Quick Start Guide ®
What’s in the Box? Head Office 228 River Avenue Cochrane, AB Canada T4C 2C1 Your PrecisionTM power meter comes with the following items: +1 403.800.3095 www.4iiii.com Technical support available from 4iiii by email from 9am-5pm Mountain Time. Email: support@4iiii.com © Copyright by 4iiii Innovations Inc. All rights reserved. Text, text excerpts, images and diagrams are all subject to copyright. No part may be reproduced or copied without written permission from the publisher.
5. Do not open the adhesive pack until you are ready to apply the adhesive for installation – do not use the adhesive if it has been opened for more than 5 minutes 6. Only use supplied cleaning wipes for your installation – do not sand or use any other cleaning agents on the pod 7. Only apply epoxy adhesive directly to the metal base of the pod – do not put adhesive on your crank arm 8. Do not attempt to clean off the excess epoxy with any solvents – doing so may damage your power meter 9.
1.2.1 Pod Placement 1.2.3 Clearance Check Locate a flat area on the inner face of the crank arm for installing the PrecisionTM power meter pod. There should be a minimum of 40 mm or 1 5/8 inches between the pod location and the pedal spindle. With the PrecisionTM pod fixed onto the crank arm as shown in section 1.2.2, slowly and carefully rotate the crank arm 1 full revolution to ensure there is no interference between the pod and any part of the bicycle frame.
1.2.4 Marking Install Location 2.2.2 Clean Crank Arm With the PrecisionTM pod fixed onto the crank arm as shown in section 1.2.2, place a small mark on your crank using a pencil or permanent marker adjacent to the center mark on the pod. This is use to mark the location of the pod for installation using the provided epoxy adhesive. Thoroughly clean the crank arm with soap and water to remove all dust and residue from sanding. Allow the crank arm to fully dry before adhering the pod.
2.3.2 Wipe Crank Arm Open one of the cleaning wipes and wipe the installation location of the crank arm. ! Slide the installation tool under the band and fix the pod in place with the installation tool. Only use supplied cleaning wipes for your installation – do not sand or use any other cleaning agents on the pod. Figure 2.4 2.3.3 Remove Protective Tape Remove the protective tape on the metal plate of the pod. Figure 2.5 Figure 2.2 2.3.
4iiii Innovation Inc. Model: PM100 Appendix I How to install the battery of the precisionTM power meter PM100 1. Turn the back cover of the product anti-clockwise to unlock it and take it off. 2. Remove the used battery and install new battery. 3. Fix the back cover to the product.
FCC Statement This equipment has been tested and found to comply with the limits for a Class B digital devi ce, pursuant to part 15 of FCC Rules. These limits are designed to provide reasonable protect ion against harmful interference in a residential installation. This equipment generates and c an radiate radio frequency energy and, if not installed and used in accordance with the instr uctions, may cause harmful interference to radio communications.
ne doit pas produire de brouillage, et (2) l’utilisateur de l’appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage est susceptible d’en compromettre le fonctionnement. Declaration of Conformity 4iiii Innovations Inc. declares that this product is in compliance with the essential requirements and other relevant provisions of Directive 1999/5/EC. To view the full Declaration of Conformity, go to www.4iiii.com/compliance.