobile directory number to its associated electronic mobile serial number.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation 1xEV-DO service The installation of a 1xEV-DO base station is the same as a 2G/3G base station installation regardless whether the 1xEV-DO base station is a stand-alone base station or co-located with 2G or 3G-1X base station. The difference is the destination of the T1/E1 lines. Rather than going to the MSC, the T1/E1 lines are connected by a Flexent Mobility Server (FMS) within the RAN network.
Overview of the Flexent‚ Modular Cell 4.0B cabinet installation Accessing the internet Each time a user accesses the Internet, either a dynamic Internet Protocol (IP) address is assigned to the user, or the user asserts its own static IP address. The dynamic IP address is assigned for the duration of the Internet session by the PDSN, which is operated as a Home Agent (HA) for the Internet Service Provider (ISP).
2 Modular Cell 4.0B and WNG24BC cabinet handling, placement, anchoring and grounding Overview .............................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Installation of anchors and optional mounting bases, if applicable Overview .............................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding How to determine the anchoring requirements .............................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Anchor specifications Use the following table to determine the specific anchor to use, and the hole size and depth required. Note that anchors for cabinets may be set in the drilled hole before or after cabinet placement, whereas anchors for mounting bases must be set before placement of the mounting base.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Anchor installation ............................................................................................................................................................................................................................................................. Mark and drill the anchor holes Important! Note that outdoor cabinets may be mounted directly on a concrete or on optional steel mounting bases.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 5 If not setting the anchors at this time, tape over the open hole to prevent debris from falling into the hole. Then: • If installing on mounting bases, skip to Installation of optional steel mounting bases for a 4.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Set the 1/2-inch drop-in anchor (if applicable) Important! If using “12-mm expansion stud anchors” with mounting bases, skip to Set the 12-mm expansion stud anchors for mounting bases on Page 2 - 9 and continue the installation from that point. Important! If using “12-mm expansion stud anchors” without mounting bases, skip to Cabinet handling on Page 2 - 21 and continue the installation from that point.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 3 Tape over the open anchor to prevent debris from falling into the hole. SETTING TOOL ...................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Set the 12-mm expansion stud anchors for mounting bases Important! If using “12-mm expansion stud anchors” without mounting bases, skip to Cabinet handling on Page 2 - 21 and continue the installation from that point. Perform the following steps to install the 12-mm expansion stud anchors for mounting bases. Refer to the figure on Page 2-10.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 6 Repeat Steps 1 through 5 for all four holes for each mounting base to be placed. THREADED ROD A NUT B FLAT WASHER PLATE WASHER SURFACE REMOVABLE SPACER SPREADER NUT 1/4-inch DRIVE 2 1 C D ..................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Installation of optional steel mounting bases for a 4.0B primary cabinet with integrated power, and battery cabinets if applicable .............................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 3 Start threading the anchoring bolts, but leave them loose (they will be tightened later).
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Install the optional mounting bases for the primary cabinet, and battery cabinets if applicable, using zone 3 and 4 type anchors Important! If not using zone 3 or 4 anchors, skip to Cabinet handling on Page 2 - 21 and continue the installation from that point. Perform the following steps to install the mounting bases using zone 3 and 4 type anchors. ..........................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 4 Hand-tighten the nuts, but leave them loose (they will be tightened later).
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 6 Repeat Steps 1 through 4 for the second battery cabinet mounting base and then attach it to the first battery cabinet mounting base using the four bolts, flat washers and lock washers supplied. Refer to the figure on Page 2-14. ......................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Installation of optional steel mounting bases for a 4.0B dual band cabinets .............................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Install the optional mounting bases for a dual band cabinet, using zone 0, 1, and 2 type anchors Important! If using zone 3 or 4 anchors, skip to Install the optional mounting bases for a dual band cabinet using zone 3 and 4 type anchors on Page 2 - 19 and continue the installation from that point. Perform the following steps to install the dual band cabinet mounting base using zone 0, 1, and 2 type anchors. ............
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 6 Tighten all eight anchor bolts to 18 ft.-lb (24 Nm). PREVIOUS MODULAR CELL CABINET MOUNTING BASE DUAL BAND CABINET MOUNTING BASE FLAT WASHER BOLT MOUNTING BASE FLAT WASHER FLAT WASHER SHIM (EXAMPLE) BOLT LOCK WASHER ...........................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Install the optional mounting bases for a dual band cabinet using zone 3 and 4 type anchors Important! If not using zone 3 or 4 anchors, skip to Cabinet handling on Page 2 - 21 and continue the installation from that point. Perform the following steps to install the dual band cabinet mounting base using zone 3 and 4 type anchors. ..............................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 5 Attach the dual band mounting base to the previous Modular Cell mounting base using the four bolts, flat washers and lock washers supplied. Refer to the figure below.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Cabinet handling Overview of this section ............................................................................................................................................................................................................................................................. Purpose This section provides information about standard practices for handling cabinets.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Handling a cabinet ............................................................................................................................................................................................................................................................. Overview This section provides standard practices for handling a cabinet.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Supplies needed The following supplies are required. • Head gear • Insulated gloves Safety precautions for handling equipment • Only those operators who are specifically trained and meet company requirements will be permitted to operate the derrick or forklift equipment. • All persons working with derrick trucks or forklifts, must wear standard safety headgear, eye protection, and insulated gloves (if required).
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Unpack the cabinet Use the following procedure to unpack the cabinet. ............................................................................................................................................................................ 1 Make note of the "TIP N TELL" indicator on the package to see if the cabinet was mishandled or tipped during shipment. ............................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Lift cabinet using boom tip winch CAUTION Personnel injury or equipment damage Derrick equipment or a forklift must be used to lift the cabinet. Do not attempt to move the cabinet manually, or remove it from the pallet manually. Important! Before attempting to use derrick equipment, refer to Page 2 - 23, “Safety precautions for handling equipment”.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Important! Make sure that the previously obtained lifting eye bolts are properly installed before performing the next step. Also make sure that the slings are long enough to prevent excessive side stress on the lifting eye bolts. ............................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Transport cabinet Use the following steps to transport the cabinet after attaching it to the derrick. ............................................................................................................................................................................. CAUTION When moving a cabinet in the following procedures, do not tilt the cabinet beyond 30 degrees. Do not stand under the cabinet.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Cabinet placement, anchoring and grounding Overview .............................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Anchor and torque requirements ............................................................................................................................................................................................................................................................. Anchor and torque requirements The following table provides torque requirements for the installation of the Modular Cell 4.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Placement and anchoring of the Flexent Modular Cell 4.0B primary cabinet .............................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Move/lift the primary cabinet into position Use the following procedure to move/lift the cabinet into position. ............................................................................................................................................................................. WARNING Personnel injury or equipment damage Cabinets are too heavy to move without appropriate lifting devices.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Install anchoring bolts or anchor assemblies and level the primary cabinet Use the following procedure to install anchoring bolts or anchor assemblies and level the cabinet. Important! When performing the next step, do not seal the anchor holes. In the event that water should collect, it must be allowed to drain out of the cabinet through the anchor holes. ...................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding a. Place two expansion stud assemblies, or threaded rods, into the front mounting holes using both washers on each assembly. Refer to the figure below. b. Place two expansion stud assemblies, or threaded rods, in the back mounting holes, without the large washer on each assembly. c. Do not torque the nuts at this time if a 4.0B dual band cabinet remains to be installed.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Placement and anchoring of the WNG24-BC battery cabinets ............................................................................................................................................................................................................................................................. Overview This procedure module provides the following instructions.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Prepare the existing cabinet for attachment of an additional cabinet Use the following procedure to prepare the existing cabinet for attachment of an additional cabinet. ............................................................................................................................................................................ 1 Make sure the front door of the existing cabinet is open.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Important! When performing the next step, use care not to bend or otherwise damage the side wall of the existing cabinet, which can result in failure of the subsequently installed conduit seal to prevent water leakage. Use a slow, careful rocking motion to remove the knockout. .....................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Prepare the cabinet being installed for attachment to the existing cabinet Use the following procedure to prepare the battery cabinet for attachment to the existing cabinet. ............................................................................................................................................................................ 1 Open the front door of the cabinet being installed.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 4 Place the DC cable support against the side of the cabinet being installed, and temporarily attach the DC cable support with the two supplied self-tapping screws, as shown in the figure below. OR SELF TAPPING SCREWS (2 of 2) ......................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Partially install the AC cable guide in the cabinet being installed Refer to the figure on Page 2-39 and perform the following steps to partially install the AC cable guide in the battery cabinet. Important! The following steps must be performed before moving the WNG battery cabinet into position against the existing cabinet. ..................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Move/lift the cabinet being installed into position WARNING Personnel injury or equipment damage Cabinets are too heavy to move without appropriate lifting devices. When moving the cabinet, use appropriate lifting devices and a sufficient number of personnel. Perform the following steps to position the cabinet being installed. ................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 5 Perform a preliminary leveling of the cabinet being installed, using the supplied shims. .................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Attach the cabinets together at the square cable support (with second battery cabinet only) Important! If installing the first battery cabinet, do not perform the instructions below. Note that the first battery cabinet will be connected to the Modular Cell 4.0B cabinet at the cable support when the cable interface is installed in Chapter 4.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Important! It is preferred that the screws be installed from inside the first battery cabinet so that all of the nuts are inside of the second battery cabinet when they are tightened in the next step. ............................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 3 Refer to the figure below and tighten the cable support nuts using the tightening sequence shown. 3 FRONT 9 5 1 7 8 2 6 10 4 NOTE: Nuts 1 through 8 are threaded on bolts coming from the first battery cabinet.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Install anchoring bolts or anchor assemblies and level the battery cabinet(s) Use the following procedure to install anchoring bolts or anchor assemblies and level the cabinet. Important! When performing the next step, do not seal the anchor holes. In the event that water should collect, it must be allowed to drain out of the cabinet through the anchor holes. ................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding a. Place two expansion stud assemblies, or threaded rods, into the front mounting holes using both washers on each assembly. Refer to the figure below. b. Place two expansion stud assemblies, or threaded rods, in the back mounting holes, without the large washer on each assembly. c. Do not torque the nuts at this time.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 3 Level the cabinet (as required) using the supplied shims. Important! If the cabinet door does not align properly when closed, the cabinet must be re-leveled until correct door alignment is achieved. ...................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Complete the installation of the AC feed-through coupling and tighten the anchor bolts or nuts Refer to the figure below and perform the following steps to complete the installation of the AC feed-through coupling and tighten the anchor bolts or nuts. ............................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding ............................................................................................................................................................................ 4 Tighten the locknut inside of the second battery cabinet (if applicable), and install a 2-inch plastic bushing on the end of the coupling, as shown in the figure below.
Modular Cell 4.0B and WNG24-BC cabinet handling, placement, anchoring and grounding Placement and anchoring of a Flexent Modular Cell 4.0B dual band cabinet ............................................................................................................................................................................................................................................................. Overview This section provides the following instructions.