User's Manual Part 4

4-3
System Requirements
An LG
Cell
system has location, space, power, and safety requirements for
installation. The Dual Band LG
Cell
requirements for space and power are different
from those for a single-band system and are noted below.
System Location
The LGC
ell
Main Hub and Expansion Hub mount into a standard 19" equipment
rack in a wiring, telecom, or electrical closet, which may contain other Ethernet,
telephony, or miscellaneous equipment.
Standard wiring closet temperatures: 0-45° C
Does not require special air conditioning
Space Requirements
The LGC
ell
Main Hub and Expansion Hubs are installed into a standard 19 rack.
The Main Hub height is 1.7 (44.5 mm). The Dual Band Main Hub is 3.5
(88.9 mm) high.
The Expansion Hub height is 1.7 (44.5 mm). The Dual Band Expansion Hub
is 3.5 (88.9 mm) high.
Allow at least one inch (25 mm) clearance between each hub, between any
existing equipment in the rack, and between the bottom shelf of the rack and
the hub.
Power Requirements
The LGC
ell
requires AC voltage/current. LGC Wireless recommends connecting it
to a UPS (Uninterruptable Power Supply), which may exist in the wiring closet.
Dual-Band equipment requires twice as much power as single-band equipment.
LGC
ell
operates with 88-264 VAC 50/60 Hz.
The Main Hub uses a maximum of 1.6 A of electrical current.
The Expansion Hub uses a maximum of 1.6 A of electrical current.
The RAUs are powered from the Expansion Hubs via the UTP/STP cable and
they use 12V DC.